QLDIn ForceRegulation
Coal Mining Safety and Health Regulation 2017
sec.315ERZ controller must be present during mining in ERZ1
Start here
Get a plain-English read of sec.315
Turn the raw legal text into a practical explanation grounded in Coal Mining Safety and Health Regulation 2017.
### sec.315 ERZ controller must be present during mining in ERZ1
The ERZ controller for an ERZ1 must be present in the zone whenever coal or stone is being mined, or strata control activities are being carried out, in the zone.
Subsection (1) does not apply if the controller is—
in an adjacent ERZ0 for which the controller has been appointed; or
inspecting plant, in a NERZ, in the immediate vicinity of the ERZ1.
(sec.315-ssec.1) The ERZ controller for an ERZ1 must be present in the zone whenever coal or stone is being mined, or strata control activities are being carried out, in the zone.
(sec.315-ssec.2) Subsection (1) does not apply if the controller is— in an adjacent ERZ0 for which the controller has been appointed; or inspecting plant, in a NERZ, in the immediate vicinity of the ERZ1.
- (a) in an adjacent ERZ0 for which the controller has been appointed; or
- (b) inspecting plant, in a NERZ, in the immediate vicinity of the ERZ1.