QLDIn ForceAct
Petroleum and Gas (Production and Safety) Act 2004
sec.995Determining period for exemption for production testing—s 591A
Start here
Get a plain-English read of sec.995
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.995 Determining period for exemption for production testing—s 591A
This section applies to petroleum mentioned in section 591A(2) that is produced before the commencement.
For section 591A(3)(a), the sum of all periods after 31 December 2004 for the petroleum must include the periods for which, under former section 73(2) or former section 152(2), production testing was authorised to be carried out in relation to the petroleum.
In this section—
former , in relation to a provision, means the provision as in force from time to time before its omission under the Common Provisions Act.
s 995 ins 2018 No. 24 s 233
(sec.995-ssec.1) This section applies to petroleum mentioned in section 591A(2) that is produced before the commencement.
(sec.995-ssec.2) For section 591A(3)(a), the sum of all periods after 31 December 2004 for the petroleum must include the periods for which, under former section 73(2) or former section 152(2), production testing was authorised to be carried out in relation to the petroleum.
(sec.995-ssec.3) In this section— former , in relation to a provision, means the provision as in force from time to time before its omission under the Common Provisions Act.