14 Residential uses are not permitted on land reserved as 9(c).
15 Under cl 9 of the LCLEP, the objectives of the Residential 2(a2) zone objectives are:
…to retain the existing residential amenity of detached single-family dwelling areas. New dwelling houses or extensions of existing dwelling- houses will be permitted only where they would not be highly visible when viewed from the Lane Cove River or Parramatta River.
16 Dwelling houses are permissible under cl 9 of the LCLEP in the 2(a2) zone without development consent.
17 Clause 18G of the LCLEP relates to the conservation of landscape/river scape qualities:
The council, when considering any application for consent to the erection of a structure or the carrying out of a work which will be visible from the site of an item described in Schedule 6, being a site shown on the heritage map (Items of Landscape Significance) must take into account the impact which that development will have on the heritage significance of the Lane Cove River or that landscape feature.
18 Under Schedule 6 of the LCLEP, the items of landscape significance include: 'Lane Cove River' being the river and waterway is listed as Item L1; and Woodford Bay is listed as L18.
Lane Cove Development Control Plan -Residential Zone, (RDCP)
19 Under Part II of the RDCP development in foreshore areas is addressed and the objective is to maintain existing residential amenity of foreshore residential development by:
(a) preserving or fairly apportioning water views from foreshore residents, and
(b) minimising the impact and prominence of foreshore development when viewed from Lane Cove or Parramatta Rivers.
(i) Foreshore building line to be setback 2m from escarpment;
(ii) Buildings are not permitted to exceed two levels at any point;
(iii) No dwelling shall be approved between the foreshore setback line and the river (foreshore setback area).
20 Under Part II of the RDCP the 'Area of Application' is land within 30m of the mean high water mark, (MHWM). Almost the whole of proposed Lots 1A and 2A would fall within this area. No dwelling house or other structure will be approved between the foreshore setback line set by the council and the respective river within the foreshore setback area.
21 Under Part VII of the RDCP, the objective is to allow 'residential Torrens title subdivision', which retains, and where appropriate, improves existing amenity and streetscape 'within residential zones', where:
· The minimum area of an allotment created under this Part is 550m2. The access handle of battle-axe allotments is not counted in the calculation of allotment size.
Lane Cove Development Control Plan No 1 - Development Adjacent to Bushland, (DCP1)
22 The aims of DCP1 are:
· To protect both public and private bushland from adjacent development, which could result in altered moisture conditions, increased nutrient levels, soil movement and invasive or inappropriate plant species.
· To retain and protect natural topographical features, remnant bushland areas, plant species and communities and native fauna habitat, which once prevailed, in this locality.
· To retain and regenerate areas of natural bushland which define the essential character of Lane Cove.
· To acknowledge the importance of bushland to the character and value of the locality and its importance in the region.
· To provide a set of development standards that encourage innovation and attractive design which acknowledges the importance of bushland areas through the control of building form, position, colours and materials, hard surface areas, stormwater disposal, soil erosion control, and landscape material adjacent to bushland.
23 DCP1 introduces the concept of a 'buffer' that is defined as:
…that part of the development site, which is a transition between the bushland and the building/s except where formed roads adjoin bushland.
24 Under the heading of 'Areas' DCP1 states:
Each site will be divided into three areas - building area, buffer area and bushland area. The extent of each area will be established by Council at the time of assessment of any application lodged, following a more detailed site inspection.
The owner, or an agent on the owner's behalf, may, however, request Council to provide a general indication of the bushland/buffer/building areas on their land. Applicants are encouraged to consult with Council's Bushland Manager prior to submitting an application.
25 As at 13 July 2005, the council's Bushland Manager was Mr T Matheson. Mr Matheson had a meeting with the applicant's architect, following, which he stated, [Note: Exhibit 10, p 42]:
It is my opinion that this property falls within SEPP19 and DCP1 even though the existing native vegetation on the property is of poor quality. As the soil stratum is undisturbed, and the neighbouring properties have good floral diversity, it is possible that this property has the required qualities for the native flora to regenerate.
