QLDIn ForceRegulation
Queensland Building and Construction Commission Regulation 2018
sec.60Licences that may be held and renewed after commencement— Act , s 30
Start here
Get a plain-English read of sec.60
Turn the raw legal text into a practical explanation grounded in Queensland Building and Construction Commission Regulation 2018.
### sec.60 Licences that may be held and renewed after commencement— Act , s 30
For section 30 (4) of the Act , the following classes of licence are specified—
building restricted to alterations and additions
building restricted to external finishes
building restricted to building removal
building restricted to renovations, repairs and maintenance
building restricted to repairs and maintenance
building restricted to non-structural renovations
carpentry (formwork)
carpentry restricted to framing
carpentry restricted to lattice and other timber work
concreting restricted to concrete repairs
concreting restricted to light concreting
concreting restricted to minor repairs
concreting restricted to special finishes
specialised contracting—screw-in foundations
floor finishing and covering restricted to floor sanding and finishing—timber floors
floor finishing and covering restricted to install floating flooring
floor finishing and covering restricted to install strip flooring (non-structural)
floor finishing and covering restricted to seamless flooring
floor finishing and covering restricted to install cork flooring
floor finishing and covering restricted to install parquetry flooring
painting restricted to roof painting
painting restricted to special finishes
plastering drywall restricted to cornice fixing
plastering drywall restricted to partition installation
plastering drywall restricted to plaster setting
plastering drywall restricted to suspended ceiling fixing
plastering drywall restricted to wallboard fixing
plumbing and draining restricted to plumbing
plumbing and draining restricted to wall cladding
plumbing and draining restricted to skylight and ventilator installation
plumbing and draining restricted to tanks—water supply
specialised contracting—solid fuel heater installation
refrigeration, air conditioning and mechanical services restricted to multipackaged residential air conditioning equipment and plant
refrigeration, air conditioning and mechanical services restricted to residential evaporative cooling equipment
refrigeration, air conditioning and mechanical services restricted to self-contained window package residential air conditioning installation
roof tiling restricted to roof tile maintenance
structural landscaping restricted to fences
structural landscaping restricted to retaining walls
swimming pool and spa construction restricted to finishes.
See also section 43 of the expired regulation.
While a licensee holds a class of licence in subsection (1), the provisions of schedule 2 of the repealed Queensland Building Services Authority Regulation 1992 as in force immediately before 1 September 2003 are taken to continue to apply to the licence.
(sec.60-ssec.1) For section 30 (4) of the Act , the following classes of licence are specified— building restricted to alterations and additions building restricted to external finishes building restricted to building removal building restricted to renovations, repairs and maintenance building restricted to repairs and maintenance building restricted to non-structural renovations carpentry (formwork) carpentry restricted to framing carpentry restricted to lattice and other timber work concreting restricted to concrete repairs concreting restricted to light concreting concreting restricted to minor repairs concreting restricted to special finishes specialised contracting—screw-in foundations floor finishing and covering restricted to floor sanding and finishing—timber floors floor finishing and covering restricted to install floating flooring floor finishing and covering restricted to install strip flooring (non-structural) floor finishing and covering restricted to seamless flooring floor finishing and covering restricted to install cork flooring floor finishing and covering restricted to install parquetry flooring painting restricted to roof painting painting restricted to special finishes plastering drywall restricted to cornice fixing plastering drywall restricted to partition installation plastering drywall restricted to plaster setting plastering drywall restricted to suspended ceiling fixing plastering drywall restricted to wallboard fixing plumbing and draining restricted to plumbing plumbing and draining restricted to wall cladding plumbing and draining restricted to skylight and ventilator installation plumbing and draining restricted to tanks—water supply specialised contracting—solid fuel heater installation refrigeration, air conditioning and mechanical services restricted to multipackaged residential air conditioning equipment and plant refrigeration, air conditioning and mechanical services restricted to residential evaporative cooling equipment refrigeration, air conditioning and mechanical services restricted to self-contained window package residential air conditioning installation roof tiling restricted to roof tile maintenance structural landscaping restricted to fences structural landscaping restricted to retaining walls swimming pool and spa construction restricted to finishes. See also section 43 of the expired regulation.
(sec.60-ssec.2) While a licensee holds a class of licence in subsection (1), the provisions of schedule 2 of the repealed Queensland Building Services Authority Regulation 1992 as in force immediately before 1 September 2003 are taken to continue to apply to the licence.
- • building restricted to alterations and additions
- • building restricted to external finishes
- • building restricted to building removal
- • building restricted to renovations, repairs and maintenance
- • building restricted to repairs and maintenance
- • building restricted to non-structural renovations
- • carpentry (formwork)
- • carpentry restricted to framing
- • carpentry restricted to lattice and other timber work
- • concreting restricted to concrete repairs
- • concreting restricted to light concreting
- • concreting restricted to minor repairs
- • concreting restricted to special finishes
- • specialised contracting—screw-in foundations
- • floor finishing and covering restricted to floor sanding and finishing—timber floors
- • floor finishing and covering restricted to install floating flooring
- • floor finishing and covering restricted to install strip flooring (non-structural)
- • floor finishing and covering restricted to seamless flooring
- • floor finishing and covering restricted to install cork flooring
- • floor finishing and covering restricted to install parquetry flooring
- • painting restricted to roof painting
- • painting restricted to special finishes
- • plastering drywall restricted to cornice fixing
- • plastering drywall restricted to partition installation
- • plastering drywall restricted to plaster setting
- • plastering drywall restricted to suspended ceiling fixing
- • plastering drywall restricted to wallboard fixing
- • plumbing and draining restricted to plumbing
- • plumbing and draining restricted to wall cladding
- • plumbing and draining restricted to skylight and ventilator installation
- • plumbing and draining restricted to tanks—water supply
- • specialised contracting—solid fuel heater installation
- • refrigeration, air conditioning and mechanical services restricted to multipackaged residential air conditioning equipment and plant
- • refrigeration, air conditioning and mechanical services restricted to residential evaporative cooling equipment
- • refrigeration, air conditioning and mechanical services restricted to self-contained window package residential air conditioning installation
- • roof tiling restricted to roof tile maintenance
- • structural landscaping restricted to fences
- • structural landscaping restricted to retaining walls
- • swimming pool and spa construction restricted to finishes.