sec.258Reviewing recycled water management plans
Start here
Get a plain-English read of sec.258
Turn the raw legal text into a practical explanation grounded in Water Supply (Safety and Reliability) Act 2008.
### sec.258 Reviewing recycled water management plans
The relevant entity for a recycled water scheme must, at each required interval, conduct a review of the approved recycled water management plan for the scheme to assess whether the plan is consistent with—
the operation of the scheme; and
the water quality criteria for recycled water relevant to the scheme; and
best practice industry standards for the production and supply of recycled water.
Maximum penalty—500 penalty units.
If the recycled water scheme is a multiple-entity recycled water scheme, the relevant entity complies with subsection (1) if a declared entity for the scheme conducts the review in accordance with subsection (1) .
In this section—
required interval means an interval, at which regular reviews of the approved recycled water management plan must be conducted, stated in the notice about the plan under section 206 (2) (b) .
s 258 sub 2023 No. 24 s 68
(sec.258-ssec.1) The relevant entity for a recycled water scheme must, at each required interval, conduct a review of the approved recycled water management plan for the scheme to assess whether the plan is consistent with— the operation of the scheme; and the water quality criteria for recycled water relevant to the scheme; and best practice industry standards for the production and supply of recycled water. Maximum penalty—500 penalty units.
(sec.258-ssec.2) If the recycled water scheme is a multiple-entity recycled water scheme, the relevant entity complies with subsection (1) if a declared entity for the scheme conducts the review in accordance with subsection (1) .
(sec.258-ssec.3) In this section— required interval means an interval, at which regular reviews of the approved recycled water management plan must be conducted, stated in the notice about the plan under section 206 (2) (b) .
- (a) the operation of the scheme; and
- (b) the water quality criteria for recycled water relevant to the scheme; and
- (c) best practice industry standards for the production and supply of recycled water.