QLDIn ForceRegulation
South Bank Corporation By-law 2014
sec.11Temporary closure of the site
Start here
Get a plain-English read of sec.11
Turn the raw legal text into a practical explanation grounded in South Bank Corporation By-law 2014.
### sec.11 Temporary closure of the site
The corporation may temporarily close the site if it considers it is necessary, or convenient, having regard to any of the following—
the safety of persons, or the protection of property, on the site;
an activity to be conducted on the site;
another relevant matter.
The closure may, but need not, be for a particular period every day.
While the site is closed, the corporation must display a sign at each entry to the site stating the site is closed.
(sec.11-ssec.1) The corporation may temporarily close the site if it considers it is necessary, or convenient, having regard to any of the following— the safety of persons, or the protection of property, on the site; an activity to be conducted on the site; another relevant matter.
(sec.11-ssec.2) The closure may, but need not, be for a particular period every day.
(sec.11-ssec.3) While the site is closed, the corporation must display a sign at each entry to the site stating the site is closed.
- (a) the safety of persons, or the protection of property, on the site;
- (b) an activity to be conducted on the site;
- (c) another relevant matter.