{"id":"qld:sl-2006-0321","name":"Water Plan (Gold Coast) 2006","slug":"water-plan-gold-coast-2006","collection":"regulation","jurisdiction":"qld","status":"in_force","isInForce":true,"actNumber":"321 of 2006","makingDate":null,"administeringDepartment":null,"currentVersion":{"id":175856,"registerId":"qld-qld:sl-2006-0321-current","compilationNumber":null,"startDate":"2026-04-05","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"pt.1","sectionType":"part","heading":"Preliminary","content":"# Preliminary","sortOrder":0},{"sectionNumber":"sec.1","sectionType":"section","heading":"Short title","content":"### sec.1 Short title\n\nThis water plan may be cited as the Water Plan (Gold Coast) 2006 .\ns&#160;1 sub 2014 Act&#160;No.&#160;64 s&#160;255 sch&#160;2","sortOrder":1},{"sectionNumber":"sec.2","sectionType":"section","heading":"Purposes of plan","content":"### sec.2 Purposes of plan\n\nThe following are the purposes of this plan—\nto define the availability of water in the plan area;\nto provide a framework for sustainably managing water and the taking of water;\nto identify priorities and mechanisms for dealing with future water requirements;\nto provide a framework for establishing water allocations;\nto provide a framework for reversing, where practicable, degradation that has occurred in natural ecosystems.\n- (a) to define the availability of water in the plan area;\n- (b) to provide a framework for sustainably managing water and the taking of water;\n- (c) to identify priorities and mechanisms for dealing with future water requirements;\n- (d) to provide a framework for establishing water allocations;\n- (e) to provide a framework for reversing, where practicable, degradation that has occurred in natural ecosystems.","sortOrder":2},{"sectionNumber":"sec.3","sectionType":"section","heading":"Definitions","content":"### sec.3 Definitions\n\nThe dictionary in schedule&#160;11 defines particular words used in this plan.","sortOrder":3},{"sectionNumber":"pt.2","sectionType":"part","heading":"Plan area and water to which plan applies","content":"# Plan area and water to which plan applies","sortOrder":4},{"sectionNumber":"sec.4","sectionType":"section","heading":"Plan area","content":"### sec.4 Plan area\n\nThis plan applies to the area shown as the plan area on the map in schedule&#160;1 .","sortOrder":5},{"sectionNumber":"sec.5","sectionType":"section","heading":"Subcatchment areas","content":"### sec.5 Subcatchment areas\n\nEach part of the plan area that is within a subcatchment area shown on the map in schedule&#160;2 , and named in schedule&#160;3 , is a subcatchment area for this plan.","sortOrder":6},{"sectionNumber":"sec.6","sectionType":"section","heading":"Information about areas","content":"### sec.6 Information about areas\n\nThe exact location of the plan area and subcatchment area boundaries is held in digital electronic form by the department.\nThe information held in digital electronic form can be reduced or enlarged to show the details of the boundaries.\n(sec.6-ssec.1) The exact location of the plan area and subcatchment area boundaries is held in digital electronic form by the department.\n(sec.6-ssec.2) The information held in digital electronic form can be reduced or enlarged to show the details of the boundaries.","sortOrder":7},{"sectionNumber":"sec.7","sectionType":"section","heading":"Nodes","content":"### sec.7 Nodes\n\nA node mentioned in this plan is a place—\non a watercourse in the plan area; and\nfor which environmental flow objectives are set for performance indicators.\nThe location of each node is shown on the map in schedule&#160;1 and described in schedule&#160;4 .\nEach node is identified on the map by a letter of the alphabet.\n(sec.7-ssec.1) A node mentioned in this plan is a place— on a watercourse in the plan area; and for which environmental flow objectives are set for performance indicators.\n(sec.7-ssec.2) The location of each node is shown on the map in schedule&#160;1 and described in schedule&#160;4 .\n(sec.7-ssec.3) Each node is identified on the map by a letter of the alphabet.\n- (a) on a watercourse in the plan area; and\n- (b) for which environmental flow objectives are set for performance indicators.","sortOrder":8},{"sectionNumber":"sec.8","sectionType":"section","heading":"Water to which plan applies","content":"### sec.8 Water to which plan applies\n\nThis plan applies to water in a watercourse, lake or spring in the plan area.\ns&#160;8 sub 2016 SL&#160;No.&#160;216 s&#160;146 sch&#160;20","sortOrder":9},{"sectionNumber":"pt.3","sectionType":"part","heading":"Outcomes for sustainable management of water","content":"# Outcomes for sustainable management of water","sortOrder":10},{"sectionNumber":"sec.9","sectionType":"section","heading":"Outcomes for water in plan area","content":"### sec.9 Outcomes for water in plan area\n\nWater is to be allocated and sustainably managed in a way that—\nrecognises the natural state of watercourses, lakes and springs has changed because of water infrastructure, flow supplementation and the taking of water; and\nseeks to achieve a balance in the following outcomes—\nthe general outcomes mentioned in section&#160;10 ;\nthe ecological outcomes mentioned in section&#160;11 .\n- (a) recognises the natural state of watercourses, lakes and springs has changed because of water infrastructure, flow supplementation and the taking of water; and\n- (b) seeks to achieve a balance in the following outcomes— (i) the general outcomes mentioned in section&#160;10 ; (ii) the ecological outcomes mentioned in section&#160;11 .\n- (i) the general outcomes mentioned in section&#160;10 ;\n- (ii) the ecological outcomes mentioned in section&#160;11 .\n- (i) the general outcomes mentioned in section&#160;10 ;\n- (ii) the ecological outcomes mentioned in section&#160;11 .","sortOrder":11},{"sectionNumber":"sec.10","sectionType":"section","heading":"General outcomes","content":"### sec.10 General outcomes\n\nEach of the following is a general outcome for water in the plan area—\nto provide for future water requirements, including the opportunity for additional water to be taken from the plan area;\nto provide for the continued use of all existing water entitlements and other authorisations;\nto protect the probability of being able to obtain water under a water allocation;\nto encourage the efficient use of water;\nto protect essential water supplies when water availability is low;\nto support natural ecosystems by minimising changes to natural flow regimes;\nto protect, or minimise the impact of the taking of water on, ecological assets and ecosystem structures and processes;\nto allow water-related cultural use of the plan area by the traditional owners of the area;\nto provide consistency between this plan and the SEQ regional plan.\n- (a) to provide for future water requirements, including the opportunity for additional water to be taken from the plan area;\n- (b) to provide for the continued use of all existing water entitlements and other authorisations;\n- (c) to protect the probability of being able to obtain water under a water allocation;\n- (d) to encourage the efficient use of water;\n- (e) to protect essential water supplies when water availability is low;\n- (f) to support natural ecosystems by minimising changes to natural flow regimes;\n- (g) to protect, or minimise the impact of the taking of water on, ecological assets and ecosystem structures and processes;\n- (h) to allow water-related cultural use of the plan area by the traditional owners of the area;\n- (i) to provide consistency between this plan and the SEQ regional plan.","sortOrder":12},{"sectionNumber":"sec.11","sectionType":"section","heading":"Ecological outcomes","content":"### sec.11 Ecological outcomes\n\nParticular ecological outcomes for water in the part of the plan area stated for the outcome are as follows—\nfor Coomera River within the area known as Canungra Land Warfare Centre, including, in particular, Back Creek, and other waters of high ecological value under the Environmental Protection (Water and Wetland Biodiversity) Policy 2019 , including, in particular, Tallebudgerra Creek and Currumbin Creek—to minimise changes to the flow regimes of the waters;\nfor Nerang River upstream of the Hinze Dam and Little Nerang Creek upstream of the Little Nerang Dam—\nto minimise changes to river-forming processes; and\nto minimise changes to the flow regime;\nfor Coomera River estuary—\nto minimise changes, as far as practicable, to freshwater flows into the Coomera River estuary; and\nto minimise changes to the freshwater inflows to Coombabah Lake.\nAlso, an ecological outcome for water in the plan area is to minimise changes, as far as practicable, to the volume and seasonality of freshwater flows into Moreton Bay and the Broadwater.\ns&#160;11 amd 2019 SL&#160;No.&#160;155 s&#160;232\n(sec.11-ssec.1) Particular ecological outcomes for water in the part of the plan area stated for the outcome are as follows— for Coomera River within the area known as Canungra Land Warfare Centre, including, in particular, Back Creek, and other waters of high ecological value under the Environmental Protection (Water and Wetland Biodiversity) Policy 2019 , including, in particular, Tallebudgerra Creek and Currumbin Creek—to minimise changes to the flow regimes of the waters; for Nerang River upstream of the Hinze Dam and Little Nerang Creek upstream of the Little Nerang Dam— to minimise changes to river-forming processes; and to minimise changes to the flow regime; for Coomera River estuary— to minimise changes, as far as practicable, to freshwater flows into the Coomera River estuary; and to minimise changes to the freshwater inflows to Coombabah Lake.\n(sec.11-ssec.2) Also, an ecological outcome for water in the plan area is to minimise changes, as far as practicable, to the volume and seasonality of freshwater flows into Moreton Bay and the Broadwater.\n- (a) for Coomera River within the area known as Canungra Land Warfare Centre, including, in particular, Back Creek, and other waters of high ecological value under the Environmental Protection (Water and Wetland Biodiversity) Policy 2019 , including, in particular, Tallebudgerra Creek and Currumbin Creek—to minimise changes to the flow regimes of the waters;\n- (b) for Nerang River upstream of the Hinze Dam and Little Nerang Creek upstream of the Little Nerang Dam— (i) to minimise changes to river-forming processes; and (ii) to minimise changes to the flow regime;\n- (i) to minimise changes to river-forming processes; and\n- (ii) to minimise changes to the flow regime;\n- (c) for Coomera River estuary— (i) to minimise changes, as far as practicable, to freshwater flows into the Coomera River estuary; and (ii) to minimise changes to the freshwater inflows to Coombabah Lake.\n- (i) to minimise changes, as far as practicable, to freshwater flows into the Coomera River estuary; and\n- (ii) to minimise changes to the freshwater inflows to Coombabah Lake.\n- (i) to minimise changes to river-forming processes; and\n- (ii) to minimise changes to the flow regime;\n- (i) to minimise changes, as far as practicable, to freshwater flows into the Coomera River estuary; and\n- (ii) to minimise changes to the freshwater inflows to Coombabah Lake.","sortOrder":13},{"sectionNumber":"pt.4","sectionType":"part","heading":"Performance indicators and objectives","content":"# Performance indicators and objectives","sortOrder":14},{"sectionNumber":"pt.4-div.1","sectionType":"division","heading":"Environmental flow objectives","content":"## Environmental flow objectives","sortOrder":15},{"sectionNumber":"sec.12","sectionType":"section","heading":"Performance indicators for environmental flow objectives","content":"### sec.12 Performance indicators for environmental flow objectives\n\nThe performance indicators for the environmental flow objectives are—\nfor assessing periods of low flow—\n50% daily flow; and\n90% daily flow; and\ndaily flow less than 1ML; and\nnumber of periods of no flow of at least 1 month but less than 3 months; and\nnumber of periods of no flow of at least 3 months but less than 6 months; and\nnumber of periods of no flow of at least 6 months; and\nfor assessing periods of medium to high flow—\nmean annual flow; and\n1.5 year daily flow volume; and\n5 year daily flow volume; and\n20 year daily flow volume; and\nfor assessing seasonal flow patterns—\nflow regime class; and\nannual proportional flow deviation.