QLDIn ForceAct
Geothermal Energy Act 2010
sec.167Proposed GHG, mining or petroleum lease declared a coordinated project
Start here
Get a plain-English read of sec.167
Turn the raw legal text into a practical explanation grounded in Geothermal Energy Act 2010.
### sec.167 Proposed GHG, mining or petroleum lease declared a coordinated project
This section applies for a geothermal lease application if—
before the making of the application, a coordinated project was declared; and
the project is or includes a proposed GHG lease, mining lease or petroleum lease (the other proposed lease ) for land the subject of the application.
The application must not be decided until—
if no application is made for the other proposed lease within 1 year after the making of the declaration—the end of that year; or
if an application is made for the other proposed lease within that year—that application is decided.
s 167 amd 2012 No. 43 s 325 sch 2
(sec.167-ssec.1) This section applies for a geothermal lease application if— before the making of the application, a coordinated project was declared; and the project is or includes a proposed GHG lease, mining lease or petroleum lease (the other proposed lease ) for land the subject of the application.
(sec.167-ssec.2) The application must not be decided until— if no application is made for the other proposed lease within 1 year after the making of the declaration—the end of that year; or if an application is made for the other proposed lease within that year—that application is decided.
- (a) before the making of the application, a coordinated project was declared; and
- (b) the project is or includes a proposed GHG lease, mining lease or petroleum lease (the other proposed lease ) for land the subject of the application.
- (a) if no application is made for the other proposed lease within 1 year after the making of the declaration—the end of that year; or
- (b) if an application is made for the other proposed lease within that year—that application is decided.