[2011] NSWLEC 1384
Land and Environment Court (NSW)
2011-12-20
Mr J
Original judgment source is linked above.
Mr J Robson SC Respondent) Solicitors Pikes Lawyers (Applicant)
Wilshire Webb Staunton Beattie (Respondent) File Number(s): 10515 of 2011
Judgment 1COMMISSIONERS: This is an appeal against the refusal by Sydney East Region Planning Panel of Development Application 182/2011 for the demolition of all existing structures and construction of a new part 5 and part 6 storey level mixed use development comprising three buildings referred to as Block A, Block B and Block C to create 73 apartments, 3 retail units, basement car parking for 94 vehicles, landscaping and associated works. 2The amended Statement of Facts and Contentions raises a number of concerns that can be grouped into the following main areas.
The site 3The site comprises the following lots:
Relevant planning controls 6The site is zoned Local Business 3(b) under Randwick Local Environmental Plan 1998 (LEP 1998 ) . Multi-unit housing, retail and commercial uses are permissible with consent in this zone. Clause 9 provides that the Court may only grant consent if it has, "considered the extent to which the proposed development is consistent with the general aims of this plan and the specific objectives of the zone...". The aims of the plan are found in cl 2 and the zone objectives are: (a) to provide opportunities for local retail and business development in the City of Randwick, and (b) to provide opportunities for associated development such as car parking and service industries, and (c) to provide opportunities for residential accommodation in local business centres where it does not interfere with the primary business function of the zone, and (d) to minimise the impact of development on adjoining and nearby residential zones, and (e) to encourage housing affordability, and (f) to encourage the provision and use of public transport. 7The site falls within the area designated by cl 42C(1) as the Kensington Town Centre. Clause 42C(2) provides that consent must not be granted unless the Court is satisfied that the proposed development is consistent with the objectives for the Kensington Town Centre identified in the subclause. Clause 42C(4) refers to the Kensington Town Centre Development Control Plan 2002 (the DCP) adopted by the Council on 26 November 2002 and states that the requirements in the subclause apply "to the development of the land within the Kensington Town Centre as if they were incorporated into this plan." The relevant controls are maximum number of storeys (cl 42C(4)(a)) and maximum height of development (cl 42C(4)(b)). 8The relevant parts of the DCP are, Pt 2-Vision Statement, Pt 3.6-Parks and Public Open Space, cl 4.2.1-New Built Form, cl 4.2.3-Articulation Zone, cl 4.2.4-Building Heights, cl 4.2.5-Building Zone, and cl 4.2.10-Setbacks. 9The DCP provides specific requirements for specific areas within the Kensington Town Centre. The site falls within Block 02 and the requirements are found in cl 4.3.2. These requirements include a diagram indicating the layout of buildings and their respective heights, and specific 10State Environmental Planning Policy No. 65 - Design Quality of Residential Flat Development (SEPP 65) applies to the proposed development. Clause 30 requires consideration to be given to the design quality principles in Part 2 (cl 30(2)(b)) and the publication Residential Flat Design Code (RFDC) (cl 30(2)(c)).