\n- (a) for assessing periods of low flow— (i) 50% daily flow; and (ii) 90% daily flow; and (iii) daily flow less than 1ML; and (iv) number of periods of no flow of at least 1 month but less than 3 months; and (v) number of periods of no flow of at least 3 months but less than 6 months; and (vi) number of periods of no flow of at least 6 months; and\n- (i) 50% daily flow; and\n- (ii) 90% daily flow; and\n- (iii) daily flow less than 1ML; and\n- (iv) number of periods of no flow of at least 1 month but less than 3 months; and\n- (v) number of periods of no flow of at least 3 months but less than 6 months; and\n- (vi) number of periods of no flow of at least 6 months; and\n- (b) for assessing periods of medium to high flow— (i) mean annual flow; and (ii) 1.5 year daily flow volume; and (iii) 5 year daily flow volume; and (iv) 20 year daily flow volume; and\n- (i) mean annual flow; and\n- (ii) 1.5 year daily flow volume; and\n- (iii) 5 year daily flow volume; and\n- (iv) 20 year daily flow volume; and\n- (c) for assessing seasonal flow patterns— (i) flow regime class; and (ii) annual proportional flow deviation.\n- (i) flow regime class; and\n- (ii) annual proportional flow deviation.\n- (i) 50% daily flow; and\n- (ii) 90% daily flow; and\n- (iii) daily flow less than 1ML; and\n- (iv) number of periods of no flow of at least 1 month but less than 3 months; and\n- (v) number of periods of no flow of at least 3 months but less than 6 months; and\n- (vi) number of periods of no flow of at least 6 months; and\n- (i) mean annual flow; and\n- (ii) 1.5 year daily flow volume; and\n- (iii) 5 year daily flow volume; and\n- (iv) 20 year daily flow volume; and\n- (i) flow regime class; and\n- (ii) annual proportional flow deviation.","sortOrder":16},{"sectionNumber":"sec.13","sectionType":"section","heading":"Environmental flow objectives","content":"### sec.13 Environmental flow objectives\n\nThe environmental flow objectives for this plan are stated in schedule&#160;5 .","sortOrder":17},{"sectionNumber":"pt.4-div.2","sectionType":"division","heading":"Water allocation security objectives","content":"## Water allocation security objectives","sortOrder":18},{"sectionNumber":"sec.14","sectionType":"section","heading":"Performance indicators for water allocation security objectives","content":"### sec.14 Performance indicators for water allocation security objectives\n\nThe performance indicators for the water allocation security objectives are—\nfor taking supplemented water—monthly supplemented water sharing index; and\nfor taking unsupplemented water—70% unsupplemented water sharing index.\n- (a) for taking supplemented water—monthly supplemented water sharing index; and\n- (b) for taking unsupplemented water—70% unsupplemented water sharing index.","sortOrder":19},{"sectionNumber":"sec.15","sectionType":"section","heading":"Water allocation security objectives","content":"### sec.15 Water allocation security objectives\n\nThe water allocation security objectives for this plan are stated in schedule&#160;6 .","sortOrder":20},{"sectionNumber":"pt.5","sectionType":"part","heading":"Strategies for achieving outcomes","content":"# Strategies for achieving outcomes","sortOrder":21},{"sectionNumber":"pt.5-div.1","sectionType":"division","heading":"Decisions made under this plan","content":"## Decisions made under this plan","sortOrder":22},{"sectionNumber":"sec.16","sectionType":"section","heading":"Application of div&#160;1","content":"### sec.16 Application of div&#160;1\n\nThis division applies to decisions about the allocation or management of water in the plan area, other than a decision—\nabout reinstating or replacing an expired water licence; or\nto grant a water entitlement to a local government, government agency or the water grid manager for the continued taking of or interfering with water.\ns&#160;16 amd 2008 Act&#160;No.&#160;34 s&#160;751 sch&#160;2\n- (a) about reinstating or replacing an expired water licence; or\n- (b) to grant a water entitlement to a local government, government agency or the water grid manager for the continued taking of or interfering with water.","sortOrder":23},{"sectionNumber":"sec.17","sectionType":"section","heading":"Decisions consistent with objectives","content":"### sec.17 Decisions consistent with objectives\n\nDecisions about the allocation or management of water in the plan area, other than a decision about a water permit, must be consistent with—\nthe environmental flow objectives stated in schedule&#160;5 ; and\nthe water allocation security objectives stated in schedule&#160;6 .\n- (a) the environmental flow objectives stated in schedule&#160;5 ; and\n- (b) the water allocation security objectives stated in schedule&#160;6 .","sortOrder":24},{"sectionNumber":"sec.18","sectionType":"section","heading":"Assessing impact of decisions","content":"### sec.18 Assessing impact of decisions\n\nThe IQQM computer program’s simulation for the simulation period is used to assess consistency with the objectives.\nIf it is not practicable to use the IQQM computer program, another assessment method approved by the chief executive may be used.\nThe chief executive may approve an assessment method for subsection&#160;(2) only if the chief executive is satisfied the method will assess consistency with the objectives at least as accurately as the IQQM computer program.\n(sec.18-ssec.1) The IQQM computer program’s simulation for the simulation period is used to assess consistency with the objectives.\n(sec.18-ssec.2) If it is not practicable to use the IQQM computer program, another assessment method approved by the chief executive may be used.\n(sec.18-ssec.3) The chief executive may approve an assessment method for subsection&#160;(2) only if the chief executive is satisfied the method will assess consistency with the objectives at least as accurately as the IQQM computer program.","sortOrder":25},{"sectionNumber":"sec.19","sectionType":"section","heading":"Decisions not to increase amount of water taken","content":"### sec.19 Decisions not to increase amount of water taken\n\nThe chief executive must not make a decision that would increase the average volume of water available to be taken in the plan area.\nSubsection&#160;(1) does not apply to a decision—\nabout unallocated water made under section&#160;23 or 24 ; or\nabout a water permit.\nA decision mentioned in subsection&#160;(1) includes a decision about an application for an authorisation to take water made but not dealt with before the commencement of this plan.\ns&#160;19 amd 2008 Act&#160;No.&#160;34 s&#160;751 sch&#160;2\n(sec.19-ssec.1) The chief executive must not make a decision that would increase the average volume of water available to be taken in the plan area.\n(sec.19-ssec.2) Subsection&#160;(1) does not apply to a decision— about unallocated water made under section&#160;23 or 24 ; or about a water permit.\n(sec.19-ssec.3) A decision mentioned in subsection&#160;(1) includes a decision about an application for an authorisation to take water made but not dealt with before the commencement of this plan.\n- (a) about unallocated water made under section&#160;23 or 24 ; or\n- (b) about a water permit.","sortOrder":26},{"sectionNumber":"sec.20","sectionType":"section","heading":"Restriction on taking water from waterholes or lakes","content":"### sec.20 Restriction on taking water from waterholes or lakes\n\nThe chief executive may grant an authorisation to take water from a waterhole or lake only if—\nthe chief executive imposes a condition on the authorisation about maintaining the cultural or environmental values of the waterhole or lake; or\nthe chief executive is satisfied the taking of the water will not adversely affect the cultural and environmental values of the waterhole or lake.\na condition that the water may be taken only if the water level in the waterhole or lake is above the level that is 0.5m below the level at which the waterhole or lake naturally overflows\nIn making a decision under subsection&#160;(1) , the chief executive must consider—\nthe impact the proposed taking of the water may have on the following—\nwater quality;\ninundation of habitats;\nthe movement of fish and other aquatic species;\nthe natural movement of sediment;\nrecreation and aesthetic values;\ncultural values including, for example, cultural values of the traditional owners of the area; and\nwhether the proposed taking is likely to have a direct adverse effect on groundwater flows.\nAn authorisation mentioned in subsection&#160;(1) does not include a water allocation converted from an authorisation under division&#160;5 .\nSubsection&#160;(1) does not limit the restrictions that may be imposed on the taking of water from a waterhole or lake.\nSubsection&#160;(2) does not limit the matters the chief executive may consider.\n(sec.20-ssec.1) The chief executive may grant an authorisation to take water from a waterhole or lake only if— the chief executive imposes a condition on the authorisation about maintaining the cultural or environmental values of the waterhole or lake; or the chief executive is satisfied the taking of the water will not adversely affect the cultural and environmental values of the waterhole or lake. a condition that the water may be taken only if the water level in the waterhole or lake is above the level that is 0.5m below the level at which the waterhole or lake naturally overflows\n(sec.20-ssec.2) In making a decision under subsection&#160;(1) , the chief executive must consider— the impact the proposed taking of the water may have on the following— water quality; inundation of habitats; the movement of fish and other aquatic species; the natural movement of sediment; recreation and aesthetic values; cultural values including, for example, cultural values of the traditional owners of the area; and whether the proposed taking is likely to have a direct adverse effect on groundwater flows.\n(sec.20-ssec.3) An authorisation mentioned in subsection&#160;(1) does not include a water allocation converted from an authorisation under division&#160;5 .\n(sec.20-ssec.4) Subsection&#160;(1) does not limit the restrictions that may be imposed on the taking of water from a waterhole or lake.\n(sec.20-ssec.5) Subsection&#160;(2) does not limit the matters the chief executive may consider.\n- (a) the chief executive imposes a condition on the authorisation about maintaining the cultural or environmental values of the waterhole or lake; or\n- (b) the chief executive is satisfied the taking of the water will not adversely affect the cultural and environmental values of the waterhole or lake. Example for paragraph&#160;(a) — a condition that the water may be taken only if the water level in the waterhole or lake is above the level that is 0.5m below the level at which the waterhole or lake naturally overflows\n- (a) the impact the proposed taking of the water may have on the following— (i) water quality; (ii) inundation of habitats; (iii) the movement of fish and other aquatic species; (iv) the natural movement of sediment; (v) recreation and aesthetic values; (vi) cultural values including, for example, cultural values of the traditional owners of the area; and\n- (i) water quality;\n- (ii) inundation of habitats;\n- (iii) the movement of fish and other aquatic species;\n- (iv) the natural movement of sediment;\n- (v) recreation and aesthetic values;\n- (vi) cultural values including, for example, cultural values of the traditional owners of the area; and\n- (b) whether the proposed taking is likely to have a direct adverse effect on groundwater flows.