sec.392AYProposed geothermal or GHG lease declared a coordinated project
Start here
Get a plain-English read of sec.392AY
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.392AY Proposed geothermal or GHG lease declared a coordinated project
This section applies for a petroleum lease application if—
before the making of the application, a coordinated project was declared; and
the project is, or includes, a proposed geothermal lease or GHG lease (the proposed lease ) for land the subject of the application.
The application must not be decided until—
if no application is made for the proposed lease within 1 year after the making of the declaration—the end of that year; or
if an application is made for the proposed lease within that year—that application is decided.
s 392AY ins 2009 No. 3 s 554
sub 2010 No. 31 s 549
amd 2012 No. 43 s 325 sch 2
(sec.392AY-ssec.1) This section applies for a petroleum lease application if— before the making of the application, a coordinated project was declared; and the project is, or includes, a proposed geothermal lease or GHG lease (the proposed lease ) for land the subject of the application.
(sec.392AY-ssec.2) The application must not be decided until— if no application is made for the proposed lease within 1 year after the making of the declaration—the end of that year; or if an application is made for the proposed lease within that year—that application is decided.
- (a) before the making of the application, a coordinated project was declared; and
- (b) the project is, or includes, a proposed geothermal lease or GHG lease (the proposed lease ) for land the subject of the application.
- (a) if no application is made for the proposed lease within 1 year after the making of the declaration—the end of that year; or
- (b) if an application is made for the proposed lease within that year—that application is decided.