QLDIn ForceAct
Petroleum and Gas (Production and Safety) Act 2004
sec.982Statement on approved form under s 290 if water observation bore drilled before the commencement
Start here
Get a plain-English read of sec.982
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.982 Statement on approved form under s 290 if water observation bore drilled before the commencement
This section applies if a petroleum tenure holder or a water monitoring authority holder is transferring, under section 290, a water observation bore drilled under previous section 282.
The requirement under section 290(2) is taken to be satisfied if the holder gives the chief executive a signed notice stating previous section 282 has been complied with for the bore.
s 982 ins 2013 No. 23 s 185
(sec.982-ssec.1) This section applies if a petroleum tenure holder or a water monitoring authority holder is transferring, under section 290, a water observation bore drilled under previous section 282.
(sec.982-ssec.2) The requirement under section 290(2) is taken to be satisfied if the holder gives the chief executive a signed notice stating previous section 282 has been complied with for the bore.