\n- (i) water quality;\n- (ii) inundation of habitats;\n- (iii) the movement of fish and other aquatic species;\n- (iv) the natural movement of sediment;\n- (v) recreation and aesthetic values;\n- (vi) cultural values including, for example, cultural values of the traditional owners of the area; and","sortOrder":27},{"sectionNumber":"pt.5-div.2","sectionType":"division","heading":"General and strategic reserves","content":"## General and strategic reserves","sortOrder":28},{"sectionNumber":"sec.21","sectionType":"section","heading":"Unallocated water held as general or strategic reserve","content":"### sec.21 Unallocated water held as general or strategic reserve\n\nUnallocated water is held as a general or strategic reserve and dealt with under this division.","sortOrder":29},{"sectionNumber":"sec.22","sectionType":"section","heading":"Matters chief executive must consider","content":"### sec.22 Matters chief executive must consider\n\nIn dealing with unallocated water, the chief executive must consider—\nthe need for, and efficiency of, present and proposed uses of water including—\nthe extent to which water is being taken under authorisations in the plan area; and\nemerging requirements for additional water, in and outside the plan area, and the likely timeframe in which the additional water will be required; and\nalternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\nthe availability of an alternative water supply for the purpose for which the water is required; and\nthe impact the proposed taking of or interfering with the water may have on the following—\nwater quality;\nestuarine areas;\ninundation of habitats;\nthe movement of fish and other aquatic species;\nthe natural movement of sediment;\nrecreation and aesthetic values;\ncultural values, including, for example, cultural values of traditional owners of the area; and\nwhether the proposed taking of or interfering with, or the proposed use of, the water is likely to—\nhave a direct adverse effect on groundwater; or\nlead to degradation of land, downstream watercourses or estuarine or marine waters; and\nwhether the proposed use of the water is consistent with—\nthe SEQ regional plan; and\nany system operating plan applying to the plan area; and\nany regional water security program for the SEQ region; and\nwhether the proposed taking of or interfering with, or the proposed use of, the water is consistent with the ecological outcomes mentioned in section&#160;11 ; and\nif the process in the resource operations plan for granting unallocated water includes a public auction, public ballot or public tender—the price offered under the process.\nIn considering the impact the proposed taking of or interfering with the water may have on water quality under subsection&#160;(1) (c) (i) , the chief executive must have regard to the Environmental Protection (Water and Wetland Biodiversity) Policy 2019 .\nSubsection&#160;(1) does not limit the matters the chief executive may consider.\ns&#160;22 amd 2019 SL&#160;No.&#160;155 s&#160;233\n(sec.22-ssec.1) In dealing with unallocated water, the chief executive must consider— the need for, and efficiency of, present and proposed uses of water including— the extent to which water is being taken under authorisations in the plan area; and emerging requirements for additional water, in and outside the plan area, and the likely timeframe in which the additional water will be required; and alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and the availability of an alternative water supply for the purpose for which the water is required; and the impact the proposed taking of or interfering with the water may have on the following— water quality; estuarine areas; inundation of habitats; the movement of fish and other aquatic species; the natural movement of sediment; recreation and aesthetic values; cultural values, including, for example, cultural values of traditional owners of the area; and whether the proposed taking of or interfering with, or the proposed use of, the water is likely to— have a direct adverse effect on groundwater; or lead to degradation of land, downstream watercourses or estuarine or marine waters; and whether the proposed use of the water is consistent with— the SEQ regional plan; and any system operating plan applying to the plan area; and any regional water security program for the SEQ region; and whether the proposed taking of or interfering with, or the proposed use of, the water is consistent with the ecological outcomes mentioned in section&#160;11 ; and if the process in the resource operations plan for granting unallocated water includes a public auction, public ballot or public tender—the price offered under the process.\n(sec.22-ssec.2) In considering the impact the proposed taking of or interfering with the water may have on water quality under subsection&#160;(1) (c) (i) , the chief executive must have regard to the Environmental Protection (Water and Wetland Biodiversity) Policy 2019 .\n(sec.22-ssec.3) Subsection&#160;(1) does not limit the matters the chief executive may consider.\n- (a) the need for, and efficiency of, present and proposed uses of water including— (i) the extent to which water is being taken under authorisations in the plan area; and (ii) emerging requirements for additional water, in and outside the plan area, and the likely timeframe in which the additional water will be required; and (iii) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\n- (i) the extent to which water is being taken under authorisations in the plan area; and\n- (ii) emerging requirements for additional water, in and outside the plan area, and the likely timeframe in which the additional water will be required; and\n- (iii) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\n- (b) the availability of an alternative water supply for the purpose for which the water is required; and\n- (c) the impact the proposed taking of or interfering with the water may have on the following— (i) water quality; (ii) estuarine areas; (iii) inundation of habitats; (iv) the movement of fish and other aquatic species; (v) the natural movement of sediment; (vi) recreation and aesthetic values; (vii) cultural values, including, for example, cultural values of traditional owners of the area; and\n- (i) water quality;\n- (ii) estuarine areas;\n- (iii) inundation of habitats;\n- (iv) the movement of fish and other aquatic species;\n- (v) the natural movement of sediment;\n- (vi) recreation and aesthetic values;\n- (vii) cultural values, including, for example, cultural values of traditional owners of the area; and\n- (d) whether the proposed taking of or interfering with, or the proposed use of, the water is likely to— (i) have a direct adverse effect on groundwater; or (ii) lead to degradation of land, downstream watercourses or estuarine or marine waters; and\n- (i) have a direct adverse effect on groundwater; or\n- (ii) lead to degradation of land, downstream watercourses or estuarine or marine waters; and\n- (e) whether the proposed use of the water is consistent with— (i) the SEQ regional plan; and (ii) any system operating plan applying to the plan area; and (iii) any regional water security program for the SEQ region; and\n- (i) the SEQ regional plan; and\n- (ii) any system operating plan applying to the plan area; and\n- (iii) any regional water security program for the SEQ region; and\n- (f) whether the proposed taking of or interfering with, or the proposed use of, the water is consistent with the ecological outcomes mentioned in section&#160;11 ; and\n- (g) if the process in the resource operations plan for granting unallocated water includes a public auction, public ballot or public tender—the price offered under the process.\n- (i) the extent to which water is being taken under authorisations in the plan area; and\n- (ii) emerging requirements for additional water, in and outside the plan area, and the likely timeframe in which the additional water will be required; and\n- (iii) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\n- (i) water quality;\n- (ii) estuarine areas;\n- (iii) inundation of habitats;\n- (iv) the movement of fish and other aquatic species;\n- (v) the natural movement of sediment;\n- (vi) recreation and aesthetic values;\n- (vii) cultural values, including, for example, cultural values of traditional owners of the area; and\n- (i) have a direct adverse effect on groundwater; or\n- (ii) lead to degradation of land, downstream watercourses or estuarine or marine waters; and\n- (i) the SEQ regional plan; and\n- (ii) any system operating plan applying to the plan area; and\n- (iii) any regional water security program for the SEQ region; and","sortOrder":30},{"sectionNumber":"sec.23","sectionType":"section","heading":"Granting unallocated water from the general reserve","content":"### sec.23 Granting unallocated water from the general reserve\n\nThe chief executive may grant unallocated water from the general reserve under a process in the resource operations plan.\nHowever, the chief executive—\nmay grant unallocated water from the general reserve only for the subcatchment areas mentioned in schedule&#160;7 , column 1; and\nmust not grant unallocated water from the general reserve for a subcatchment area if, in granting the unallocated water, the total amount of unallocated water granted for the subcatchment area is more than the volume stated in schedule&#160;7 , column 2, opposite the subcatchment area; and\nmust, in granting a water entitlement for unallocated water, state flow conditions that provide for the protection of low flows in watercourses.\n(sec.23-ssec.1) The chief executive may grant unallocated water from the general reserve under a process in the resource operations plan.\n(sec.23-ssec.2) However, the chief executive— may grant unallocated water from the general reserve only for the subcatchment areas mentioned in schedule&#160;7 , column 1; and must not grant unallocated water from the general reserve for a subcatchment area if, in granting the unallocated water, the total amount of unallocated water granted for the subcatchment area is more than the volume stated in schedule&#160;7 , column 2, opposite the subcatchment area; and must, in granting a water entitlement for unallocated water, state flow conditions that provide for the protection of low flows in watercourses.\n- (a) may grant unallocated water from the general reserve only for the subcatchment areas mentioned in schedule&#160;7 , column 1; and\n- (b) must not grant unallocated water from the general reserve for a subcatchment area if, in granting the unallocated water, the total amount of unallocated water granted for the subcatchment area is more than the volume stated in schedule&#160;7 , column 2, opposite the subcatchment area; and\n- (c) must, in granting a water entitlement for unallocated water, state flow conditions that provide for the protection of low flows in watercourses.","sortOrder":31},{"sectionNumber":"sec.24","sectionType":"section","heading":"Granting unallocated water from the strategic reserve","content":"### sec.24 Granting unallocated water from the strategic reserve\n\nUnallocated water may be granted or reserved from the strategic reserve only—\nfor infrastructure for a project declared under the State Development and Public Works Organisation Act 1971 , section&#160;26 , to be a significant project; or\nfor infrastructure identified for—\nthe SEQ regional plan; or\na regional water security program; or\nunder a process in the resource operations plan.\n- (a) for infrastructure for a project declared under the State Development and Public Works Organisation Act 1971 , section&#160;26 , to be a significant project; or\n- (b) for infrastructure identified for— (i) the SEQ regional plan; or (ii) a regional water security program; or\n- (i) the SEQ regional plan; or\n- (ii) a regional water security program; or\n- (c) under a process in the resource operations plan.\n- (i) the SEQ regional plan; or\n- (ii) a regional water security program; or","sortOrder":32},{"sectionNumber":"pt.5-div.3","sectionType":"division","heading":null,"content":"","sortOrder":33},{"sectionNumber":"sec.25","sectionType":"section","heading":null,"content":"### Section sec.25\n\ns&#160;25 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":34},{"sectionNumber":"sec.26","sectionType":"section","heading":null,"content":"### Section sec.26\n\ns&#160;26 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":35},{"sectionNumber":"sec.27","sectionType":"section","heading":null,"content":"### Section sec.27\n\ns&#160;27 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":36},{"sectionNumber":"sec.28","sectionType":"section","heading":null,"content":"### Section sec.28\n\ns&#160;28 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":37},{"sectionNumber":"sec.29","sectionType":"section","heading":null,"content":"### Section sec.29\n\ns&#160;29 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":38},{"sectionNumber":"sec.30","sectionType":"section","heading":null,"content":"### Section sec.30\n\ns&#160;30 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":39},{"sectionNumber":"sec.31","sectionType":"section","heading":null,"content":"### Section sec.31\n\ns&#160;31 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":40},{"sectionNumber":"sec.32","sectionType":"section","heading":null,"content":"### Section sec.32\n\ns&#160;32 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":41},{"sectionNumber":"sec.33","sectionType":"section","heading":null,"content":"### Section sec.33\n\ns&#160;33 om 2014 SL&#160;No.