Petroleum and Gas (Production and Safety) Act 2004
sec.427Requirement to consult if construction affects existing pipeline or infrastructure
Start here
Get a plain-English read of sec.427
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.427 Requirement to consult if construction affects existing pipeline or infrastructure
This section applies if a public road authority proposes to construct or change a public road in a way that is likely to affect the location, operation or safety of—
a pipeline; or
infrastructure constructed in the carrying out of a stated pipeline licence incidental activity.
The authority must give the relevant pipeline licence holder a notice stating—
details of the proposed road or proposed change; and
that the holder may, within a stated period, lodge submissions to the authority about the proposal at the office of the authority stated in the notice.
The stated period must not end before 30 business days after the notice is given.
Before deciding to implement the proposal, the authority must consider any submissions lodged by the holder within the stated period.
If the authority decides to implement the proposal, it must give the holder notice of the decision.
s 427 amd 2013 No. 10 s 184
(sec.427-ssec.1) This section applies if a public road authority proposes to construct or change a public road in a way that is likely to affect the location, operation or safety of— a pipeline; or infrastructure constructed in the carrying out of a stated pipeline licence incidental activity.
(sec.427-ssec.2) The authority must give the relevant pipeline licence holder a notice stating— details of the proposed road or proposed change; and that the holder may, within a stated period, lodge submissions to the authority about the proposal at the office of the authority stated in the notice.
(sec.427-ssec.3) The stated period must not end before 30 business days after the notice is given.
(sec.427-ssec.4) Before deciding to implement the proposal, the authority must consider any submissions lodged by the holder within the stated period.
(sec.427-ssec.5) If the authority decides to implement the proposal, it must give the holder notice of the decision.
- (a) a pipeline; or
- (b) infrastructure constructed in the carrying out of a stated pipeline licence incidental activity.
- (a) details of the proposed road or proposed change; and
- (b) that the holder may, within a stated period, lodge submissions to the authority about the proposal at the office of the authority stated in the notice.