QLDIn ForceRegulation
Queensland Building and Construction Commission Regulation 2018
sch.2-sec.2-oc.19Scope of work
Start here
Get a plain-English read of sch.2-sec.2-oc.19
Turn the raw legal text into a practical explanation grounded in Queensland Building and Construction Commission Regulation 2018.
### sch.2-sec.2-oc.19 Scope of work
Installing, commissioning, maintaining and testing above and below ground waste water, stormwater and sanitary drainage systems, including on-site domestic waste water management systems.
Prepare plans and specifications for drainage work that are—
for the licensee’s personal use; or
for use in drainage work to be performed by the licensee personally.
Incidental work of another class.
(sch.2-sec.2-oc.19-ssec.1) Installing, commissioning, maintaining and testing above and below ground waste water, stormwater and sanitary drainage systems, including on-site domestic waste water management systems.
(sch.2-sec.2-oc.19-ssec.2) Prepare plans and specifications for drainage work that are— for the licensee’s personal use; or for use in drainage work to be performed by the licensee personally.
(sch.2-sec.2-oc.19-ssec.3) Incidental work of another class.
- (a) for the licensee’s personal use; or
- (b) for use in drainage work to be performed by the licensee personally.