QLDIn ForceAct
Geothermal Energy Act 2010
sec.112Relinquishment must be by blocks or sub-blocks
Start here
Get a plain-English read of sec.112
Turn the raw legal text into a practical explanation grounded in Geothermal Energy Act 2010.
### sec.112 Relinquishment must be by blocks or sub-blocks
A relinquishment under the relinquishment condition can only be by blocks or sub-blocks.
However, if a block or sub-block contains an area that, under section 113 , can not be counted as a relinquishment, subsection (1) is complied with if all of the rest of the land within the block or sub-block is relinquished.
(sec.112-ssec.1) A relinquishment under the relinquishment condition can only be by blocks or sub-blocks.
(sec.112-ssec.2) However, if a block or sub-block contains an area that, under section 113 , can not be counted as a relinquishment, subsection (1) is complied with if all of the rest of the land within the block or sub-block is relinquished.