Height and storeys - the SEPP 1 objection The evidence 11It was agreed by Mr Betros, the applicant's town planner and Mr Stuart Harding, the council's town planner that Building B (that adjoins the Park) does not satisfy the maximum building height and number of storeys development standards referred to in cl 42C(a) and (b) respectively of LEP 1998. The standards require a 4-storey building and a height of 13.8 m whereas Building B is proposed to be 5- storeys with a height of 17.1 m. 12Mr Betros provided an objection under SEPP 1 to show why strict compliance with the development standards was unreasonable or unnecessary in the circumstances of this case. The SEPP 1 objection addresses the non-compliance with the development standard through the decision of Preston CJ in Wehbe v Pittwater Council [2007] NSWLEC 827 and particularly where it can be shown that the objectives of the development standard are achieved notwithstanding non-compliance with the standard (Test 1). 13The maximum building height and storey standards are included in cl 4.2.4 of the DCP. The objectives identified in this clause are: + To ensure appropriate scale relationship between new development and street width, local context, adjacent buildings and Contributory Buildings. + To achieve well-proportioned buildings. + To maintain public view corridors from the east side of Randwick Racecourse over the Town Centre to Monastery of the Missionary of the Sacred Heart. + To ensure appropriate management of overshadowing, access to sunlight and privacy. + To ensure appropriate floor to ceiling height within buildings. + To achieve a visual transition between heights of buildings "behind" the main street. 14Mr Betros states that the proposed height and number of storeys of Building B satisfy the objectives of the standard because:
Non-compliance with the DCP requirements The assessment framework 29The role of a development control plan is set out in some detail by McClellan CJ in Stockland Developments Pty Limited v Manly Council [2004] NSWLEC 472 (at pars 83-92) and includes review of recent judgments on this issue. Relevantly (at par 87), His Honour states, 87. A development control plan is a detailed planning document which reflects a council's expectation for parts of its area, which may be a larger area or confined to an individual site. The provision of a development control plan must be consistent with the provisions of any relevant local environmental planning instrument. However a development control plan may operate to confine the intensity of development otherwise permitted by a local environmental plan. 30His Honour further states at par 87, the principles relevant to consideration of a development control plan. These include the matters raised in the proceeding paragraphs and a number of specific matters that determine weight to be given to the development control plan. These are the level of consultation with interested persons, including the affected community, any inconsistency in which the development control plan has been applied by a council, the consistency with other policy outcomes adopted at a state, regional or local level and the consistency of decision making. 31The role of a development control plan is further addressed in Zhang v Canterbury City Council [2001] 115 LGERA 373 where Spigelman CJ (at par 75) raises three important propositions. First and although the Court has a wide of discretion, the discretion is not unfettered. Secondly, the provisions of a development control plan are to be considered as a fundamental element in, or a focal point to the decision making process particularly if there are no issues relating to compliance with the local environmental plan. Thirdly, a provision of a development control plan directly pertinent to the application is entitled to significant weight in the decision making process but it is not in itself determinative. 32If the proposed development is considered in the light of Stockland, we have little trouble in concluding that significant weight should be given to the DCP. Similarly there is no reason why the DCP should not be, "a fundamental element in or a focal point to the decision making process" as outlined in Zhang . In our assessment, the DCP raises two fundamental problems with the development application both of which, in our view, would warrant the refusal of the application. Length and location of proposed Building B 33The first relates to the length and location of proposed Building B. The DCP identifies a smaller building (TO3) and that is generally located along the common boundary with the Park and the site. The proposal provides a considerably longer building form than T03 that is far more imposing when viewed from the Park. Proposed Building B also superficially attempts to create a gap with Building C, although in our opinion, the attempt is largely unsuccessful as the gap is narrow and Building B and C are attached by a walkway that runs along the rear of both buildings. If a gap between Building B and Building C was similar to that shown in the DCP then some relief from the bulk of the building form would be obtained from the Park and existing residential flat building in Ascot Street. Upper level setbacks of Building A 34The second matter relates to the upper level setbacks of Building A. Mr Dixon, the applicant's urban designer and architect, explained that the architectural treatment of the upper two levels of the building through clear balustrades compared to solid balustrades for the lower levels and other architectural measures, achieve a similar result to the 4 m setbacks for the fourth and fifth levels anticipated by the DCP. We disagree. Given the residential character of the development on the opposite side of Goodwood Street and importantly, the existing residential flat building adjoining in Goodwood Street, we would expect that a more substantial setback on the upper two levels should be provided. The question of whether a full 4 m setback should be provided would depend on any design, including the articulation proposed along at this particular part of the building. 35In our view, the development is inconsistent with zone objective (b).
Other matters 36As we have found at the location, the design of Buildings A and B and the separation of the three buildings is unsatisfactory, it is unnecessary to address the remaining issues raised by the council experts. However we make the following general comments:
Orders 37The orders of the Court are:
G T Brown Acting Senior Commissioner
M Ritchie Acting Commissioner DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated. Decision last updated: 19 January 2012
Fox Johnson
Randwick City Council