&#160;142 s&#160;86","sortOrder":42},{"sectionNumber":"pt.5-div.4","sectionType":"division","heading":"Deciding operational and supply arrangements for water infrastructure","content":"## Deciding operational and supply arrangements for water infrastructure","sortOrder":43},{"sectionNumber":"sec.34","sectionType":"section","heading":null,"content":"### Section sec.34\n\ns&#160;34 sub 2008 Act&#160;No.&#160;34 s&#160;751 sch&#160;2\nom 2014 SL&#160;No.&#160;142 s&#160;88","sortOrder":44},{"sectionNumber":"sec.35","sectionType":"section","heading":"Matters chief executive must consider","content":"### sec.35 Matters chief executive must consider\n\nIn deciding the operating arrangements and supply requirements for water infrastructure under the resource operations licence for the Nerang water supply scheme, the chief executive must consider—\nthe impact of the infrastructure’s operation on the following—\nthe water allocation security objectives;\nwater quality;\ninstream water levels;\nerosion of the bed and banks of watercourses;\nriparian vegetation;\nthe extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems;\nrecreation and aesthetic values of the plan area;\ncultural values, including, for example, cultural values of the traditional owners of the area; and\nthe impact of the infrastructure on the movement of fish and other aquatic species; and\nthe impact of the transfer of water between watercourses; and\nthe likelihood of fish deaths caused by the operation of the infrastructure; and\nthe joint operation of all the infrastructure; and\nany system operating plan applying to the plan area; and\nany regional water security program for the SEQ region.\nSubsection&#160;(1) does not limit the matters the chief executive may consider.\ns&#160;35 amd 2008 Act&#160;No.&#160;34 s&#160;751 sch&#160;2 ; 2014 SL&#160;No.&#160;142 s&#160;89\n(sec.35-ssec.1) In deciding the operating arrangements and supply requirements for water infrastructure under the resource operations licence for the Nerang water supply scheme, the chief executive must consider— the impact of the infrastructure’s operation on the following— the water allocation security objectives; water quality; instream water levels; erosion of the bed and banks of watercourses; riparian vegetation; the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems; recreation and aesthetic values of the plan area; cultural values, including, for example, cultural values of the traditional owners of the area; and the impact of the infrastructure on the movement of fish and other aquatic species; and the impact of the transfer of water between watercourses; and the likelihood of fish deaths caused by the operation of the infrastructure; and the joint operation of all the infrastructure; and any system operating plan applying to the plan area; and any regional water security program for the SEQ region.\n(sec.35-ssec.2) Subsection&#160;(1) does not limit the matters the chief executive may consider.\n- (a) the impact of the infrastructure’s operation on the following— (i) the water allocation security objectives; (ii) water quality; (iii) instream water levels; (iv) erosion of the bed and banks of watercourses; (v) riparian vegetation; (vi) the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems; (vii) recreation and aesthetic values of the plan area; (viii) cultural values, including, for example, cultural values of the traditional owners of the area; and\n- (i) the water allocation security objectives;\n- (ii) water quality;\n- (iii) instream water levels;\n- (iv) erosion of the bed and banks of watercourses;\n- (v) riparian vegetation;\n- (vi) the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems;\n- (vii) recreation and aesthetic values of the plan area;\n- (viii) cultural values, including, for example, cultural values of the traditional owners of the area; and\n- (b) the impact of the infrastructure on the movement of fish and other aquatic species; and\n- (c) the impact of the transfer of water between watercourses; and\n- (d) the likelihood of fish deaths caused by the operation of the infrastructure; and\n- (e) the joint operation of all the infrastructure; and\n- (f) any system operating plan applying to the plan area; and\n- (g) any regional water security program for the SEQ region.\n- (i) the water allocation security objectives;\n- (ii) water quality;\n- (iii) instream water levels;\n- (iv) erosion of the bed and banks of watercourses;\n- (v) riparian vegetation;\n- (vi) the extent to which artificial variations in instream water levels and flows may adversely affect natural ecosystems;\n- (vii) recreation and aesthetic values of the plan area;\n- (viii) cultural values, including, for example, cultural values of the traditional owners of the area; and","sortOrder":45},{"sectionNumber":"pt.5-div.5","sectionType":"division","heading":"Converting authorisations to water allocations","content":"## Converting authorisations to water allocations","sortOrder":46},{"sectionNumber":"sec.36","sectionType":"section","heading":"Application of div&#160;5","content":"### sec.36 Application of div&#160;5\n\nThis division applies only to water allocations converted, under the resource operations plan, from authorisations.","sortOrder":47},{"sectionNumber":"sec.37","sectionType":"section","heading":"Location for taking water","content":"### sec.37 Location for taking water\n\nThe location for taking water stated on a water allocation must include the place at which water could have been taken under the authorisation.","sortOrder":48},{"sectionNumber":"sec.38","sectionType":"section","heading":"Purpose to be stated on water allocation","content":"### sec.38 Purpose to be stated on water allocation\n\nThe purpose stated on a water allocation must be ‘any’.","sortOrder":49},{"sectionNumber":"sec.39","sectionType":"section","heading":null,"content":"### Section sec.39\n\ns&#160;39 om 2014 SL&#160;No.&#160;142 s&#160;90","sortOrder":50},{"sectionNumber":"sec.40","sectionType":"section","heading":null,"content":"### Section sec.40\n\ns&#160;40 om 2014 SL&#160;No.&#160;142 s&#160;90","sortOrder":51},{"sectionNumber":"sec.41","sectionType":"section","heading":"Elements of a water allocation to take unsupplemented water","content":"### sec.41 Elements of a water allocation to take unsupplemented water\n\nA water allocation to take unsupplemented water must state—\nthe maximum rate at which water may be taken under the allocation; and\nthe annual volumetric limit for the allocation.\ns&#160;41 sub 2014 SL&#160;No.&#160;142 s&#160;91\n- (a) the maximum rate at which water may be taken under the allocation; and\n- (b) the annual volumetric limit for the allocation.","sortOrder":52},{"sectionNumber":"sec.42","sectionType":"section","heading":"Nominal volumes for water allocations to take unsupplemented water","content":"### sec.42 Nominal volumes for water allocations to take unsupplemented water\n\nIn deciding the nominal volume for a water allocation in a subcatchment area mentioned in schedule&#160;8 , column 1, the chief executive—\nmust consider, for each authorisation—\nthe local availability of water; and\nthe conditions under which water may be taken under the authorisation; and\nthe annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\nthe simulated mean annual diversion for the authorisation; and\nthe efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\nmust ensure—\nthe total of the nominal volumes for the water allocations, converted from authorisations that state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 2, for the area; and\nthe total of the nominal volumes for the water allocations, converted from authorisations that do not state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 3, for the area.\n- (a) must consider, for each authorisation— (i) the local availability of water; and (ii) the conditions under which water may be taken under the authorisation; and (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and (iv) the simulated mean annual diversion for the authorisation; and (v) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\n- (i) the local availability of water; and\n- (ii) the conditions under which water may be taken under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\n- (iv) the simulated mean annual diversion for the authorisation; and\n- (v) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\n- (b) must ensure— (i) the total of the nominal volumes for the water allocations, converted from authorisations that state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 2, for the area; and (ii) the total of the nominal volumes for the water allocations, converted from authorisations that do not state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 3, for the area.\n- (i) the total of the nominal volumes for the water allocations, converted from authorisations that state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 2, for the area; and\n- (ii) the total of the nominal volumes for the water allocations, converted from authorisations that do not state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 3, for the area.\n- (i) the local availability of water; and\n- (ii) the conditions under which water may be taken under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\n- (iv) the simulated mean annual diversion for the authorisation; and\n- (v) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\n- (i) the total of the nominal volumes for the water allocations, converted from authorisations that state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 2, for the area; and\n- (ii) the total of the nominal volumes for the water allocations, converted from authorisations that do not state an area that may be irrigated, in the subcatchment area is not more than the volume stated in schedule&#160;8 , column 3, for the area.","sortOrder":53},{"sectionNumber":"sec.43","sectionType":"section","heading":"Annual volumetric limit for taking unsupplemented water","content":"### sec.43 Annual volumetric limit for taking unsupplemented water\n\nThe annual volumetric limit for a water allocation to take unsupplemented water is—\nif the authorisation states an annual volume of water—the stated volume; and\nif the authorisation does not state an annual volume of water—the volume decided by the chief executive having regard to—\nthe conditions under which water may be taken under the authorisation, including any stated area that may be irrigated and the volume of water required to irrigate the area efficiently; and\nthe water taking capacity of any works, being used or authorised to be used, for taking water under the authorisation; and\nthe annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\nthe efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\nSubsection&#160;(1) (b) does not limit the matters the chief executive may consider.\n(sec.43-ssec.1) The annual volumetric limit for a water allocation to take unsupplemented water is— if the authorisation states an annual volume of water—the stated volume; and if the authorisation does not state an annual volume of water—the volume decided by the chief executive having regard to— the conditions under which water may be taken under the authorisation, including any stated area that may be irrigated and the volume of water required to irrigate the area efficiently; and the water taking capacity of any works, being used or authorised to be used, for taking water under the authorisation; and the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\n(sec.43-ssec.2) Subsection&#160;(1) (b) does not limit the matters the chief executive may consider.