QLDIn ForceAct
South-East Queensland Water (Distribution and Retail Restructuring) Act 2009
sec.99BLRequirement for SEQ service provider to review plan
Start here
Get a plain-English read of sec.99BL
Turn the raw legal text into a practical explanation grounded in South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.
### sec.99BL Requirement for SEQ service provider to review plan
An SEQ service provider must, within each 5-year period starting on 1 October 2014, review its water netserv plan to ensure the plan—
is consistent with—
the SEQ regional plan; and
the relevant planning assumptions; and
achieves the purposes of the plan under section 99BM .
Without limiting subsection (1) , an SEQ service provider must—
before 1 October each year, review the connection areas under its water netserv plan; and
within each 5-year period starting on 1 October 2014, review the future connection areas under its water netserv plan.
If a connection under a water approval to an SEQ service provider’s infrastructure network occurs outside of its connection area—
the location of the connection is taken to be part of its connection area; and
the SEQ service provider must, as soon as practicable, update its connection area in its water netserv plan under subsection (2) .
s 99BL ins 2010 No. 20 s 21
amd 2012 No. 1 s 58 ; 2013 No. 23 s 197
sub 2014 No. 16 s 15
(sec.99BL-ssec.1) An SEQ service provider must, within each 5-year period starting on 1 October 2014, review its water netserv plan to ensure the plan— is consistent with— the SEQ regional plan; and the relevant planning assumptions; and achieves the purposes of the plan under section 99BM .
(sec.99BL-ssec.2) Without limiting subsection (1) , an SEQ service provider must— before 1 October each year, review the connection areas under its water netserv plan; and within each 5-year period starting on 1 October 2014, review the future connection areas under its water netserv plan.
(sec.99BL-ssec.3) If a connection under a water approval to an SEQ service provider’s infrastructure network occurs outside of its connection area— the location of the connection is taken to be part of its connection area; and the SEQ service provider must, as soon as practicable, update its connection area in its water netserv plan under subsection (2) .
- (a) is consistent with— (i) the SEQ regional plan; and (ii) the relevant planning assumptions; and
- (i) the SEQ regional plan; and
- (ii) the relevant planning assumptions; and
- (b) achieves the purposes of the plan under section 99BM .
- (i) the SEQ regional plan; and
- (ii) the relevant planning assumptions; and
- (a) before 1 October each year, review the connection areas under its water netserv plan; and
- (b) within each 5-year period starting on 1 October 2014, review the future connection areas under its water netserv plan.
- (a) the location of the connection is taken to be part of its connection area; and
- (b) the SEQ service provider must, as soon as practicable, update its connection area in its water netserv plan under subsection (2) .