### sec.328 Qualifying generators connected, or about to be connected, to supply network
This section applies if—
before 8 June 2011, a small customer’s qualifying generator was connected to a distribution entity’s supply network; or
a small customer had applied to a distribution entity before 8 June 2011 to have the customer’s qualifying generator connected to the distribution entity’s supply network, but the generator was connected to the network after 8 June 2011.
Section 44A and schedule 5, definition small photovoltaic generator , as in force immediately before the commencement, continue to apply to the qualifying generator after 8 June 2011.
To remove any doubt, it is declared that subsection (2) applies for any small customer from time to time for the premises at which the qualifying generator is installed.
This section is subject to section 335.
s 328 ins 2011 No. 29 s 12 (retro)
amd 2012 No. 29 s 6
(sec.328-ssec.1) This section applies if— before 8 June 2011, a small customer’s qualifying generator was connected to a distribution entity’s supply network; or a small customer had applied to a distribution entity before 8 June 2011 to have the customer’s qualifying generator connected to the distribution entity’s supply network, but the generator was connected to the network after 8 June 2011.
(sec.328-ssec.2) Section 44A and schedule 5, definition small photovoltaic generator , as in force immediately before the commencement, continue to apply to the qualifying generator after 8 June 2011.
(sec.328-ssec.3) To remove any doubt, it is declared that subsection (2) applies for any small customer from time to time for the premises at which the qualifying generator is installed.
(sec.328-ssec.4) This section is subject to section 335.