QLDIn ForceAct
Surat Basin Rail (Infrastructure Development and Management) Act 2012
sec.25Care to be taken in entering land
Start here
Get a plain-English read of sec.25
Turn the raw legal text into a practical explanation grounded in Surat Basin Rail (Infrastructure Development and Management) Act 2012.
### sec.25 Care to be taken in entering land
This section applies if the Coordinator-General, an authorised person or associated person enters land to—
carry out railway works; or
investigate the potential suitability of the land for an expansion or realignment of the Surat Basin rail corridor land.
The Coordinator-General, authorised person or associated person—
must take as much care as is practicable to minimise damage to the land or inconvenience to the land’s owner or occupier; and
may do anything necessary or desirable to minimise the damage or inconvenience.
(sec.25-ssec.1) This section applies if the Coordinator-General, an authorised person or associated person enters land to— carry out railway works; or investigate the potential suitability of the land for an expansion or realignment of the Surat Basin rail corridor land.
(sec.25-ssec.2) The Coordinator-General, authorised person or associated person— must take as much care as is practicable to minimise damage to the land or inconvenience to the land’s owner or occupier; and may do anything necessary or desirable to minimise the damage or inconvenience.
- (a) carry out railway works; or
- (b) investigate the potential suitability of the land for an expansion or realignment of the Surat Basin rail corridor land.
- (a) must take as much care as is practicable to minimise damage to the land or inconvenience to the land’s owner or occupier; and
- (b) may do anything necessary or desirable to minimise the damage or inconvenience.