For consideration of this subdivision proposal the proponent will need to address both DCP1 and SEPP19…
26 In a further internal memorandum dated 13 July 2005, and stated, [Note: Exhibit 10, pp53-7], he did not identify the boundaries between the bushland/buffer/building areas. If approval were granted to the subdivision application, he asked that the Regional Open Space reservation zone be fenced off during development of the land, and that bush/regeneration approved by him be undertaken.
27 Under the heading of 'Development within Areas' DCP1 states, [Note: Exhibit 5, pp 4-5]:
Bushland Area: This is the part of the development site adjoining bushland, which contains remnant bushland vegetation and other natural topographic features. It is an extension of the areas of bushland zoned or reserved for public open space purposes and should exhibit the same characteristics as that for the land zoned 'Bushland' under the Lane Cove LEP. It may be land, which is currently degraded but forms a continuous link with bushland on neighbouring properties…
Buffer Area: This is part of the development site, which is between the bushland and building areas. Its purpose is to provide a transition between the bushland and the building area to protect the bushland and allow for compatible use. Buildings are not permitted within this area. This can be used for ancillary works, such as outdoor living areas, stormwater detention/ absorption pits, runoff controls, indigenous plantings including vegetation planted adjacent to stormwater detention/absorption pits, services, pathways, filling, temporary storage of materials, bushfire fuel breaks.
Paving not to exceed 25% of this area.
The size of the area may vary depending on the site but a minimum depth of 10 metres should be taken as a guide. Where there is insufficient space for a buffer due to orientation, size or location of the development site, then the applicant must show how the adjacent bushland can be adequately protected according to the aims and objectives of this Plan.
Building Area: This is the part of the development site where buildings are permitted. Buildings, including swimming pools and outbuildings, are permitted in this area up to the common boundary with the buffer area. Paving should be minimised within this area. Significant trees should be retained and should be protected during construction to Council's satisfaction.
State and Regional Environmental Planning Policy No 19, (SREPP19)
28 The parties agree that SREPP19 applies to the land. The general aim of SEPP19 is to protect and preserve bushland within the urban areas of Lane Cove because of:
(a) its value to the community as part of the natural heritage,
(b) its aesthetic value, and
(c) its value as a recreational, educational and scientific resource.
29 Under SEPP19 'bushland' means land on which there is vegetation, which is either a remainder of the natural vegetation of the land or, if altered, is still representative of the structure and floristics of the natural vegetation.
State Environmental Planning Policy No 56 -Sydney Harbour Foreshore and Tributaries, (SEPP56)
30 SEPP56 applied when the application was lodged with the council, however, it has since been revoked and in its place is the Sydney Regional Environmental Plan (Sydney Harbour Catchment) 2005, (SREPSHC).
Sydney Regional Environmental Plan (Sydney Harbour Catchment) 2005, (SREPSHC)
31 Objective (e) of Zone W8 - Scenic Waters: Passive Use, of the SREPSHC is relevant and states, [Note: Exhibit 8, p 17]:
…to ensure that the scale and size of development are appropriate to the locality and protect and improve the natural assets and cultural scenic quality of the surrounding area, particularly when viewed from waters in this zone or areas of public access.
Sydney Harbour Foreshores and Waterways Area Development Control Plan, (WADCP)
32 The land falls within landscape character area Type 9, under the WADCP, [Exhibit 9, p 27]. Any development within this landscape is to satisfy the following performance criteria:
· it is sited so remaining rock outcrops, clifflines or vegetated shorelines are protected and not obscured;
· it is sited to ensure that the continuous line of any natural feature is preserved and remains the dominant feature in the landscape;
· it is sited and designed to maintain the vegetation cover on the upper slopes and ridgelines;
· …
· …
· colours should match native vegetation as closely as possible with trim colours drawn from natural elements such as tree trunks and stone.
The proposal and its history
33 Development application No D47/05 was lodged with the respondent council on 2 March 2005 to subdivide the land into four allotments.
