The subdivision
8. Prior to the subdivision and sale of the land, a number of studies had been commissioned by the ACT Government. These included a Works and Commercial Services Site Investigation Report dated July 1996 by Bill Guy and Partners, which among other things stated:
4.3 STORMWATER
There is a 525mm dia stormwater tie at the east boundary of the site. All piped stormwater from the school buildings and ground drains to this point. The stormwater tie coincides with the overland flow discharge point from the site.
Redevelopment of the site will increase the extent of impervious areas hence the stormwater runoff will increase. Current DUS stormwater unit policy is for onsite stormwater detention systems (OSD) to be provided however this would need to be discussed with the stormwater unit once the extent and type of development as determined.
5.0 OVERLAND FLOW
There is an open unlined grass stormwater channel through the site to the south of the school buildings. The channel collects stormwater from the block and from our site inspection it appears that no contribution is made from outside the block, however, this would need to be verified by a more detailed review of stormwater in the area. ...... The channel discharges into open space to the east of the tennis courts.
...
Development constraints are difficult to identify due to the preliminary nature of possible redevelopment options, however, the following constraints exist and would require relocation/upgrading of services/easements created
* 1050mm dia stormwater main along Lhotsky Street frontage
* sewer from school
* stormwater from school
* gas and telephone to school
* open stormwater channel to south of school
* significant stands or individual trees worthy of retention.
9. A Boundary Assessment Report to consider the boundary between the proposed new blocks was then commissioned by the ACT Government from Purdon Associates Pty Ltd. It is dated March 1997. It reads in part:
4. REVIEW OF EXISTING INVESTIGATIONS
4.1 Review of Works and Commercial Services investigation
* ......the stormwater easement could be retained and incorporated into a landscaped buffer zone and pedestrian link across Lhotsky Street
* stormwater pipes from the school building cross the south eastern portion of the site. These services may need to be relocated and/or easements provided
* an overland flow stormwater channel crosses the south eastern portion of the site. ...... Although piping of some of this flow is possible, an overland flow path would still be required for extreme storm events. As a result, the existing or a modified version of this overland flow path will need to be incorporated in any development proposal. ...... Onsite stormwater detention systems may be required subject to negotiations with the stormwater unit of DUS.
5.2.2 Constraints on Residential Development
* Some minor realignment of this flow path may be necessary and will require future design and investigation. It is anticipated that this flow path will be located in an easement across the residential site and be associated with a pedestrian link;
* Relocation of stormwater pipes associated with the former high school building into its proposed curtilage.
10. In April 1997 Bill Guy and Partners was again commissioned to carry out a further Site Investigation Report into the land. It reads in part:
6.1 DUS - Stormwater
The current policy in relation to stormwater for redevelopment of the existing site is detailed in the publication "Interim Stormwater Management Guidelines for Redevelopment" Stormwater Section, Roads and Traffic Branch, ACT City Services, Edition 1 September 1994.
Mr S Brenan of DUS - Stormwater has confirmed the above would be applicable to any redevelopment on the site whether it be the residential area or expansion of the existing buildings.
It should also be noted that the site contains an overland flow path for the 100 year ARI. This flow path would need to be maintained and incorporated into any redevelopment.
With the creation of two or more blocks of land, rationalisation of services will be required to provide one stormwater tie to each block. Easements will be required over any services passing through new blocks.
11. The tender document for the sale of the land issued in May 1997 by Total Care Industries Limited, an agency of the ACT Government, identified the land for sale as two subdivided blocks. The document included the following clause:
7. EXISTING BUILDINGS, IMPROVEMENTS AND SITE CONDITIONS
Block 1 Section 94 Charnwood is fully serviced by water, sewer, stormwater, electricity, gas and telecommunications. The Associated Works required to separately service `Block A' and `Block B' are to be carried out by the successful Lessees in accordance with Prescribed Conditions for Associated Works to be determined when the boundary is finalized.
(`Block A' became Block 3 and `Block B' became Block 2.)
12. In summary, several reports prior to subdivision showed the need for provide separate stormwater services for the separate blocks prior to subdivision. This work was, according to the tender document, to be described as Prescribed Conditions for Associated Works and to be undertaken by the successful purchaser upon sale of the land. Yet it appears that no Prescribed Conditions for Associated Works were ever imposed, nor were any lease conditions dealing with stormwater and other identified services attached to the leases when they were issued to Pinto. Both overland and piped stormwater continues to flow from Block 3 to Block 2 as they did prior to the subdivision.