\n- (a) if the authorisation states an annual volume of water—the stated volume; and\n- (b) if the authorisation does not state an annual volume of water—the volume decided by the chief executive having regard to— (i) the conditions under which water may be taken under the authorisation, including any stated area that may be irrigated and the volume of water required to irrigate the area efficiently; and (ii) the water taking capacity of any works, being used or authorised to be used, for taking water under the authorisation; and (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\n- (i) the conditions under which water may be taken under the authorisation, including any stated area that may be irrigated and the volume of water required to irrigate the area efficiently; and\n- (ii) the water taking capacity of any works, being used or authorised to be used, for taking water under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\n- (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\n- (i) the conditions under which water may be taken under the authorisation, including any stated area that may be irrigated and the volume of water required to irrigate the area efficiently; and\n- (ii) the water taking capacity of any works, being used or authorised to be used, for taking water under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\n- (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .","sortOrder":54},{"sectionNumber":"sec.44","sectionType":"section","heading":null,"content":"### Section sec.44\n\ns&#160;44 om 2014 SL&#160;No.&#160;142 s&#160;92","sortOrder":55},{"sectionNumber":"sec.45","sectionType":"section","heading":"Maximum rates for taking unsupplemented water","content":"### sec.45 Maximum rates for taking unsupplemented water\n\nThe maximum rate at which unsupplemented water may be taken under a water allocation is—\nif the authorisation states a maximum rate—the stated rate; and\nif the authorisation does not state a maximum rate but for which a related development permit states a pump size mentioned in schedule&#160;9 , column 1—\nif the authorisation holder satisfies the chief executive that the actual rate at which water can be taken is different from the rate stated in schedule&#160;9 , column 2, for the pump size—the rate decided by the chief executive having regard to—\nthe conditions under which water may be taken under the authorisation; and\nthe water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and\nthe irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and\nthe efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or\notherwise—the rate stated in schedule&#160;9 , column 2, for the pump size; and\nif the authorisation does not state a maximum rate but a related development permit states a pump size other than a pump size mentioned in schedule&#160;9 , column 1—the rate decided by the chief executive having regard to the matters mentioned in paragraph&#160;(b) (i) (A) to (D); and\nif paragraphs&#160;(a) to (c) do not apply—the rate decided by the chief executive having regard to—\nthe nature of the authorisation; and\nan estimate of the rate, or measurement of the actual rate, at which water is taken under the authorisation.\n- (a) if the authorisation states a maximum rate—the stated rate; and\n- (b) if the authorisation does not state a maximum rate but for which a related development permit states a pump size mentioned in schedule&#160;9 , column 1— (i) if the authorisation holder satisfies the chief executive that the actual rate at which water can be taken is different from the rate stated in schedule&#160;9 , column 2, for the pump size—the rate decided by the chief executive having regard to— (A) the conditions under which water may be taken under the authorisation; and (B) the water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and (C) the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and (D) the efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or (ii) otherwise—the rate stated in schedule&#160;9 , column 2, for the pump size; and\n- (i) if the authorisation holder satisfies the chief executive that the actual rate at which water can be taken is different from the rate stated in schedule&#160;9 , column 2, for the pump size—the rate decided by the chief executive having regard to— (A) the conditions under which water may be taken under the authorisation; and (B) the water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and (C) the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and (D) the efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or\n- (A) the conditions under which water may be taken under the authorisation; and\n- (B) the water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and\n- (C) the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and\n- (D) the efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or\n- (ii) otherwise—the rate stated in schedule&#160;9 , column 2, for the pump size; and\n- (c) if the authorisation does not state a maximum rate but a related development permit states a pump size other than a pump size mentioned in schedule&#160;9 , column 1—the rate decided by the chief executive having regard to the matters mentioned in paragraph&#160;(b) (i) (A) to (D); and\n- (d) if paragraphs&#160;(a) to (c) do not apply—the rate decided by the chief executive having regard to— (i) the nature of the authorisation; and (ii) an estimate of the rate, or measurement of the actual rate, at which water is taken under the authorisation.\n- (i) the nature of the authorisation; and\n- (ii) an estimate of the rate, or measurement of the actual rate, at which water is taken under the authorisation.\n- (i) if the authorisation holder satisfies the chief executive that the actual rate at which water can be taken is different from the rate stated in schedule&#160;9 , column 2, for the pump size—the rate decided by the chief executive having regard to— (A) the conditions under which water may be taken under the authorisation; and (B) the water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and (C) the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and (D) the efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or\n- (A) the conditions under which water may be taken under the authorisation; and\n- (B) the water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and\n- (C) the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and\n- (D) the efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or\n- (ii) otherwise—the rate stated in schedule&#160;9 , column 2, for the pump size; and\n- (A) the conditions under which water may be taken under the authorisation; and\n- (B) the water taking capacity of the pump to which the development permit relates (the existing pump ) under normal operating conditions; and\n- (C) the irrigation or water distribution system related to the existing pump during the period of not more than 10 years immediately before the commencement of this plan; and\n- (D) the efficiency of the irrigation or water distribution system mentioned in subsubparagraph (C); or\n- (i) the nature of the authorisation; and\n- (ii) an estimate of the rate, or measurement of the actual rate, at which water is taken under the authorisation.","sortOrder":56},{"sectionNumber":"sec.46","sectionType":"section","heading":"Conditions for water allocations to take unsupplemented water","content":"### sec.46 Conditions for water allocations to take unsupplemented water\n\nIn deciding the conditions under which water may be taken under a water allocation to take unsupplemented water, the chief executive must consider the conditions stated on the authorisation.","sortOrder":57},{"sectionNumber":"pt.5-div.6","sectionType":"division","heading":"Authorisations to take unsupplemented water","content":"## Authorisations to take unsupplemented water","sortOrder":58},{"sectionNumber":"sec.47","sectionType":"section","heading":"Amending water licences to take unsupplemented water","content":"### sec.47 Amending water licences to take unsupplemented water\n\nThis section applies to a water licence to take unsupplemented water in force on the commencement of this plan.\nThe licence may be amended under a process in the resource operations plan to state the following—\nthe purpose for which water may be taken under the licence;\nthe annual volumetric limit for the licence;\nthe maximum rate at which water may be taken under the licence;\nthe flow conditions for the licence.\n(sec.47-ssec.1) This section applies to a water licence to take unsupplemented water in force on the commencement of this plan.\n(sec.47-ssec.2) The licence may be amended under a process in the resource operations plan to state the following— the purpose for which water may be taken under the licence; the annual volumetric limit for the licence; the maximum rate at which water may be taken under the licence; the flow conditions for the licence.\n- (a) the purpose for which water may be taken under the licence;\n- (b) the annual volumetric limit for the licence;\n- (c) the maximum rate at which water may be taken under the licence;\n- (d) the flow conditions for the licence.","sortOrder":59},{"sectionNumber":"sec.48","sectionType":"section","heading":"Annual volumetric limit for taking unsupplemented water","content":"### sec.48 Annual volumetric limit for taking unsupplemented water\n\nThis section states the annual volumetric limit for an authorisation to take unsupplemented water in force on the commencement of this plan.\nThe annual volumetric limit is—\nfor an authorisation that states a volume of water that may be taken in a period of 12 months—the stated volume; and\nfor an authorisation that states an area that may be irrigated—the volume decided by the chief executive having regard to—\nthe volume of water required to irrigate the area efficiently; and\nthe water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and\nthe annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement; and\nthe efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\nthe flow conditions under which water may be taken under the authorisation; and\nthe local availability of water; and\nfor another authorisation—the volume decided by the chief executive having regard to—\nthe conditions under which water may be taken under the authorisation; and\nthe water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and\nthe annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\nthe efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\nIn deciding the volume for subsection&#160;(2) (b) , the chief executive must ensure the sum of the annual volumetric limits for all authorisations converted from authorisations that state an area that may be irrigated in a subcatchment area is not more than the volume stated in schedule&#160;8 , column 2, opposite the subcatchment area in column 1 of the schedule.\nIn deciding the volume for subsection&#160;(2) (c) , the chief executive must ensure the sum of the annual volumetric limits for all authorisations converted from authorisations that do not state an area that may be irrigated in a subcatchment area is not more than the volume stated in schedule&#160;8 , column 3, opposite the subcatchment area in column 1 of the schedule.\nSubsection&#160;(2) (b) and (c) do not limit the matters the chief executive may consider.\n(sec.48-ssec.1) This section states the annual volumetric limit for an authorisation to take unsupplemented water in force on the commencement of this plan.\n(sec.48-ssec.2) The annual volumetric limit is— for an authorisation that states a volume of water that may be taken in a period of 12 months—the stated volume; and for an authorisation that states an area that may be irrigated—the volume decided by the chief executive having regard to— the volume of water required to irrigate the area efficiently; and the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement; and the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and the flow conditions under which water may be taken under the authorisation; and the local availability of water; and for another authorisation—the volume decided by the chief executive having regard to— the conditions under which water may be taken under the authorisation; and the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\n(sec.48-ssec.3) In deciding the volume for subsection&#160;(2) (b) , the chief executive must ensure the sum of the annual volumetric limits for all authorisations converted from authorisations that state an area that may be irrigated in a subcatchment area is not more than the volume stated in schedule&#160;8 , column 2, opposite the subcatchment area in column 1 of the schedule.