{"id":"wa-local:ashburton-shire-of-shire-of-ashburton-extractive-industries-repeal-local-law-2023","name":"Shire of Ashburton Extractive Industries Repeal Local Law 2023","slug":"shire-of-ashburton-extractive-industries-repeal-local-law-2023","collection":"local_law","jurisdiction":"wa","status":"in_force","isInForce":true,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":437046,"registerId":"wa-local:ashburton-shire-of-shire-of-ashburton-extractive-industries-repeal-local-law-2023-pdf-1775954078662","compilationNumber":null,"startDate":"2026-04-12","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"1","sectionType":"section","heading":"Shire of Ashburton Extractive Industries Repeal Local Law 2023","content":"1087\nISSN 2204-4264 (online)\nPERTH, TUESDAY, 16 MAY 2023 No. 57\nPUBLISHED BY AUTHORITY GEOFF O. LAWN, GOVERNMENT PRINTER\n© STATE OF WESTERN AUSTRALIA\nCONTENTS\nPART 1\nNil\n———\nPART 2\nPage\nFisheries ............................................................................................................................................. 1089\nLands .................................................................................................................................................. 1091\nLocal Government .............................................................................................................................. 1091\nPlanning ............................................................................................................................................. 1094\nPremier and Cabinet ......................................................................................................................... 1095\nPublic Notices..................................................................................................................................... 1095\n\nIMPORTANT COPYRIGHT NOTICE\n© State of Western Australia\nThis work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part\nmay be reproduced by any process without written permission from the Attorney General for\nWestern Australia. Enquiries in the first instance should be directed to the Government Printer,\nParliamentary Counsel’s Office, publications@pco.wa.gov.au.\nNote: A Creative Commons Attribution 4.0 International Licence (CC BY 4.0) applies with\nrespect to material on the WA Legislation Website (with certain exceptions), and to copies of Acts,\nand reprints of Acts and subsidiary legislation, printed by the Government Printer. To view\nrelevant information and for a link to a copy of the licence, visit www.legislation.wa.gov.au.\nPUBLISHING DETAILS\nThe Western Australian Government Gazette is published by the Government Printer for the State of\nWestern Australia on Tuesday and Friday of each week unless disrupted by Public Holidays or\nunforeseen circumstances.\nSpecial Government Gazettes containing notices of an urgent or particular nature are published\nperiodically.\nThe following guidelines should be followed to ensure publication in the Government Gazette—\n• Material submitted to the Executive Council prior to gazettal will require a copy of the signed\nExecutive Council Minute Paper.\n• Copy must be lodged with the Publications Officer, Department of the Premier and Cabinet no\nlater than 12 noon on Wednesday (Friday edition) or 12 noon on Friday (Tuesday edition)—\nEmail address:\ngazette@dpc.wa.gov.au\n• Enquiries regarding publication of notices can be directed to the Publications Officer on\n(08) 6552 6012.\n• Enquiries regarding payment of notices can be directed to (08) 6552 6000 or\nsales@dpc.wa.gov.au\n• Lengthy or complicated notices should be forwarded early to allow for preparation.\nFailure to observe this request could result in the notice being held over.\nAfter lodging any notices, confirmation is not required by post. If original copy is forwarded later and\npublished, the cost will be borne by the advertiser.\nADVERTISING RATES AND PAYMENTS\nEFFECTIVE FROM 1 JULY 2022 (Prices include GST)\nPublic Notices Section—$78.20 minimum charge (except items of an exceptionally large nature. In these\ninstances arrangements will be made for pricing the notice at time of lodging).