34 The proposed subdivision is described in plans 20426/DA01, Revision B, dated 28 March 2006; 20426/DA02, Revision B, dated 28 March 2006, [Note: Exhibit C]. The indicative architectural plans of dwellings on Lots 1A and 2A in Exhibit B include: No 20426/CD00 Revision C dated 28 April 2006; 20426/CD01B; 20426/CD02B; 20426/CD03B; 20426/CD04B; 20426/CD05B; 20426/CD06B; 20426/CD07B; 20426/CD08B; 20426/CD09B, dated 28 March 2006.
35 The subdivision proposal would include the construction of a new driveway and within a right-of-way located between the two existing dwellings to serve the four new allotments and 'future raised mechanical car turntable and platform'. Some site preparation would be required to construct the new turning area to stabilise the land.
36 The site area of each lot (excluding the vehicle access handle) would be, for site No 1, 620m2; site No 2, 612m2; site No 1A to the north, 623m2; and site No 2A to the south, 660m2. Sites No 1A and 2A have been calculated to include the area of the 9(c) reservation zone.
37 The 'future raised mechanical car turntable and platform' would be elevated around 9m above the natural ground, setback about 6.5m from the landward boundary with the Regional Open Space and would extend around 9m to the south of the escarpment, [Note: Exhibit C, Section A].
38 The development application was supported by Statement of Environmental Effects prepared by Ooi Personal Planning Services Pty Limited, dated March 2005; Survey Plan prepared by T J Glibert & Associates, dated 21 April 2005; Geotechnical Report dated, 16 May 2005 prepared by Shirley Consulting Engineers Pty Limited; Waste Management plan; State Environmental Planning Policy No 19, (SEPP19) and Lane Cove Council Development Control Plan No 7, (DCP7) Assessments 95 prepared by Ambrose Ecological Services Pty Limited, dated 8 September 2005; Arborist report prepared by Tree Wise Men Pty Limited, dated 2005.
Notification
39 The application was notified to nearby owners and occupants on two occasions. The first was on 7 March 2005 and the council received sixteen (16) submissions.
40 The concerns on this occasion were:
· Retention of the foreshore area and bushland.
· No suitable building sites on the proposed allotments.
· Access to the site in narrow and unworkable.
· Access for construction of dwellings on the proposed allotments.
· Precedent set by granting such consent.
· Concerns re bird and possum colonies.
· Effect of driveway on the foreshore vista.
· Visual and physical amenity of the neighbourhood reservation of bushland.
· Visual impact from the water of dwelling houses.
· Foreshore building line, 2m from escarpment.
41 The second notification occurred on 3 June 2005 when the applicant provided the additional dwelling concept plans and photomontage, and the council received five (5) submissions.
42 The concerns were:
· Concept dwelling plans are unenforceable.
· Proposed dwellings destroy native bushland and waterfront sandstone escarpment landscape. Buffer zone required in DCP1 of 10m for bushland reserve proposed dwellings encroach onto set back requirements.
· Proposed dwellings will have a detrimental effect when viewed from the water.
· Construction process will have adverse impacts on the land.
· More historical information needed about the site.
The council's decision
43 When the appeal was filed on 4 October 2005, the council had not yet determined the application, thus the appeal is on the basis of a deemed refusal. On 7 March 2006, the council refused the development application for eight reasons, [Note: Exhibit 10, pp 153-4]. These reasons are reflected in the issues in this appeal.
The hearing
44 At the hearing the court heard evidence on behalf of the respondent council from:
· Mr B J McDonald, heritage architect and town planner;
· Mr R S Lembit, ecologist;
· Mr P San Miguel, on behalf of his mother who is resident of No 5 Birriwa Place;
· Mr David Cook, President of the Northwood Action Group and resident;
· Ms J Rowe, resident of No 83 Northwood Road, Northwood;
· Ms S Price, resident of No 79 Northwood Road, Northwood;
· Mr P H Apps, resident of No 81 Northwood Road, Northwood, [Note: Exhibit 19]; and
· Mr R Paisely resident of No 1A Biriwa Place.
45 On behalf of the applicant evidence was given by:
· Mr M W Harrison, architect and town planner;
· Dr S Ambrose, consultant ecologist; and
· Mr P N Castor, arborist.