\n(sec.48-ssec.4) In deciding the volume for subsection&#160;(2) (c) , the chief executive must ensure the sum of the annual volumetric limits for all authorisations converted from authorisations that do not state an area that may be irrigated in a subcatchment area is not more than the volume stated in schedule&#160;8 , column 3, opposite the subcatchment area in column 1 of the schedule.\n(sec.48-ssec.5) Subsection&#160;(2) (b) and (c) do not limit the matters the chief executive may consider.\n- (a) for an authorisation that states a volume of water that may be taken in a period of 12 months—the stated volume; and\n- (b) for an authorisation that states an area that may be irrigated—the volume decided by the chief executive having regard to— (i) the volume of water required to irrigate the area efficiently; and (ii) the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement; and (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and (v) the flow conditions under which water may be taken under the authorisation; and (vi) the local availability of water; and\n- (i) the volume of water required to irrigate the area efficiently; and\n- (ii) the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement; and\n- (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\n- (v) the flow conditions under which water may be taken under the authorisation; and\n- (vi) the local availability of water; and\n- (c) for another authorisation—the volume decided by the chief executive having regard to— (i) the conditions under which water may be taken under the authorisation; and (ii) the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\n- (i) the conditions under which water may be taken under the authorisation; and\n- (ii) the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\n- (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .\n- (i) the volume of water required to irrigate the area efficiently; and\n- (ii) the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement; and\n- (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) ; and\n- (v) the flow conditions under which water may be taken under the authorisation; and\n- (vi) the local availability of water; and\n- (i) the conditions under which water may be taken under the authorisation; and\n- (ii) the water taking capacity of any works, in existence on the commencement of this plan, for taking water under the authorisation; and\n- (iii) the annual volumes of water estimated by the chief executive to have been taken under the authorisation during the period, of not more than 10 years, immediately before the commencement of this plan; and\n- (iv) the efficiency of the use of the water mentioned in subparagraph&#160;(iii) .","sortOrder":60},{"sectionNumber":"sec.49","sectionType":"section","heading":"Maximum rates for taking unsupplemented water","content":"### sec.49 Maximum rates for taking unsupplemented water\n\nThe maximum rate at which unsupplemented water may be taken under a water licence mentioned in section&#160;47 (1) is the maximum rate mentioned in section&#160;45 or decided by the chief executive under that section as if the water licence were a water allocation.\ns&#160;49 sub 2014 SL&#160;No.&#160;142 s&#160;93","sortOrder":61},{"sectionNumber":"pt.5-div.7","sectionType":"division","heading":null,"content":"","sortOrder":62},{"sectionNumber":"sec.50","sectionType":"section","heading":null,"content":"### Section sec.50\n\ns&#160;50 om 2014 SL&#160;No.&#160;142 s&#160;94","sortOrder":63},{"sectionNumber":"sec.51","sectionType":"section","heading":null,"content":"### Section sec.51\n\ns&#160;51 om 2014 SL&#160;No.&#160;142 s&#160;94","sortOrder":64},{"sectionNumber":"pt.5-div.8","sectionType":"division","heading":"Miscellaneous","content":"## Miscellaneous","sortOrder":65},{"sectionNumber":"sec.52","sectionType":"section","heading":"Releasing water through fish ways","content":"### sec.52 Releasing water through fish ways\n\nIf water to which this plan applies can be released from a dam or weir through fish ways, the environmental management rules under the resource operations plan must provide for the release.","sortOrder":66},{"sectionNumber":"sec.53","sectionType":"section","heading":null,"content":"### Section sec.53\n\ns&#160;53 om 2014 SL&#160;No.&#160;142 s&#160;95","sortOrder":67},{"sectionNumber":"pt.6","sectionType":"part","heading":"Monitoring and reporting requirements","content":"# Monitoring and reporting requirements","sortOrder":68},{"sectionNumber":"sec.54","sectionType":"section","heading":"Monitoring and reporting requirements","content":"### sec.54 Monitoring and reporting requirements\n\nTo help the Minister assess the effectiveness of the management strategies for achieving the outcomes mentioned in part&#160;3 , the resource operations plan must state—\nthe monitoring requirements for water and natural ecosystems for this plan; and\nthe reporting requirements for this plan for operators of infrastructure interfering with water in the plan area.\nSubsection&#160;(1) does not limit the monitoring requirements the chief executive may impose for this plan.\ns&#160;54 sub 2014 SL&#160;No.&#160;142 s&#160;96\n(sec.54-ssec.1) To help the Minister assess the effectiveness of the management strategies for achieving the outcomes mentioned in part&#160;3 , the resource operations plan must state— the monitoring requirements for water and natural ecosystems for this plan; and the reporting requirements for this plan for operators of infrastructure interfering with water in the plan area.\n(sec.54-ssec.2) Subsection&#160;(1) does not limit the monitoring requirements the chief executive may impose for this plan.\n- (a) the monitoring requirements for water and natural ecosystems for this plan; and\n- (b) the reporting requirements for this plan for operators of infrastructure interfering with water in the plan area.","sortOrder":69},{"sectionNumber":"sec.55","sectionType":"section","heading":null,"content":"### Section sec.55\n\ns&#160;55 sub 2014 SL&#160;No.&#160;142 s&#160;96\nom 2016 SL&#160;No.&#160;216 s&#160;146 sch&#160;20","sortOrder":70},{"sectionNumber":"sec.56","sectionType":"section","heading":null,"content":"### Section sec.56\n\ns&#160;56 om 2014 SL&#160;No.&#160;142 s&#160;96","sortOrder":71},{"sectionNumber":"sec.57","sectionType":"section","heading":null,"content":"### Section sec.57\n\ns&#160;57 om 2014 SL&#160;No.&#160;142 s&#160;96","sortOrder":72},{"sectionNumber":"pt.7","sectionType":"part","heading":"Implementing and amending this plan","content":"# Implementing and amending this plan","sortOrder":73},{"sectionNumber":"sec.58","sectionType":"section","heading":"Priorities for converting to, or granting, water allocations","content":"### sec.58 Priorities for converting to, or granting, water allocations\n\nEach area described in schedule&#160;10 is a priority area for this plan for the conversion to, or granting of, water allocations to take water in the plan area.","sortOrder":74},{"sectionNumber":"sec.59","sectionType":"section","heading":"Implementation schedule","content":"### sec.59 Implementation schedule\n\nThis section states—\nthe proposed arrangements for implementing this plan; and\nthe priorities for the conversion to, or granting of, water allocations.\nWithin 2 years after the commencement of this plan, it is proposed to prepare a resource operations plan—\nto convert authorisations in priority area 1 to water allocations; and\nto deal with unallocated water available for future water requirements in the plan area; and\nto make environmental management rules, water sharing rules, water allocation change rules and seasonal water assignment rules for water in priority area 1; and\nto implement the monitoring requirements in part&#160;6 .\nWithin 4 years after the commencement, it is proposed to amend the resource operations plan—\nto convert authorisations in priority area 2 to water allocations; and\nto make environmental management rules, water sharing rules, water allocation change rules and seasonal water assignment rules for water in priority area 2.\nIt is proposed to make a system operating plan that will apply to the plan area and, to the extent to which it applies to water entitlements in the Nerang water supply scheme, will state additional arrangements for taking water under the water entitlements.\nSee section&#160;360V (Commission to make system operating plan for region) of the Act .\nSubsections&#160;(2) and (3) do not limit the matters that may be included in the resource operations plan.\n(sec.59-ssec.1) This section states— the proposed arrangements for implementing this plan; and the priorities for the conversion to, or granting of, water allocations.\n(sec.59-ssec.2) Within 2 years after the commencement of this plan, it is proposed to prepare a resource operations plan— to convert authorisations in priority area 1 to water allocations; and to deal with unallocated water available for future water requirements in the plan area; and to make environmental management rules, water sharing rules, water allocation change rules and seasonal water assignment rules for water in priority area 1; and to implement the monitoring requirements in part&#160;6 .\n(sec.59-ssec.3) Within 4 years after the commencement, it is proposed to amend the resource operations plan— to convert authorisations in priority area 2 to water allocations; and to make environmental management rules, water sharing rules, water allocation change rules and seasonal water assignment rules for water in priority area 2.\n(sec.59-ssec.4) It is proposed to make a system operating plan that will apply to the plan area and, to the extent to which it applies to water entitlements in the Nerang water supply scheme, will state additional arrangements for taking water under the water entitlements. See section&#160;360V (Commission to make system operating plan for region) of the Act .\n(sec.59-ssec.5) Subsections&#160;(2) and (3) do not limit the matters that may be included in the resource operations plan.\n- (a) the proposed arrangements for implementing this plan; and\n- (b) the priorities for the conversion to, or granting of, water allocations.\n- (a) to convert authorisations in priority area 1 to water allocations; and\n- (b) to deal with unallocated water available for future water requirements in the plan area; and\n- (c) to make environmental management rules, water sharing rules, water allocation change rules and seasonal water assignment rules for water in priority area 1; and\n- (d) to implement the monitoring requirements in part&#160;6 .\n- (a) to convert authorisations in priority area 2 to water allocations; and\n- (b) to make environmental management rules, water sharing rules, water allocation change rules and seasonal water assignment rules for water in priority area 2.","sortOrder":75},{"sectionNumber":"sec.60","sectionType":"section","heading":"Minor or stated amendment of plan— Act , s&#160;57","content":"### sec.60 Minor or stated amendment of plan— Act , s&#160;57\n\nThe following types of amendment may be made to this plan under section&#160;57 (b) of the Act —\nan amendment or addition of an environmental flow objective if the amendment or addition achieves an equivalent or improved ecological outcome without adversely affecting the water allocation security objectives or the outcomes under part&#160;3 ;\nan amendment or addition of a water allocation security objective if the amendment or addition does not adversely affect existing water allocations, environmental flow objectives or the outcomes under part&#160;3 ;\nan amendment or addition of a priority area;\nan amendment or addition of a node;\nan amendment or addition of a priority group;\nan amendment or addition of a water allocation group;\nan amendment to subdivide a subcatchment area or amalgamate subcatchment areas;\nan amendment to subdivide a volume, or amalgamate volumes, stated in schedule&#160;8 ;\nan amendment or addition of a monitoring or reporting requirement under part&#160;6 .