\nAll other Notices—\nPer Column Centimetre—$15.60\nBulk Notices—$285.60 per page\nClients who have an account will only be invoiced for charges over $100.\nFor charges under $100, clients will need to supply credit card details at time of lodging notice\n(i.e. a notice under 7cm would not be invoiced).\nClients without an account will need to supply credit card details at the time of lodging the notice.\n\n16 May 2023 GOVERNMENT GAZETTE, WA 1089\n— PART 2 —\nFISHERIES\nFI401\nFISH RESOURCES MANAGEMENT ACT 1994\nPROHIBITION ON FISHING (WEST COAST DEMERSAL GILLNET AND DEMERSAL LONGLINE\nINTERIM MANAGED FISHERY) REVOCATION ORDER 2023\nOrder No. 3 of 2023\n[A4444]\nMade by the Minister under section 43.\n1. Citation\nThis order is the Prohibition on Fishing (West Coast Demersal Gillnet and Demersal Longline Interim\nManaged Fishery) Revocation Order 2023.\n2. Commencement\nThis amendment comes into operation as follows—\n(a) clauses 1 and 2—on the day on which the amendment is published in the Gazette;\n(b) the rest of the clauses—on the day after that day.\n3. Order revoked\nThe Prohibition on Fishing (West Coast Demersal Gillnet and Demersal Longline Interim Managed\nFishery) Order 2018 is revoked.\nDated 10th of May 2023.\nHon. DON PUNCH, MLA, Minister for Fisheries.\n———————————\nFI402\nFISH RESOURCES MANAGEMENT ACT 1994\nWEST COAST DEMERSAL GILLNET AND DEMERSAL LONGLINE INTERIM MANAGED FISHERY\nMANAGEMENT PLAN AMENDMENT 2023\n[A4444]\nMade by the Minister under section 54.\n1. Citation\nThis instrument is the West Coast Demersal Gillnet and Demersal Longline Interim Managed Fishery\nManagement Plan Amendment 2023.\n2. Management plan amended\nThe amendments in this instrument are to the West Coast Demersal Gillnet and Demersal Longline\nInterim Managed Fishery Management Plan 1997.\n3. Commencement\nThese amendments come into operation as follows—\n(a) clauses 1 and 2—on the day on which these amendments are published in the Gazette;\n(b) the rest of the clauses—on the day after that day.\n4. Clause 3 deleted\nDelete clause 3.\n5. Clause 26B inserted\nAfter clause 26A insert—\nAreas permanently closed to fishing by demersal gillnet\n26B. A person must not fish by means of demersal gillnet in the waters described in Schedule 9.\n\n1090 GOVERNMENT GAZETTE, WA 16 May 2023\n6. Clause 27 replaced\nDelete clause 27 and insert—\nOffences\n27. A person who contravenes a provision of clause 9, 10, 10A, 11, 12, 12A, 13, 17, 19B, 25, 25A,\n25B, 26, 26A or 26B commits an offence.\n7. Schedule 9 inserted\nAfter Schedule 8 insert—\nSchedule 9\nClosed waters (demersal gillnet)\nArea A\nAll Western Australian waters bounded by a line commencing at the intersection of 28° 27.244′\nsouth latitude and 113° 45.396′ east longitude; thence extending easterly along the geodesic to the\nintersection of 28° 27.099′ south latitude and 113° 53.401′ east longitude; thence extending south-\neasterly along the geodesic to the intersection of 28° 30.547′ south latitude and 114° 00.339′ east\nlongitude; thence extending south-easterly along the geodesic to the intersection of 28° 36.685′\nsouth latitude and 114° 04.362′ east longitude; thence extending south-easterly along the geodesic\nto the intersection of 28° 39.70′ south latitude and 114° 10.20′ east longitude; thence extending\nsouth-easterly along the geodesic to the intersection of 28° 44.534′ south latitude and 114° 14.933′\neast longitude; thence extending southerly along the geodesic to the intersection of 28° 52.435′\nsouth latitude and 114° 17.841′ east longitude; thence extending southerly along the geodesic to the\nintersection of 29° 00.884′ south latitude and 114° 16.459′ east longitude; thence extending south-\nwesterly along the geodesic to the intersection of 29° 07.847′ south latitude and 114° 10.998′ east\nlongitude; thence extending south-westerly along the geodesic to the intersection of 29° 11.899′\nsouth latitude and 114° 02.827′ east longitude; thence extending westerly along the geodesic to the\nintersection of 29° 12.404′ south latitude and 113° 53.127′ east longitude; thence extending westerly\nalong the geodesic to the intersection of 29° 09.384′ south latitude and 113° 44.732′ east longitude;\nthence extending north-westerly along the