### sec.203 Application of ss 123 and 124 to particular works in a watercourse
This section applies to work if—
a development approval for the work was given under the Integrated Planning Act 1997 as in force on or after 17 October 2004 or the Sustainable Planning Act 2009 as in force before 3 August 2012; and
the work is or was operational work in tidal water that consists or consisted of constructing or installing works in a watercourse; and
the work is not, or was not, any of the following—
erecting a sign or other structure, including, for example, a navigational aid or sign for maritime navigation, under a direction made under another Act;
building an open drain that is less than 1m deep and has a cross sectional area less than 2.5m 2 ;
constructing an artificial waterway;
reclaiming land under tidal water.
Sections 123 and 124 apply to the work, and always did apply to the work, as if the work were operational work that is tidal works.
s 203 ins 2014 No. 33 s 99
(sec.203-ssec.1) This section applies to work if— a development approval for the work was given under the Integrated Planning Act 1997 as in force on or after 17 October 2004 or the Sustainable Planning Act 2009 as in force before 3 August 2012; and the work is or was operational work in tidal water that consists or consisted of constructing or installing works in a watercourse; and the work is not, or was not, any of the following— erecting a sign or other structure, including, for example, a navigational aid or sign for maritime navigation, under a direction made under another Act; building an open drain that is less than 1m deep and has a cross sectional area less than 2.5m 2 ; constructing an artificial waterway; reclaiming land under tidal water.
(sec.203-ssec.2) Sections 123 and 124 apply to the work, and always did apply to the work, as if the work were operational work that is tidal works.
- (a) a development approval for the work was given under the Integrated Planning Act 1997 as in force on or after 17 October 2004 or the Sustainable Planning Act 2009 as in force before 3 August 2012; and
- (b) the work is or was operational work in tidal water that consists or consisted of constructing or installing works in a watercourse; and
- (c) the work is not, or was not, any of the following— (i) erecting a sign or other structure, including, for example, a navigational aid or sign for maritime navigation, under a direction made under another Act; (ii) building an open drain that is less than 1m deep and has a cross sectional area less than 2.5m 2 ; (iii) constructing an artificial waterway; (iv) reclaiming land under tidal water.
- (i) erecting a sign or other structure, including, for example, a navigational aid or sign for maritime navigation, under a direction made under another Act;
- (ii) building an open drain that is less than 1m deep and has a cross sectional area less than 2.5m 2 ;
- (iii) constructing an artificial waterway;
- (iv) reclaiming land under tidal water.
- (i) erecting a sign or other structure, including, for example, a navigational aid or sign for maritime navigation, under a direction made under another Act;
- (ii) building an open drain that is less than 1m deep and has a cross sectional area less than 2.5m 2 ;
- (iii) constructing an artificial waterway;
- (iv) reclaiming land under tidal water.