\n- (a) an amendment or addition of an environmental flow objective if the amendment or addition achieves an equivalent or improved ecological outcome without adversely affecting the water allocation security objectives or the outcomes under part&#160;3 ;\n- (b) an amendment or addition of a water allocation security objective if the amendment or addition does not adversely affect existing water allocations, environmental flow objectives or the outcomes under part&#160;3 ;\n- (c) an amendment or addition of a priority area;\n- (d) an amendment or addition of a node;\n- (e) an amendment or addition of a priority group;\n- (f) an amendment or addition of a water allocation group;\n- (g) an amendment to subdivide a subcatchment area or amalgamate subcatchment areas;\n- (h) an amendment to subdivide a volume, or amalgamate volumes, stated in schedule&#160;8 ;\n- (i) an amendment or addition of a monitoring or reporting requirement under part&#160;6 .","sortOrder":76},{"sectionNumber":"sec.61","sectionType":"section","heading":"Amending or replacing plan","content":"### sec.61 Amending or replacing plan\n\nThe Minister must consider amending this plan or preparing a new plan to replace this plan if the Minister is satisfied—\nin relation to the outcomes mentioned in part&#160;3 —\nwater entitlements in the plan area are not sufficient to meet water needs sourced from the plan area having regard to—\nthe extent to which water is being taken under the water entitlements; and\nthe efficiency of present, and expected future, water use; and\nemerging requirements for additional water; and\nalternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\nthe likely timeframe in which additional water will be required; and\nthere are economically viable and ecologically sustainable uses for additional water; or\nthe plan’s ecological outcomes are not being achieved; or\nthe plan is inconsistent with the SEQ regional plan.\n- (a) in relation to the outcomes mentioned in part&#160;3 — (i) water entitlements in the plan area are not sufficient to meet water needs sourced from the plan area having regard to— (A) the extent to which water is being taken under the water entitlements; and (B) the efficiency of present, and expected future, water use; and (C) emerging requirements for additional water; and (D) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and (E) the likely timeframe in which additional water will be required; and (ii) there are economically viable and ecologically sustainable uses for additional water; or\n- (i) water entitlements in the plan area are not sufficient to meet water needs sourced from the plan area having regard to— (A) the extent to which water is being taken under the water entitlements; and (B) the efficiency of present, and expected future, water use; and (C) emerging requirements for additional water; and (D) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and (E) the likely timeframe in which additional water will be required; and\n- (A) the extent to which water is being taken under the water entitlements; and\n- (B) the efficiency of present, and expected future, water use; and\n- (C) emerging requirements for additional water; and\n- (D) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\n- (E) the likely timeframe in which additional water will be required; and\n- (ii) there are economically viable and ecologically sustainable uses for additional water; or\n- (b) the plan’s ecological outcomes are not being achieved; or\n- (c) the plan is inconsistent with the SEQ regional plan.\n- (i) water entitlements in the plan area are not sufficient to meet water needs sourced from the plan area having regard to— (A) the extent to which water is being taken under the water entitlements; and (B) the efficiency of present, and expected future, water use; and (C) emerging requirements for additional water; and (D) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and (E) the likely timeframe in which additional water will be required; and\n- (A) the extent to which water is being taken under the water entitlements; and\n- (B) the efficiency of present, and expected future, water use; and\n- (C) emerging requirements for additional water; and\n- (D) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\n- (E) the likely timeframe in which additional water will be required; and\n- (ii) there are economically viable and ecologically sustainable uses for additional water; or\n- (A) the extent to which water is being taken under the water entitlements; and\n- (B) the efficiency of present, and expected future, water use; and\n- (C) emerging requirements for additional water; and\n- (D) alternative water sources including, for example, recycled water and water savings from improvements in the efficiency of water use; and\n- (E) the likely timeframe in which additional water will be required; and","sortOrder":77},{"sectionNumber":"sch.5-pt.1","sectionType":"part","heading":"Low flow objectives","content":"# Low flow objectives","sortOrder":78},{"sectionNumber":"sch.5-sec","sectionType":"section","heading":"Table 1","content":"### sch.5-sec Table 1\n\nAt each node mentioned in table 1, column 1, the 50% daily flow for the pre-development flow pattern for a water flow season is stated in column 2 of the table.\nColumn 1\nColumn 2\nNode\n50% daily flow in megalitres\nFeb–April water flow season\nMay–July water flow season\nAug–Nov water flow season\nDec-Jan water flow season\nA\n241\n164\n60\n83\nB\n49\n29\n11\n17\nC\n334\n123\n40\n126\nD\n88\n33\n13\n32\nE\n59\n29\n12\n21\nF\n21\n9\n2\n7\nG\n78\n33\n14\n30\nH\n57\n37\n17\n25\nAt each node mentioned in table 2, column 1, the percentage of the total number of days in a water flow season in the simulation period that the 50% daily flow for the plan scenario flow pattern stated for the water flow season in table 1 is equalled or exceeded, be at least the percentage stated in column 2 of the table for the water flow season.\nColumn 1\nColumn 2\nNode\nFeb–April water flow season\nMay–July water flow season\nAug–Nov water flow season\nDec-Jan water flow season\nA\n33\n32\n28\n33\nB\n16\n7\n36\n40\nC\n30\n26\n23\n30\nD\n46\n44\n36\n41\nE\n47\n47\n46\n47\nF\n42\n43\n30\n41\nG\n29\n28\n32\n31\nH\n46\n47\n43\n46\nAt each node mentioned in table 3, column 1, the 90% daily flow for the pre-development flow pattern for a water flow season is stated in column 2 of the table.\nColumn 1\nColumn 2\nNode\n90% daily flow in megalitres\nFeb–April water flow season\nMay–July water flow season\nAug–Nov water flow season\nDec-Jan water flow season\nA\n33\n41\n7\n5\nB\n7\n7\n1\n1\nC\n39\n20\n4\n6\nD\n13\n7\n2\n3\nE\n12\n9\n3\n3\nF\n2\n1\n0\n0\nG\n13\n10\n2\n2\nH\n11\n10\n0\n0\nAt each node mentioned in table 4, column 1, the percentage of the total number of days in a water flow season in the simulation period that the 90% daily flow for the plan scenario flow pattern stated for the water flow season in table 3 is equalled or exceeded, be at least the percentage stated in column 2 of the table for the water flow season.\nColumn 1\nColumn 2\nNode\nFeb–April water flow season\nMay–July water flow season\nAug–Nov water flow season\nDec-Jan water flow season\nA\n76\n69\n71\n74\nB\n79\n75\n58\n57\nC\n67\n59\n52\n63\nD\n79\n75\n57\n63\nE\n86\n88\n87\n84\nF\n78\n66\n41\n60\nG\n78\n75\n68\n74\nH\n85\n84\n79\n76\nAt each node mentioned in table 5, column 1, the percentage of the total number of days in the simulation period on which the daily flow is less than 1ML be between the minimum and maximum percentages stated for the node in column 2 of the table.\nColumn 1\nColumn 2\nNode\nMinimum-maximum percentage\nA\n2–13\nB\n6–30\nC\n2–11\nD\n3–24\nE\n1–7\nF\n15–36\nG\n3–14\nH\n6–18\nAt each node mentioned in table 6, column 1, minimise the extent to which—\nthe number of periods of no flow of at least 1 month but less than 3 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 2 of the table; and\nthe number of periods of no flow of at least 3 months but less than 6 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 3 of the table; and\nthe number of periods of no flow of at least 6 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 4 of the table.\nColumn 1\nColumn 2\nColumn 3\nColumn 4\nNode\nMinimum-maximum\nMinimum-maximum\nMinimum-maximum\nA\n0–9\n0–0\n0–0\nB\n3–90\n0–16\n0–5\nC\n0–4\n0–0\n0–0\nD\n2–64\n—\n—\nE\n0–0\n—\n—\nF\n7–85\n0–14\n0–2\nG\n1–21\n0–2\n0–0\nH\n5–40\n—\n—\n(sch.5-sec-ssec.1) At each node mentioned in table 1, column 1, the 50% daily flow for the pre-development flow pattern for a water flow season is stated in column 2 of the table. Column 1 Column 2 Node 50% daily flow in megalitres Feb–April water flow season May–July water flow season Aug–Nov water flow season Dec-Jan water flow season A 241 164 60 83 B 49 29 11 17 C 334 123 40 126 D 88 33 13 32 E 59 29 12 21 F 21 9 2 7 G 78 33 14 30 H 57 37 17 25\n(sch.5-sec-ssec.2) At each node mentioned in table 2, column 1, the percentage of the total number of days in a water flow season in the simulation period that the 50% daily flow for the plan scenario flow pattern stated for the water flow season in table 1 is equalled or exceeded, be at least the percentage stated in column 2 of the table for the water flow season. Column 1 Column 2 Node Feb–April water flow season May–July water flow season Aug–Nov water flow season Dec-Jan water flow season A 33 32 28 33 B 16 7 36 40 C 30 26 23 30 D 46 44 36 41 E 47 47 46 47 F 42 43 30 41 G 29 28 32 31 H 46 47 43 46\n(sch.5-sec-ssec.3) At each node mentioned in table 3, column 1, the 90% daily flow for the pre-development flow pattern for a water flow season is stated in column 2 of the table. Column 1 Column 2 Node 90% daily flow in megalitres Feb–April water flow season May–July water flow season Aug–Nov water flow season Dec-Jan water flow season A 33 41 7 5 B 7 7 1 1 C 39 20 4 6 D 13 7 2 3 E 12 9 3 3 F 2 1 0 0 G 13 10 2 2 H 11 10 0 0\n(sch.5-sec-ssec.4) At each node mentioned in table 4, column 1, the percentage of the total number of days in a water flow season in the simulation period that the 90% daily flow for the plan scenario flow pattern stated for the water flow season in table 3 is equalled or exceeded, be at least the percentage stated in column 2 of the table for the water flow season. Column 1 Column 2 Node Feb–April water flow season May–July water flow season Aug–Nov water flow season Dec-Jan water flow season A 76 69 71 74 B 79 75 58 57 C 67 59 52 63 D 79 75 57 63 E 86 88 87 84 F 78 66 41 60 G 78 75 68 74 H 85 84 79 76\n(sch.5-sec-ssec.5) At each node mentioned in table 5, column 1, the percentage of the total number of days in the simulation period on which the daily flow is less than 1ML be between the minimum and maximum percentages stated for the node in column 2 of the table. Column 1 Column 2 Node Minimum-maximum percentage A 2–13 B 6–30 C 2–11 D 3–24 E 1–7 F 15–36 G 3–14 H 6–18\n(sch.5-sec-ssec.6) At each node mentioned in table 6, column 1, minimise the extent to which— the number of periods of no flow of at least 1 month but less than 3 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 2 of the table; and the number of periods of no flow of at least 3 months but less than 6 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 3 of the table; and the number of periods of no flow of at least 6 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 4 of the table. Column 1 Column 2 Column 3 Column 4 Node Minimum-maximum Minimum-maximum Minimum-maximum A 0–9 0–0 0–0 B 3–90 0–16 0–5 C 0–4 0–0 0–0 D 2–64 — — E 0–0 — — F 7–85 0–14 0–2 G 1–21 0–2 0–0 H 5–40 — —\n- (a) the number of periods of no flow of at least 1 month but less than 3 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 2 of the table; and\n- (b) the number of periods of no flow of at least 3 months but less than 6 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 3 of the table; and\n- (c) the number of periods of no flow of at least 6 months in the simulation period is less than the minimum or more than the maximum number stated for the node in column 4 of the table.","sortOrder":79},{"sectionNumber":"sch.5-pt.2","sectionType":"part","heading":"Medium to high flow objectives","content":"# Medium to high flow objectives","sortOrder":80},{"sectionNumber":"sch.5-pt.3","sectionType":"part","heading":"Seasonal flow objectives","content":"# Seasonal flow objectives","sortOrder":81},{"sectionNumber":"sch.6-pt.1","sectionType":"part","heading":"Supplemented water","content":"# Supplemented water","sortOrder":82},{"sectionNumber":"sch.6-pt.2","sectionType":"part","heading":"Unsupplemented water","content":"# Unsupplemented water","sortOrder":83},{"sectionNumber":"sch.6-sec","sectionType":"section","heading":"Table 1","content":"### sch.6-sec Table 1\n\nFor water allocations, converted from authorisations that stated an area that may be irrigated, for taking unsupplemented water in a subcatchment area mentioned in table 1, column 1, the 70% unsupplemented water sharing index be at least the percentage stated for the subcatchment area in column 2 of the table.