geodesic to the intersection of 29° 03.526′ south latitude\nand 113° 38.526′ east longitude; thence extending northerly along the geodesic to the intersection\nof 28° 55.646′ south latitude and 113° 35.675′ east longitude; thence extending northerly along the\ngeodesic to the intersection of 28° 47.393′ south latitude and 113° 37.013′ east longitude; thence\nextending north-westerly along the geodesic to the intersection of 28° 44.247′ south latitude and\n113° 35.293′ east longitude; thence extending northerly along the geodesic to the intersection of 28°\n37.202′ south latitude and 113° 34.893′ east longitude; thence extending north-easterly along the\ngeodesic to the intersection of 28° 30.956′ south latitude and 113° 38.607′ east longitude; thence\nextending north-easterly along the geodesic to the commencement point.\nArea B\nAll Western Australian waters bounded by a line commencing at the intersection of 29° 38.597′\nsouth latitude and 114° 58.409′ east longitude (on the mainland); thence extending westerly along\nthe geodesic to the intersection of 29° 37.398′ south latitude and 114° 51.235′ east longitude; thence\nextending westerly along the geodesic to the intersection of 29° 39.983′ south latitude and 114°\n44.352′ east longitude; thence extending south-westerly along the geodesic to the intersection of 29°\n45.504′ south latitude and 114° 40.302′ east longitude; thence extending southerly along the\ngeodesic to the intersection of 29° 52.074′ south latitude and 114° 40.517′ east longitude; thence\nextending south-easterly along the geodesic to the intersection of 29° 57.358′ south latitude and\n114° 44.885′ east longitude; thence extending south-easterly along the geodesic to the intersection\nof 29° 58.883′ south latitude and 114° 48.025′ east longitude; thence extending south-westerly along\nthe geodesic to the intersection of 30° 04.528′ south latitude and 114° 43.794′ east longitude; thence\nextending southerly along the geodesic to the intersection of 30° 11.166′ south latitude and 114°\n43.831′ east longitude; thence extending south-easterly along the geodesic to the intersection of 30°\n16.682′ south latitude and 114° 48.014′ east longitude; thence extending easterly along the geodesic\nto the intersection of 30° 19.348′ south latitude and 114° 55.17′ east longitude; thence extending\neasterly along the geodesic to the intersection of 30° 18.205′ south latitude and 115° 02.597′ east\nlongitude (on the mainland); thence generally northerly along the high water mark to the\ncommencement point.\nArea C\nAll Western Australian waters bounded by a line commencing at the intersection of 30° 30.347′\nsouth latitude and 115° 04.618′ east longitude (on the mainland); thence extending westerly along\nthe geodesic to the intersection of 30° 31.597′ south latitude and 115° 00.329′ east longitude; thence\nextending south-westerly along the geodesic to the intersection of 30° 35.709′ south latitude and\n114° 56.617′ east longitude; thence extending southerly along the geodesic to the intersection of 30°\n40.592′ south latitude and 114° 55.932′ east longitude; thence extending southerly along the\ngeodesic to the intersection of 30° 45.16′ south latitude and 114° 58.016′ east longitude; thence\nextending south-easterly along the geodesic to the intersection of 30° 48.101′ south latitude and\n115° 02.328′ east longitude; thence extending easterly along the geodesic to the intersection of 30°\n48.958′ south latitude and 115° 08.21′ east longitude; thence extending easterly along the geodesic\nto the intersection of 30° 47.759′ south latitude and 115° 11.979′ east longitude (on the mainland);\nthence generally northerly along the high water mark to the commencement point.\nDated 10th of May 2023.\nHon. DON PUNCH, MLA, Minister for Fisheries.\n\n16 May 2023 GOVERNMENT GAZETTE, WA 1091\nLANDS\nLA401\nTRANSFER OF LAND ACT 1893\nAPPLICATION O801703\nTake notice that Jocelyn Mary Barrie has made application to be registered under the Act as proprietor\nof an estate in fee simple in possession in the land situated at 14 Festing Street Albany in all of that\nland being Albany Building Lot 173 containing 2689 square metres being the whole of the Land\ncomprised in Memorial Book XXVII No. 644.