QLDIn ForceAct
Waste Reduction and Recycling Act 2011
sec.164End of waste code prepared by technical advisory panel
Start here
Get a plain-English read of sec.164
Turn the raw legal text into a practical explanation grounded in Waste Reduction and Recycling Act 2011.
### sec.164 End of waste code prepared by technical advisory panel
This section applies if a technical advisory panel prepares a draft end of waste code (the draft code ).
Subsection (3) applies if the chief executive is satisfied a technical advisory panel has not—
had regard to a matter mentioned in section 163 ; or
included a requirement in the draft code that the chief executive required the panel to include in the draft code.
The chief executive may—
ask the technical advisory panel to amend the draft code; or
refuse to accept the draft code.
The chief executive may amend the draft code before publishing it under section 166 .
s 164 sub 2014 No. 59 s 167
(sec.164-ssec.1) This section applies if a technical advisory panel prepares a draft end of waste code (the draft code ).
(sec.164-ssec.2) Subsection (3) applies if the chief executive is satisfied a technical advisory panel has not— had regard to a matter mentioned in section 163 ; or included a requirement in the draft code that the chief executive required the panel to include in the draft code.
(sec.164-ssec.3) The chief executive may— ask the technical advisory panel to amend the draft code; or refuse to accept the draft code.
(sec.164-ssec.4) The chief executive may amend the draft code before publishing it under section 166 .
- (a) had regard to a matter mentioned in section 163 ; or
- (b) included a requirement in the draft code that the chief executive required the panel to include in the draft code.
- (a) ask the technical advisory panel to amend the draft code; or
- (b) refuse to accept the draft code.