QLDIn ForceRegulation
Queensland Building and Construction Commission Regulation 2018
sch.2-sec.2-oc.47Scope of work
Start here
Get a plain-English read of sch.2-sec.2-oc.47
Turn the raw legal text into a practical explanation grounded in Queensland Building and Construction Commission Regulation 2018.
### sch.2-sec.2-oc.47 Scope of work
For the licence class mentioned in section 1 (1)—
concrete work for solid plastering, including installing formwork, reinforcement and concrete; and
fix steel for solid plastering; and
cut with oxyacetylene for solid plastering; and
apply float and set coats for hard plaster-flat surfaces; and
apply solid render; and
apply trowelled texture-coat finishes; and
install pre-cast decorative mouldings; and
install cast plaster blockwork; and
construct plaster mouldings; and
conite construction; and
apply paint for decorative, protective or technical purposes; and
incidental work of another class.
For the licence class mentioned in section 1 (2), the scope of work mentioned in subsection (1) (a) to (j) and (l) .
(sch.2-sec.2-oc.47-ssec.1) For the licence class mentioned in section 1 (1)— concrete work for solid plastering, including installing formwork, reinforcement and concrete; and fix steel for solid plastering; and cut with oxyacetylene for solid plastering; and apply float and set coats for hard plaster-flat surfaces; and apply solid render; and apply trowelled texture-coat finishes; and install pre-cast decorative mouldings; and install cast plaster blockwork; and construct plaster mouldings; and conite construction; and apply paint for decorative, protective or technical purposes; and incidental work of another class.
(sch.2-sec.2-oc.47-ssec.2) For the licence class mentioned in section 1 (2), the scope of work mentioned in subsection (1) (a) to (j) and (l) .
- (a) concrete work for solid plastering, including installing formwork, reinforcement and concrete; and
- (b) fix steel for solid plastering; and
- (c) cut with oxyacetylene for solid plastering; and
- (d) apply float and set coats for hard plaster-flat surfaces; and
- (e) apply solid render; and
- (f) apply trowelled texture-coat finishes; and
- (g) install pre-cast decorative mouldings; and
- (h) install cast plaster blockwork; and
- (i) construct plaster mouldings; and
- (j) conite construction; and
- (k) apply paint for decorative, protective or technical purposes; and
- (l) incidental work of another class.