\nAll Persons other than the applicant claiming any estate right title or interest in the above land and\ndesiring to object to the application are required to lodge with Landgate on or before 8 June 2023 a\ncaveat forbidding the land being brought under the operation of the Act.\nBRUCE ROBERTS, Registrar of Titles.\nLOCAL GOVERNMENT\nLG401\nLOCAL GOVERNMENT ACT 1995\nShire of Manjimup\nBASIS OF RATES\nI, Tim Fraser, being delegated by the Minister of the Crown to whom the administration of the Local\nGovernment Act 1995 is committed by the Governor, and acting pursuant to section 6.28 (1) of that Act,\nhereby, and with effect from 1 July 2023, determined that the method of valuation to be used by the\nShire of Manjimup as the basis for a rate in respect of the land referred to in the Schedule is to be the\ngross rental value of the land;\nSchedule\nDesignated Land\nUV to GRV All those portions of land being Lots 103 to 119 inclusive and Lot 121 as\nshown on Deposited Plan 419726 and Lots 123 to 127 inclusive as shown on\nDeposited Plan 419757.\nTIM FRASER, Executive Director Local Government,\nDepartment of Local Government, Sport and Cultural Industries.\n———————————\nLG402\nBUSH FIRES ACT 1954\nCity of Kalamunda\nFIRE HAZARD REDUCTION NOTICE 2023/2024\nFirst and Final Notice\nCompliance Due by: 1 November 2023\nImportant: The works outlined within must be completed by 1 November 2023 and maintained in this\nstate up to and including 31 March 2024.\nNotice to all owners and occupiers of land within the City of Kalamunda\nPursuant to Section 33 of the Bush Fires Act 1954 (WA), the City of Kalamunda (City) gives written\nnotice to act as specified in this notice to land that you own and/or occupy and with respect to any\nmatter which is upon the land that you own and/or occupy within the City. Failure or neglect to comply\nwith this notice is an offence and can result in a penalty of up to $5000. The City's Fire Hazard\nInspectors are authorised under the Bush Fires Act 1954 (WA) (Act) and have powers to enter land\npursuant to Section 14 of the Act. The City advises that its officers, servants, workmen, contractors,\nvehicles, machinery, and appliances (as the officers deem fit) may carry out the requisitions of this\nnotice that are not complied with by 1 November 2023, and any costs and expenses incurred may be\nrecovered from you as the owner and/or occupier of the land.\nFire Break—\nA strip of land free of all flammable and combustible material with the intention of preventing the\noutbreak of a bush fire and provides a visible safe access on the property for emergency vehicles and\nother firefighting operations. It is acceptable to install a firebreak around naturally occurring obstacles.\nFire breaks may be constructed by one or more of the following methods: ploughing, cultivating,\nscarifying, racking, chemical spraying, or another method as approved by an Authorised Officer.\n\n1092 GOVERNMENT GAZETTE, WA 16 May 2023\n• Clearance must be no less than 3-metres wide and 4-metres in height inside and along all\nboundaries (including boundaries adjacent to roads, rail and drain reserves and all public open\nspace reserves).\n• Must not be more than 4-metres wide (further width extensions may be considered upon\nwritten application for approval to the City). Maintained, reticulated living lawns are lawns\nconsidered to be kept completely green. Driveways may be acceptable in conjunction with, or\nin lieu of, fire breaks. Contact a City Fire Officer for further assistance.\n• Must have a corner turning radius of up to 10 metres.\n• Must be a continuous trafficable surface for a 4WD vehicle, be clear of any obstructions and\nmust not terminate in a cul-de-sac (dead end).\nFuel Load—\nCan be live and dead vegetation that accumulates over time. This Notice refers only to dead vegetation.\nFine fuels include = leaf litter, grasses, weeds, twigs (up to 6mm diameter), bark etc.\nHeavy (course) fuels include = branches, logs, stumps etc.\nA fuel load depth of 15mm (fine fuels) to the mineral earth is indicative of approximately 8 tonne per\nhectare. The more fuel load, the higher the flame height and increased fire intensity.