Non-compliance with the DCP requirements
The assessment framework
29The role of a development control plan is set out in some detail by McClellan CJ in Stockland Developments Pty Limited v Manly Council [2004] NSWLEC 472 (at pars 83-92) and includes review of recent judgments on this issue. Relevantly (at par 87), His Honour states,
87. A development control plan is a detailed planning document which reflects a council's expectation for parts of its area, which may be a larger area or confined to an individual site. The provision of a development control plan must be consistent with the provisions of any relevant local environmental planning instrument. However a development control plan may operate to confine the intensity of development otherwise permitted by a local environmental plan.
30His Honour further states at par 87, the principles relevant to consideration of a development control plan. These include the matters raised in the proceeding paragraphs and a number of specific matters that determine weight to be given to the development control plan. These are the level of consultation with interested persons, including the affected community, any inconsistency in which the development control plan has been applied by a council, the consistency with other policy outcomes adopted at a state, regional or local level and the consistency of decision making.
31The role of a development control plan is further addressed in Zhang v Canterbury City Council [2001] 115 LGERA 373 where Spigelman CJ (at par 75) raises three important propositions. First and although the Court has a wide of discretion, the discretion is not unfettered. Secondly, the provisions of a development control plan are to be considered as a fundamental element in, or a focal point to the decision making process particularly if there are no issues relating to compliance with the local environmental plan. Thirdly, a provision of a development control plan directly pertinent to the application is entitled to significant weight in the decision making process but it is not in itself determinative.
32If the proposed development is considered in the light of Stockland, we have little trouble in concluding that significant weight should be given to the DCP. Similarly there is no reason why the DCP should not be, "a fundamental element in or a focal point to the decision making process" as outlined in Zhang . In our assessment, the DCP raises two fundamental problems with the development application both of which, in our view, would warrant the refusal of the application.
Length and location of proposed Building B
33The first relates to the length and location of proposed Building B. The DCP identifies a smaller building (TO3) and that is generally located along the common boundary with the Park and the site. The proposal provides a considerably longer building form than T03 that is far more imposing when viewed from the Park. Proposed Building B also superficially attempts to create a gap with Building C, although in our opinion, the attempt is largely unsuccessful as the gap is narrow and Building B and C are attached by a walkway that runs along the rear of both buildings. If a gap between Building B and Building C was similar to that shown in the DCP then some relief from the bulk of the building form would be obtained from the Park and existing residential flat building in Ascot Street.
Upper level setbacks of Building A
34The second matter relates to the upper level setbacks of Building A. Mr Dixon, the applicant's urban designer and architect, explained that the architectural treatment of the upper two levels of the building through clear balustrades compared to solid balustrades for the lower levels and other architectural measures, achieve a similar result to the 4 m setbacks for the fourth and fifth levels anticipated by the DCP. We disagree. Given the residential character of the development on the opposite side of Goodwood Street and importantly, the existing residential flat building adjoining in Goodwood Street, we would expect that a more substantial setback on the upper two levels should be provided. The question of whether a full 4 m setback should be provided would depend on any design, including the articulation proposed along at this particular part of the building.
35In our view, the development is inconsistent with zone objective (b).