QLDIn ForceAct
Water Supply (Safety and Reliability) Act 2008
sec.398Amending flood mitigation manual in response to review
Start here
Get a plain-English read of sec.398
Turn the raw legal text into a practical explanation grounded in Water Supply (Safety and Reliability) Act 2008.
### sec.398 Amending flood mitigation manual in response to review
If the chief executive—
reviews the safety requirements applying under the flood mitigation manual for the dam; and
having regard to the temporary full supply level, considers an amendment of the safety requirements is necessary;
the chief executive must advise the Minister of the proposed amendment.
On receiving advice of an amendment, the Minister may arrange for the amendment to be made under section 372 .
s 398 ins 2012 No. 29 s 32
(sec.398-ssec.1) If the chief executive— reviews the safety requirements applying under the flood mitigation manual for the dam; and having regard to the temporary full supply level, considers an amendment of the safety requirements is necessary; the chief executive must advise the Minister of the proposed amendment.
(sec.398-ssec.2) On receiving advice of an amendment, the Minister may arrange for the amendment to be made under section 372 .
- (a) reviews the safety requirements applying under the flood mitigation manual for the dam; and
- (b) having regard to the temporary full supply level, considers an amendment of the safety requirements is necessary;