\nMulch piles, stored firewood and burn piles can contribute to fuel loading on land and must be stored\nsafely away from assets, removed from the property, or actioned as directed by a Fire Officer.\nAdditional Works\nYou may be required to carry out further bushfire property preparedness works on your land to reduce\nany fire hazards considered necessary by a Fire Control Officer If required, these will be outlined in a\n'work order' and sent to the address of the owner and/or occupier.\nEmergency Management Plans and City Approved Treatment Plans\nAll properties and/or land subject to a Bushfire Management Plan, Emergency Management Plan, or\nan approved Bushfire Attack Level assessment (BAL), as a result of subdivision, development\napplication or a City approved treatment plan, must comply with the listed requirements in their\nentirety. Compliance with any additional plans does not constitute compliance with this Notice.\nEnvironmental and Heritage Conditions\nAny property subject to environmental and heritage value such as, but not limited to, Threatened\nEcological Communities (TEC), Bush Forever sites, Declared Rare Flora, and Fauna (DRF) sites and\nAboriginal Heritage sites, etc should seek further information about what can or cannot be done prior\nto carrying out requirements under this Notice.\nLow Threat Minimal Fuel Vegetation\nMinimal fuel condition means there is insufficient fuel available to significantly increase the severity\nof the bushfire attack. Low threat vegetation includes grassland managed in a minimal fuel condition,\nmaintained lawns, golf courses, maintained public reserves and parklands, vineyards, orchards,\ncultivated gardens, commercial nurseries, nature strips and windbreaks. Properties of these description\nwill still be assessed under this Notice and can apply for a variation.\nFire Management Requirements for all Land with a Total Area of 5000m2 or more\nFire Breaks\nFire Breaks are to be installed or upgraded to—\n• 3-metre-wide,\n• 4-metre-high clearance,\n• Continuous (no dead ends) and trafficable\n• As close to as possible directly inside the entire perimeter of the land.\nMaintained, reticulated living lawns that are kept completely green is acceptable in conjunction with,\nor in lieu of a fire break/s (see definition FIRE BREAK).\nDead Flammable Material (DFM)\nReduce and/or maintain all dead flammable material below 8 tonne per hectare (see definition FUEL\nLOAD).\nSlashing\n• If the land is an area above 5000m2 and less than 50,000m2 slash mow or trim unmanaged\ngrasses or dead grasses/weeds and dead shrubs and plants to a height of 50mm. This is\nadditional to Firebreak requirements.\n• If the land is an area of 50,000m2 (5 hectares) or greater the grass must be maintained on the\nland to a height no greater than 50mm for a distance of 10 meters from any firebreak.\nAsset Protection Zone (APZ)\nMaintain a fuel reduced zone around all buildings or assets which extends 20 metres from the outermost\npoint of the building or asset.\n• Gutters, roofs, and walls of all buildings to be free of flammable matter and maintained.\n• Fuel load within the 20-metre zone is reduced and maintained to no more than 2 tonne per\nhectare.\n\n16 May 2023 GOVERNMENT GAZETTE, WA 1093\n• Trees over 5 metres in height within the 20-metre zone to be under pruned up to 2 metres.\n• Trees or shrubs within 2 metres of the asset shall be pruned to a height no greater than 2\nmetres and/or pruned away from the asset to a distance no greater than 2 metres.\nFire Management Requirements for all Land with a Total Area less than 5000m2\nDead Flammable Material (DFM)\nReduce and/or maintain all dead flammable material below 8 tonne per hectare (see definition FUEL\nLOAD).\nSlashing\nSlash, mow, or trim unmanaged grasses or dead grasses/weeds, dead shrubs, and dead plants to a\nheight no greater than 50mm.\nClean Gutter Debris\nGutters, roofs, and walls of all buildings to be free of flammable matter and maintained.\nAsset Protection Zone (APZ)\nMaintain a fuel reduced zone around all buildings or assets which extends 20 metres from the outermost\npoint of the building or asset.\n• Gutters, roofs, and walls of all buildings to be free of flammable matter and maintained.