QLDIn ForceAct
Petroleum and Gas (Production and Safety) Act 2004
sec.363FNotice of entry under s 363E
Start here
Get a plain-English read of sec.363F
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.363F Notice of entry under s 363E
Before entering land under section 363E (1) , an authority to prospect holder must, at least 10 business days before the entry, give the mineral (f) tenure holder for the land a notice stating the following—
the area of the overlapping mineral (f) land proposed to be entered;
the period during which the land will be entered (the entry period );
the activities proposed to be carried out on the land under section 363E (1) ;
when and where the activities are proposed to be carried out.
s 363F ins 2010 No. 31 s 433
- (a) the area of the overlapping mineral (f) land proposed to be entered;
- (b) the period during which the land will be entered (the entry period );
- (c) the activities proposed to be carried out on the land under section 363E (1) ;
- (d) when and where the activities are proposed to be carried out.