NSWIn ForceAct
Mining Act 1992
211Rights of way
Start here
Get a plain-English read of 211
Turn the raw legal text into a practical explanation grounded in Mining Act 1992.
#### 211 Rights of way
211 Rights of way
> > (1) The holder of a mineral claim is entitled to a right of way (to be indicated or described in the manner prescribed by the regulations) between the claim area and a public road.
>
> > (2) The route of a right of way—
> >
> > > (a) should, wherever practicable, follow the route of existing roads or tracks (particularly, in the case of land in the Western Division, those the subject of special easements under Part 6 of Schedule 3 to the [Crown Land Management Act 2016](/view/html/inforce/current/act-2016-058)), and
> >
> > > (b) must accord with the provisions of any registered access management plan applying to the land.
>
> > (3) The holder of the mineral claim—
> >
> > > (a) must ensure that substantial gates or grids (or, if the landholder of the land so requires, gates and grids), that comply with subsection (4), are placed wherever fences are intersected by the right of way, or
> >
> > > (b) if those fences are rabbit-proof, marsupial-proof or dog-proof fences, must ensure that rabbit-proof, marsupial-proof or dog-proof gates are placed at all such intersections.
>
> > (4) Any such gate or grid must be of a design and construction that is adequate to prevent stock from straying.
>
> > (5) The costs of installing and maintaining any gates or grids required by this section are to be borne by the holder of the mineral claim.
>
> > (6) Subject to any determination by the Land and Environment Court, a right of way is subject to such conditions as to its exercise, and to such exceptions as to the land over which it may be exercised—
> >
> > > (a) as may be prescribed by the regulations, or
> >
> > > (b) as may be specified in any registered access management plan applying to the land.
>
> > (7) If a dispute arises as to the exercise of a right of way, any party to the dispute may apply to the Land and Environment Court for a determination of the matter.
>
> > (8) In the case of land within a mineral claims district, the conditions imposed by the Land and Environment Court under subsection (7) must not be inconsistent with the conditions specified in any registered access management plan applying to the land.
>
> > (9) (Repealed)
>
> Maximum penalty (subsection (3)): 50 penalty units.
>
> **s 211:** Am 1999 No 43, Sch 1 \[47\]. Subst 2004 No 75, Sch 1 \[18\]. Am 2008 No 19, Sch 1 \[173\]–\[175\]; 2008 No 107, Sch 19 \[23\]; 2017 No 17, Sch 2.12 \[6\].