\n• Fuel load within the 20-metre zone is reduced and maintained to no more than 2 tonne per\nhectare.\n• Trees over 5 metres in height within the 20-metre zone to be under pruned up to 2 metres.\n• Trees or shrubs within 2 metres of the asset shall be pruned to a height no greater than 2\nmetres and/or pruned away from the asset to a distance no greater than 2 metres.\nVariation to the Fire Hazard Reduction Notice\nIf you consider it impractical to meet a requirement/s of this Notice, you may apply to the City for a\nvariation no later than 1 October 2023.\nNote: A variation is not an exemption but an application to employ alternative methods of property\npreparedness to land that you own and/or occupy.\nAn administration fee of $150 applies for all applications received after 1 October 2023.\nIf your application is not granted you must comply with all requirements outlined in the Fire Hazard\nReduction Notice 2023/2024.\nVariation request application forms are available before 1 October 2023 on the City's website at:\nwww.kalamunda.wa.gov.au/fire\nIf you require any further information, please contact the City of Kalamunda Community Safety team\non (08) 9257 9999, email at enquiries@kalamunda.wa.gov.au or visit www.kalamunda.wa.gov.au/fire\nGARY TICEHURST, A/Chief Executive Officer.\n———————————\nLG403\nLOCAL GOVERNMENT ACT 1995\nShire of Ashburton\nEXTRACTIVE INDUSTRIES REPEAL LOCAL LAW 2023\nUnder the powers conferred by the Local Government Act 1995, and all other powers enabling it, the\nCouncil of the Shire of Ashburton resolved on 9 May 2023 to make the following local law.\n1. Citation\nThis local law is cited as the Shire of Ashburton Extractive Industries Repeal Local Law 2023.\n2. Commencement\nThis local law comes into operation 14 days after its publication in the Government Gazette.\n3. Extractive Industries Local Law repealed\nThe Shire of Ashburton Extractive Industries Local Law 2013 published in the Government Gazette on\n8 March 2013 is repealed.\nDated 11 May 2023.\nThe Common Seal of the Shire of Ashburton was affixed by authority of a resolution of the Council in\nthe presence of–\nK. WHITE, Shire President.\nK. DONOHOE, Chief Executive Officer.\n\n1094 GOVERNMENT GAZETTE, WA 16 May 2023\nPLANNING\nPL401\nPLANNING AND DEVELOPMENT ACT 2005\nNOTICE OF AMENDMENT TO INSTRUMENT OF DELEGATION—POWERS OF OFFICERS\nNotice of amendment to the Instrument of Delegation 2018/01 Delegation to officers of certain powers\nand functions of the Western Australian Planning Commission as gazetted on 3 October 2018 (and as\namended)(Government Gazette No.150).\nPreamble\nUnder section 16 of the Planning and Development Act 2005 (the Act) the Western Australian Planning\nCommission (the WAPC) may, by resolution published in the Government Gazette, delegate any\nfunction to a member, committee or officer of the WAPC or to a public authority or a member or officer\nof a public authority.\nIn accordance with section 16(4) of the Act, a reference in this instrument to a function or a power of\nthe WAPC includes and extends to, without limitation or restriction, any of the powers, privileges,\nauthorities, discretions, duties and responsibilities vested in or conferred upon the WAPC by the Act or\nany other written law as the case requires.\nResolution under s16 of the Act (delegation)\nOn 29 June 2022, pursuant to section 16 of the Act, the WAPC RESOLVED—\nA. TO AMEND the Instrument of Delegation 2018/01 Delegation to officers of certain powers and\nfunctions of the Western Australian Planning Commission as gazetted on 3 October 2018 (and\nas amended), as set out in Schedule 1 below.\nSAM FAGAN, Secretary, Western Australian Planning Commission.\n————\nSchedule 1\n1. Instrument of delegation amended\nThe amendments within this Schedule are to the Schedules set out in the Instrument of Delegation\n2018/01 Delegation to officers of certain powers and functions of the Western Australian Planning\nCommission as gazetted on 3 October 2018, and as consolidated on 16 December 2022.