QLDIn ForceAct
Water Supply (Safety and Reliability) Act 2008
sec.374Preparation and submission of new manual
Start here
Get a plain-English read of sec.374
Turn the raw legal text into a practical explanation grounded in Water Supply (Safety and Reliability) Act 2008.
### sec.374 Preparation and submission of new manual
This section applies if an approved flood mitigation manual for a dam is in force.
The owner of the dam must prepare a new flood mitigation manual for the dam and give it to the Minister for approval under division 3 at least 1 month before the end of the approval period for the manual.
Maximum penalty—1,665 penalty units.
s 374 sub 2012 No. 29 s 32
(sec.374-ssec.1) This section applies if an approved flood mitigation manual for a dam is in force.
(sec.374-ssec.2) The owner of the dam must prepare a new flood mitigation manual for the dam and give it to the Minister for approval under division 3 at least 1 month before the end of the approval period for the manual. Maximum penalty—1,665 penalty units.