\nColumn 1\nColumn 2\nSubcatchment area\n70% unsupplemented water sharing index—percentage\n2\n85\n3\n85\n4\n86\n5\n81\n6\n78\n7\n65\n8\n79\nFor water allocations, converted from authorisations that did not state an area that may be irrigated, for taking unsupplemented water in a subcatchment area mentioned in table 2, column 1, the 70% unsupplemented water sharing index be at least the percentage stated, for the subcatchment area, in column 2 of the table.\nColumn 1\nColumn 2\nSubcatchment area\n70% unsupplemented water sharing index—percentage\n2\n94\n3\n95\n4\n95\n5\n95\n6\n95\n7\n90\n8\n95\n(sch.6-sec-ssec.1) For water allocations, converted from authorisations that stated an area that may be irrigated, for taking unsupplemented water in a subcatchment area mentioned in table 1, column 1, the 70% unsupplemented water sharing index be at least the percentage stated for the subcatchment area in column 2 of the table. Column 1 Column 2 Subcatchment area 70% unsupplemented water sharing index—percentage 2 85 3 85 4 86 5 81 6 78 7 65 8 79\n(sch.6-sec-ssec.2) For water allocations, converted from authorisations that did not state an area that may be irrigated, for taking unsupplemented water in a subcatchment area mentioned in table 2, column 1, the 70% unsupplemented water sharing index be at least the percentage stated, for the subcatchment area, in column 2 of the table. Column 1 Column 2 Subcatchment area 70% unsupplemented water sharing index—percentage 2 94 3 95 4 95 5 95 6 95 7 90 8 95","sortOrder":84}],"analysis":{"flash_summary":{"complexity_score":7,"scope_assessment":{"changed":false,"description":"The instrument itself defines a bounded geographic and subject scope—applying to the plan area and to water in watercourses, lakes and springs (secs 4, 8)—and imposes limits on increasing average take (sec.19). The text includes amendment and replacement triggers (secs 60–61) but contains no express provision indicating the plan’s scope was altered compared with its own baseline."},"complexity_factors":["Extensive numeric, node‑ and season‑specific flow and frequency targets set out in schedules (sch.5) and allocation indices (sch.6), increasing technical detail.","Mandatory use of hydrological simulation (IQQM) to assess consistency with objectives, with chief executive able to approve alternatives (sec.18).","Wide chief executive discretion across allocation, conversion and reserve decisions with many decision criteria to weigh (secs 19, 22–24, 35, 42–49).","Separate rules for supplemented vs unsupplemented water and conversion mechanics from existing authorisations to allocations (divs.4–6, secs 36–49).","Reserves and constrained grant volumes per subcatchment (sec.23, sch.7, sch.8) and strategic reserve limits tied to projects or regional plans (sec.24).","Cross‑references to resource operations plans, system operating plans and the SEQ regional plan create layered regulatory instruments (secs 22, 35, 59, 61).","Monitoring and reporting obligations for infrastructure operators and testable performance indicators (sec.54, sec.12, schs 5–6).","Implementation timeframes, priority areas and amendment pathways add procedural complexity (secs 58–61, 59).","Some sections omitted/amended in later instruments (multiple 'om' notes), which can complicate interpretation of the consolidated text."],"plain_english_summary":"This plan sets how water in the Gold Coast plan area (watercourses, lakes and springs) is allocated, converted and managed. It prescribes environmental‑flow and water‑security targets in schedules and numerical tables that guide allocation and operating rules (secs 4, 8, 13, schs 5–6).\n\nThe chief executive makes allocation, conversion and operating decisions and may approve modelling methods; water users face volumetric and rate limits and flow‑condition constraints and operators must meet monitoring and reporting requirements (secs 18, 19, 41–45, 47, 54, 59)."},"kimi_summary":{"content_quality":"ok","complexity_score":7,"scope_assessment":{"changed":true,"description":"The original 2006 plan appears to have been significantly streamlined through amendments in 2014 and 2016. Sections 25-33, 34, 39-40, 44, 50-51, 53, and 55-57 were all omitted (removed), suggesting a reduction in prescriptive detail and delegation of operational matters to the 'resource operations plan' rather than the primary legislation. The scope has shifted from detailed prescriptive rules to a framework approach where specifics are contained in subordinate instruments."},"complexity_factors":["Multiple nested conditional structures in sections 42-49 dealing with conversion of authorisations to water allocations, with different rules for irrigated vs non-irrigated authorisations","Extensive cross-referencing to schedules (11 schedules referenced including maps, tables of flow objectives, and volumetric limits) that are not fully reproduced in the provided text","Technical hydrological terminology throughout (e.g., '50% daily flow', '90% daily flow', '1.5 year daily flow volume', 'IQQM computer program', 'simulation period')","Dual regulatory frameworks operating simultaneously — the Water Plan itself plus the 'resource operations plan' and 'system operating plan' which contain detailed implementation rules","Multiple amendment histories shown (sections omitted in 2014, 2016) indicating layered legislative evolution","Specific mathematical performance indicators in Schedule 5 with seasonal variations across 8 monitoring nodes (A-H) and multiple flow thresholds","Differential treatment of 'supplemented' vs 'unsupplemented' water with distinct security objectives and conversion methodologies","Section 45 contains 4-tiered conditional logic for determining maximum pumping rates based on pump specifications and historical usage data"],"plain_english_summary":"This legislation is the **Water Plan (Gold Coast) 2006**, a Queensland law that manages how water is shared and protected across the Gold Coast region.\n\n**What it does:**\n- **Sets the rules for water use** in the Gold Coast area, covering rivers, lakes, and springs.\n- **Balances competing needs** — ensuring there's enough water for households, businesses, and farms while protecting the environment and recognising the cultural rights of Traditional Owners.\n- **Establishes \"water allocations\"** — formal rights that tell people how much water they can take, how fast they can take it, and under what conditions.\n- **Protects environmental flows** — making sure enough water stays in rivers to keep ecosystems healthy, fish moving, and water quality decent.\n- **Manages dams and infrastructure** — setting rules for how the Hinze Dam and other water infrastructure operate to minimise harm to nature.\n\n**Who it affects:**\n- **Residents and businesses** who rely on Gold Coast water supplies.\n- **Farmers and irrigators** who need water for crops and livestock.\n- **Traditional Owners** — the plan specifically recognises their cultural water use.\n- **Local councils and water utilities** managing the region's water infrastructure.\n- **Developers** seeking water for new projects.\n\n**Why it matters:**\nThe Gold Coast is one of Australia's fastest-growing regions with high environmental values (including Moreton Bay and the Broadwater). This plan tries to stop overall water use from increasing while the population grows — pushing for efficiency and alternative sources like recycled water. It also aims to reverse environmental damage where possible, particularly in sensitive areas like the Coomera River estuary and Tallebudgera Creek.\n\n**Key features:**\n- **No net increase** in average water extraction allowed.\n- **Two types of water**: \"supplemented\" (dam-controlled) and \"unsupplemented\" (direct from rivers).\n- **Strict caps** on how much can be taken from each subcatchment area.\n- **Conversion process** turning old water licences into modern water allocations.\n- **Monitoring requirements** to check if the plan is actually working."},"issue_detection":{"absurdities":[],"contradictions":[]},"summary":{"complexity_score":8,"scope_assessment":{"changed":true,"description":"The plan's original 2006 scope has been incrementally narrowed over time. Numerous sections (25–33, 34, 39–40, 44, 50–51, 53, 55–57) were repealed by 2014 amendments, removing what appear to have been provisions related to water entitlement details, priority groups, and water allocation groups. The ecological outcomes section was expanded in 2019 to reference the Environmental Protection (Water and Wetland Biodiversity) Policy 2019, broadening environmental protections beyond the original framework. The plan's administrative machinery has also been updated to reflect the creation of the SEQ water grid manager role and regional water security programs, reflecting the region's evolving water governance structure since 2006."},"complexity_factors":["Multiple interlocking regulatory frameworks — the plan operates alongside a Resource Operations Plan, System Operating Plan, SEQ Regional Plan, and the Water Act, requiring cross-referencing to fully understand obligations","Highly technical hydrological performance indicators using specialised terms like '50% daily flow', '90% daily flow', 'mean annual flow', '1.5 year daily flow volume', and 'annual proportional flow deviation'","Quantitative schedules with node-by-node and subcatchment-by-subcatchment flow targets expressed as megalitre volumes and percentage thresholds across four seasonal periods","Distinction between 'supplemented' water (from dams/reservoirs) and 'unsupplemented' water (taken directly from natural flows), each with different security objectives and allocation rules","Complex conversion process for legacy authorisations to modern water allocations, involving historical water use estimates, pump capacity assessments, and efficiency considerations","Reliance on the IQQM computer simulation model to assess compliance with objectives — a specialised tool inaccessible to ordinary users","Multiple categories of unallocated water (general reserve vs strategic reserve) with different eligibility criteria and processes","Several sections have been omitted (repealed) over time, creating gaps in numbering that make the document harder to navigate and understand as a whole","Interaction with other legislation including the State Development and Public Works Organisation Act 1971 and Environmental Protection (Water and Wetland Biodiversity) Policy 2019","Geographic complexity — the plan applies to named subcatchment areas, nodes, and specific named waterways, all requiring reference to maps and digital boundary data held separately by the department"],"plain_english_summary":"This plan is Queensland’s rulebook for managing water in Gold Coast rivers, creeks, lakes and springs. It determines who can take water, freezes overall extraction levels, converts old licences into tradeable allocations, and reserves supplies for future needs.\n\nIt affects farmers, developers, water utilities, environmental managers, Traditional Owners and residents — balancing water supply, cultural values and ecosystem health through rules, monitoring and reserved water."},"flash_summary_failed":{"failed":true,"reason":"Unauthenticated. Configure AI_GATEWAY_API_KEY or use a provider module. Learn more: https://ai-sdk.dev/unauthenticated-ai-gateway","source":"analysis-cron"}},"importantCases":[],"_links":{"self":"/api/acts/water-plan-gold-coast-2006","history":"/api/acts/water-plan-gold-coast-2006/history","analysis":"/api/acts/water-plan-gold-coast-2006/analysis","conflicts":"/api/acts/water-plan-gold-coast-2006/conflicts","importantCases":"/api/acts/water-plan-gold-coast-2006/important-cases","documents":"/api/acts/water-plan-gold-coast-2006/documents"}}