QLDIn ForceRegulation
Queensland Building and Construction Commission Regulation 2018
sch.2-sec.2-oc.54Scope of work
Start here
Get a plain-English read of sch.2-sec.2-oc.54
Turn the raw legal text into a practical explanation grounded in Queensland Building and Construction Commission Regulation 2018.
### sch.2-sec.2-oc.54 Scope of work
For the licence class mentioned in section 1 (1)—
site survey, including use dumpy and laser levelling equipment; and
sample, test and assess materials on building sites, including moisture testing, particle distribution testing, and field strength testing; and
classify building sites through the interpretation of site and laboratory data; and
prepare plans, specifications and documents for on-site domestic waste water management.
For the licence class mentioned in section 1 (2), the work mentioned in subsection (1) (a) to (c) .
(sch.2-sec.2-oc.54-ssec.1) For the licence class mentioned in section 1 (1)— site survey, including use dumpy and laser levelling equipment; and sample, test and assess materials on building sites, including moisture testing, particle distribution testing, and field strength testing; and classify building sites through the interpretation of site and laboratory data; and prepare plans, specifications and documents for on-site domestic waste water management.
(sch.2-sec.2-oc.54-ssec.2) For the licence class mentioned in section 1 (2), the work mentioned in subsection (1) (a) to (c) .
- (a) site survey, including use dumpy and laser levelling equipment; and
- (b) sample, test and assess materials on building sites, including moisture testing, particle distribution testing, and field strength testing; and
- (c) classify building sites through the interpretation of site and laboratory data; and
- (d) prepare plans, specifications and documents for on-site domestic waste water management.