46 The Court-appointed urban designer was Mr N R Dickson, architect/town planner.
47 Mr S Pratt, Manager -Development Assessment prepared a statement of basic facts dated 8 November 2005.
The issues
48 On 8 November 2005, the council filed a statement of issues.
Heritage/scenic impacts
1 the development which includes:
1.1 the installation of a driveway and the carrying out of excavation, geotechnical land stabilisation works and clearing vegetation:
1.2 and the creation of two additional allotments for residential use and occupation with associated further residential dwellings, outbuildings and structures thereon:
will have an adverse impact on the foreshore of Woodford Bay.
Particulars
Woodford Bay is an item of heritage significance in the heritage map within the Lane Cove Local Environmental Plan 1987 (LEP 1987) and hence clause 18G. and Schedule 6 of the LEP 1987 apply.
See also the Planning Principles set out in paragraphs 12 and 13(b), (c), (f) and 1(a), (b), (d) Sydney Regional Environmental Plan (Sydney Harbour Catchment) 2005 ("SREP (Sydney Harbour Catchment) 2005").
2 The development as described in paragraphs 1.1 and 1.2 above:
2.1 is of an inappropriate size and scale;
2.2 does not protect and improve the natural assets and natural and cultural scenic quality of the surrounding area particularly when viewed from Woodford Bay;
Particulars
Part of the land is zoned Scenic Waters: Passive Use -Zone No W8, SREP (Sydney Harbour Catchment) 2005 and development thereon must be consistent with the objectives of the zone pursuant to clause 17(2) thereof. The relevant zone objective contravened is Objective (e) of Zone No W8.
The whole of the land the subject of the development is land within the Foreshores and Waterways Area of SREP (Sydney Harbour Catchment) 2005 and clauses 25 and 26 apply.
The Sydney Harbour Foreshore and Waterways Area Development Control Plan 2005 applies to the whole of the land and part 3.2 thereof requires that the development mini mise any significant impact on views and vistas to and from Woodford Bay
2.3 will have an adverse cumulative environmental impact.
Particulars
Clause 21(h) applies of the whole of the land and requires consideration of the cumulative environmental impact of the development.
2.4 is not sited
2.4.1 so remaining rock outcrops, cliff lines or vegetated shorelands are protected and not obscured;
2.4.2 to ensure that the continuous line of any natural feature is preserved and remains the dominant feature in the landscape;
2.4.3 to maintain the vegetation cover on the upper slopes and ridgeline;
Particulars
Pursuant to the Sydney Harbour Foreshores and Waterways Area Development Control Plan 2005 the land is Landscape Character Type 9 and the Statement of Character and Intent therein applies
3 The development as described in paragraphs 1.1 and 1.2 above:
Deleted.
4 It is likely the new dwellings erected on the newly created allotments will be highly visible when viewed from the Lane Cove River contrary to the objectives of the zone.
Particulars
The zone 2(a)(ii) Objectives LEP 1987
Clause 9(3) of the LEP1987
5 Bushland impacts
5.1 the development will have an adverse impact on the natural vegetation, landforms and topographical features of the bushland the subject of the proposed subdivision, including, but not limited to that portion of the site is zoned regional open space reservation.
Particulars
DCP1-control of development adjacent to bush land, clauses 2, 5 to 12.
SEPP19 clauses 6 and 7.
SEPP56 clauses 6 and 7(d).
The planning principles set out in paragraphs 12 and 13(j) SREP (Sydney Harbour Catchment) 2005.
The development as described in 5.1 above, is contrary to the aims and objectives of the LEP 1987 in relation to conservation.
Particulars
LEP1987 clause 2(d)(i), (ii) and (iii)
5.3 No 1 Birriwa Place adjoins bushland zoned for open space purposes and the development will have an adverse impact thereon.
Particulars
SEPP 19 clause 9.
SEPP56 clauses 6 and 7(d).
Planning principles set out in paragraph 12s and 13(j) SREP (Sydney Harbour Catchment) 2005.