\n2. Amendment to Schedule 9—Miscellaneous powers\nThe following rows are inserted into Schedule 9 after item 9.26:\n9.27 Power to amend the manner and form\nby which any—\na. documents are provided to the WAPC;\nb. maps are prepared;\nc. submissions are made;\nd. notices are published; and\ne. reports are made;\nunder the Planning and Development Act\n2005.\n• Chairperson of the WAPC\n• Director General\nLimited to\namendments of an\nadministrative\nnature.\n———————————\nPL402\nPLANNING AND DEVELOPMENT ACT 2005\nAPPROVED LOCAL PLANNING SCHEME AMENDMENT\nShire of Boyup Brook\nLocal Planning Scheme No. 2—Amendment No. 23\nRef: TPS/2918\nIt is hereby notified for public information, in accordance with section 87 of the Planning and\nDevelopment Act 2005 that the Minister for Planning approved the Shire of Boyup Brook Local Planning\nScheme amendment on 2 May 2023 for the purpose of—\n1. Rezoning Lot 7876 Terry Road, Boyup Brook from the 'Rural' zone to the 'Rural Small Holdings'\nzone.\n2. Inserting 'and Lot 7876 Terry Road' into Schedule 3—Rural Small Holdings Zones after 'Road'\nfor Rural Small Holdings Zone 2 (RSH2).\n3. Amending the Scheme Map accordingly.\nG. AIRD, President.\nC. SMITH, Chief Executive Officer.\n\n16 May 2023 GOVERNMENT GAZETTE, WA 1095\nPREMIER AND CABINET\nPR401\nINTERPRETATION ACT 1984\nMINISTERIAL ACTING ARRANGEMENTS\nIt is hereby notified for public information that the Governor, in accordance with section 12(c) of the\nInterpretation Act 1984, has approved the following temporary appointments in the office of Minister\nfor Finance; Commerce; Women's Interests in the absence of the Hon S. M. Ellery MLC—\n• Hon S. N. Dawson MLC, for the period 1 to 3 July 2023 inclusive; and\n• Hon R. Saffioti MLA, for the period 4 to 22 July 2023 inclusive; and\n• Hon S. N. Dawson MLC, for the period 23 to 24 July 2023 inclusive.\nThis notice supersedes acting arrangements relating to the above office that were published in\nGovernment Gazette No. 23 of 24 February 2023.\nE. ROPER, Director General, Department of the Premier and Cabinet.\nPUBLIC NOTICES\nZZ401\nTRUSTEES ACT 1962\nDECEASED ESTATES\nNotice to Creditors and Claimants\nStanley Edward Willis, late of 59/44 Rome Road, Myaree, Western Australia, Company Director,\ndeceased.\nCreditors and other persons having claims (to which Section 63 of the Trustees Act 1962, relates) in\nrespect of the estate of the deceased who died on 29 December 2015 are required by the Executor Sandra\nAnn Wilton of care of Birman & Ride, Level 3, 16 Irwin Street, Perth WA 6000 to send particulars of\ntheir claims to her by the date being one month from the date of publication of this notice after which\ndate the executor may convey or distribute the assets having regard only to the claims of which she\nthen has notice.\n———————————\nZZ402\nTRUSTEES ACT 1962\nDECEASED ESTATES\nNotice to Creditors and Claimants\nJohn Stanley Willis, late of 11 Mallee Close, Jurien Bay, Western Australia, Business Owner, deceased.\nCreditors and other persons having claims (to which Section 63 of the Trustees Act 1962, relates) in\nrespect of the estate of the deceased who died on 20 June 2022 are required by the Administrator\nSandra Ann Wilton of care of Birman & Ride, Level 3, 16 Irwin Street, Perth WA 6000 to send\nparticulars of their claims to her by the date being one month from the date of publication of this notice\nafter which date the administrator may convey or distribute the assets having regard only to the claims\nof which she then has notice.\n———————————\nZZ403\nTRUSTEES ACT 1962\nDECEASED ESTATES\nNotice to Creditors and Claimants\nEstate of the late Desmond Joseph O'Hart (also known as Desmond Joseph Hart), 5 Jillara Court,\nLesmurdie, in the State of Western Australia, deceased.\nCreditors and other persons having claims (to which Section 63 of the Trustees Act 1962 relates) in\nrespect of the estate of the above-named deceased who died on 26 November 2022 are required to send\nparticulars of their claims to the Executors, care of RSM (see address below) within one (1) month of\nthe date of publication of this notice after which date the Executors may convey or distribute the assets\nhaving regard only to claims of which notice has been given.\nc/- ANDREW MARSHALL, RSM, GPO Box R1253, Perth WA 6844.\nTelephone: (08) 9261 9393.