QLDIn ForceAct
Electricity Act 1994
sec.120ETabling of code
Start here
Get a plain-English read of sec.120E
Turn the raw legal text into a practical explanation grounded in Electricity Act 1994.
### sec.120E Tabling of code
Within 14 days after an initial distribution network code takes effect, the Minister must table a copy in the Legislative Assembly.
The copy is tabled for information only.
A failure to table the copy does not affect the code’s ongoing effect.
s 120E ins 1997 No. 77 s 39
sub 2006 No. 60 s 30
amd 2014 No. 48 s 183 sch 1
(sec.120E-ssec.1) Within 14 days after an initial distribution network code takes effect, the Minister must table a copy in the Legislative Assembly.
(sec.120E-ssec.2) The copy is tabled for information only.
(sec.120E-ssec.3) A failure to table the copy does not affect the code’s ongoing effect.