4 A chronology of the history of DA82/149 and its implementation follows:
(i) On or about 15 April 1982, a firm of consultant surveyors, Steel & Associates Pty Ltd, applied for development consent on behalf of the First Respondent.
(ii) On 22 April 1982, the Council granted development consent for the subdivision of the First Respondent's property DA82/149, described as part portions 46, 61 and 62 of the Parish of Ballina.
(iii) The consent permitted, subject to conditions, the creation of 57 single dwelling, two farmlet, four rural residential and two medium density lots.
(iv) Of the various conditions of consent applicable to the proposed development, one particular condition, Condition 6, provided that "the submitted plan shall be amended to provide public road access over Lot 65".
(v) The "submitted plan" referred to in Condition 6 to the consent was a contour sketch plan prepared by Steel & Associates Pty Ltd and dated 15 April 1982. This plan set out a series of numbered lots in the proposed subdivision, including an area called Lot 65. It showed a road ending in a cul de sac in the southern portion of the land delineated at Lot 65.
(vi) Lot 65 was adjacent to Lots 6 and 7 DP 552587. Lot 6 is now owned by the Applicants (now Lot 9 in DP719601).
(vii) The subdivision was ultimately carried out in three separate stages with the concurrence of Council and the registration of three separate plans of subdivision.
(viii) On or about 17 November 1983, a plan of subdivision for 20 residential lots was approved by Council in accordance with DA 82/149 and registered as DP700547 on 1 February 1984 (the first stage).
(ix) On or about 13 August 1993, a second plan of subdivision in respect of 25 residential lots and three public reserves was approved by Council and registered as DP833002 on 16 September 1996 (the second stage).
(x) On or about 15 November 1996, the third stage of subdivision was approved by Council for the creation of 11 residential lots and registered as DP864764 on 19 December 1996 (the third stage).
5 I was told that all three stages of the approved subdivisions have been built. In the third stage, an extension of Kellie Ann Crescent, a public road, onto the southern portion of what was Lot 65 ending in a cul de sac was approved by the Council in 1996. The balance of the land that was described as Lot 65 in the submitted plan dated 15 April 1982 became Lot 61 in DP833002 and remains as a large parcel of undeveloped land extending to the northern boundary of the First Respondent's land (abutting an area on the north-eastern corner of the First Respondent's land to be used as a reserve) and the eastern boundary being the Applicants' land to the south. The location of the public road known as Kellie Ann Crescent, which ends in a cul de sac close to the boundary of the Applicants' land, is shown in the subdivision plans for the third stage. As can be seen in the aerial photograph at page 6 of Volume 1, the public road known as Kellie Ann Crescent ends in a cul de sac close to the western boundary of the Applicants' land. The Applicants are seeking orders which will result in that public road being continued up to their boundary and be able to be used as a public road.
6 The conditions of consent DA 82/149 provided:
(General) conditions:
1. Final Plans - the submission of final plans and applicable processing fee
Conditions of development consent
1. Development of the site being carried out generally in accordance with the plan prepared by Steel & Associates Pty Ltd and submitted with the development application as amended, by the following conditions.
…
3. The following development standards applying to the site. (A reference in this condition to 'the report' shall be a reference to the report title 'Lennox Head-Ballina: Coastal Detailed Strategy, Precinct 3' prepared by Ballina Shire Council, August 1979).
…
Electrical Servicing - As per Section 6.2 of the report.
…
Building conditions - A schedule of covenants shall be prepared by the applicant and approved by Council's Engineer/Planner generally in accordance with Section 6.2 of the report.
…
6. The submitted plan shall be amended to provide public road access over lot 65.
7 A copy of the Council's file produced in response to a Notice to Produce was provided in Tab 3 of Volume 2 but was either successfully objected to or not tendered apart from four pages. I ruled that four pages in Tab 3 of Volume 2 could be tendered, being Precinct 3 Detailed Development Plan Map 8, and the gazettal of the Ballina Local Environmental Plan No 1 on 10 October 1980. The Local Environmental Plan amended the Interim Development Order No. 1 - Shire of Tintinbar by inserting cl 35(2)(b) which refers to the plan titled "Precinct 3 detailed Development Plan Map 8". Map 8 is a general, not to scale, schematic plan of possible subdivision. Clause 35(2) states:
Subject to subclause (3) nothing in this order shall prevent the residential development of land to which this clause applies if that development is carried out -