sec.20PExemption for connection of generating plant not supplying electricity to transmission grid or supply network
Start here
Get a plain-English read of sec.20P
Turn the raw legal text into a practical explanation grounded in Electricity Act 1994.
### sec.20P Exemption for connection of generating plant not supplying electricity to transmission grid or supply network
Section 87 does not apply to the connection of a stand-by generating plant to a transmission grid or supply network if—
the connection is only when the operation of the plant is tested; and
electricity is not supplied by the plant into the grid or network.
s 20P ins 2003 No. 28 s 4
- (a) the connection is only when the operation of the plant is tested; and
- (b) electricity is not supplied by the plant into the grid or network.