QLDIn ForceAct
Petroleum and Gas (Production and Safety) Act 2004
sec.543ANotice about water injection bore, water observation bore or water supply bore to Water Act regulator
Start here
Get a plain-English read of sec.543A
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.543A Notice about water injection bore, water observation bore or water supply bore to Water Act regulator
This section applies if a person—
drills a water injection bore, water observation bore or water supply bore; or
converts a petroleum well to a water injection bore, water observation bore or water supply bore.
The person must, within 60 business days after the day the drilling or conversion starts, give a notice to the Water Act regulator stating the information prescribed under a regulation about the bore.
s 543A ins 2013 No. 23 s 183
amd 2014 No. 47 s 633
(sec.543A-ssec.1) This section applies if a person— drills a water injection bore, water observation bore or water supply bore; or converts a petroleum well to a water injection bore, water observation bore or water supply bore.
(sec.543A-ssec.2) The person must, within 60 business days after the day the drilling or conversion starts, give a notice to the Water Act regulator stating the information prescribed under a regulation about the bore.
- (a) drills a water injection bore, water observation bore or water supply bore; or
- (b) converts a petroleum well to a water injection bore, water observation bore or water supply bore.