\nContact: Andrew Marshall.","sortOrder":0}],"analysis":{"flash_summary":{"complexity_score":3,"scope_assessment":{"changed":true,"description":"The instrument narrows the Shire's local law footprint by repealing the Shire of Ashburton Extractive Industries Local Law 2013 (Clause 3). It removes the existing local regulatory regime without providing replacement rules or transitional arrangements (Clauses 1–3), which shifts regulatory effect away from the repealed local law and may leave compliance and approvals to be addressed by the Shire or other applicable instruments."},"complexity_factors":["Single‑action repeal (Clause 3) — the instrument performs one clear legal change: repeal of the 2013 Extractive Industries Local Law.","Short, simple structure (Clauses 1–3) — minimal legislative drafting reduces internal complexity and interpretive nuance.","No transitional or replacement provisions included — absence of saving, transitional or replacement rules increases administrative uncertainty for operators and owners formerly regulated under the 2013 law (source: LG403, Clauses 1–3).","Commencement timing (Clause 2) — 14‑day delay before operation gives a short window for affected parties and the Shire to respond, but no staged implementation is provided.","Local decision‑making retained — instrument was made by the Shire council and signed under seal, so local authorities (Shire) remain the primary actor for any follow‑up regulation or enforcement (LG403 signature block).","Compliance and cost bearing — operators and landowners previously subject to the repealed local law may face changed compliance obligations or enforcement pathways and thus bear transition costs; the text itself does not allocate transitional cost recovery."],"plain_english_summary":"This instrument repeals the Shire of Ashburton Extractive Industries Local Law 2013 and comes into operation 14 days after publication. It removes the local rules that regulated quarrying and other extractive activities within the Shire.\n\nWho it affects: landowners and businesses carrying out extractive operations in the Shire, and the Shire’s regulatory officers. Why it matters: obligations, approval pathways and enforcement tied to the 2013 local law are eliminated, shifting compliance and decision‑making consequences back to the Shire and any other applicable laws."},"kimi_summary":{"content_quality":"ok","complexity_score":1,"scope_assessment":{"changed":false,"description":"This is a straightforward repeal local law with minimal scope. It does exactly what its title suggests: repeals the 2013 Extractive Industries Local Law. There is no expansion beyond the original intent — the intent was always to remove the previous regulatory framework, and it achieves precisely that without adding new regulatory burdens or extending into adjacent policy areas."},"complexity_factors":["Extremely short: only 3 operative clauses","No defined terms section","No cross-references to other legislation (except the enabling Local Government Act 1995 in the preamble)","Simple, unidirectional operation: repeal with no transitional provisions, exceptions, or conditions","No schedules, maps, or technical appendices attached to the local law itself"],"plain_english_summary":"The Shire of Ashburton has repealed its 2013 Extractive Industries Local Law, removing that layer of local regulation over mining, quarrying and similar extraction activities within the Shire.\n\nThis affects mining companies, landowners and the Shire, though state laws (e.g. the Mining Act 1978 and environmental rules) still apply; the repeal may simplify local compliance or reflect a change in regulatory approach."}},"importantCases":[],"_links":{"self":"/api/acts/shire-of-ashburton-extractive-industries-repeal-local-law-2023","history":"/api/acts/shire-of-ashburton-extractive-industries-repeal-local-law-2023/history","analysis":"/api/acts/shire-of-ashburton-extractive-industries-repeal-local-law-2023/analysis","conflicts":"/api/acts/shire-of-ashburton-extractive-industries-repeal-local-law-2023/conflicts","importantCases":"/api/acts/shire-of-ashburton-extractive-industries-repeal-local-law-2023/important-cases","documents":"/api/acts/shire-of-ashburton-extractive-industries-repeal-local-law-2023/documents"}}