### sch.2-sec.2-oc.52 Scope of work
The following building work for sheds, carports and garages that are class 10a buildings with a floor area of not more than 100m 2 —
prepare, fabricate and erect metal components;
prepare site for, and install, concrete floor slab.
Incidental work of another class.
(sch.2-sec.2-oc.52-ssec.1) The following building work for sheds, carports and garages that are class 10a buildings with a floor area of not more than 100m 2 — prepare, fabricate and erect metal components; prepare site for, and install, concrete floor slab.
(sch.2-sec.2-oc.52-ssec.2) Incidental work of another class.
- (a) prepare, fabricate and erect metal components;
- (b) prepare site for, and install, concrete floor slab.