{"id":"F2005B00605","name":"Licence Area Plan – Albury Radio","slug":"licence-area-plan-albury-radio","collection":"legislative_instrument","jurisdiction":"commonwealth","status":"in_force","isInForce":true,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":32059,"registerId":"commonwealth-F2005B00605-current","compilationNumber":null,"startDate":"2026-04-01","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"Endnotes","sectionType":"section","heading":"Endnotes","content":"#### Endnotes\n\nEndnote 1 – About the endnotes\n\nThe endnotes provide information about this compilation and the compiled law.\n\nEndnote 2 (Abbreviation key) sets out abbreviations that may be used in the endnotes.\n\nEndnote 3 (Legislation history) provides information about each law that has amended (or will amend) the compiled law. The information includes commencement details for amending laws and details of any application, saving or transitional provisions that are not included in this compilation.\n\nEndnote 4 (Amendment history) provides information about the amendments at the provision (generally section or equivalent) level and includes information about any provision of the compiled law that has been repealed in accordance with a provision of the law.\n\nIt also includes information about any misdescribed amendment (that is, an amendment that does not accurately describe the amendment to be made). If, despite the misdescription, the amendment can be given effect as intended, the amendment is incorporated into the compiled law and the abbreviation “(md)” added to the details of the amendment included in the amendment history. If a misdescribed amendment cannot be given effect as intended, the abbreviation “(md not incorp)” is added to the details of the amendment included in the amendment history.\n\nEndnote 2—Abbreviation key\n\n| ad = added or inserted                        |     |\n| --------------------------------------------- | --- |\n| am = amended                                  |     |\n| rep. = repealedrs. = repealed and substituted |     |\n\n  \n\nEndnote 3—Legislation history\n\n| Name                                                                                                     | Registration or notification in Gazette | Commencement      | Application, saving and transitional provisions |\n| -------------------------------------------------------------------------------------------------------- | --------------------------------------- | ----------------- | ----------------------------------------------- |\n| Licence Area Plan – Albury (Radio) – September 1997                                                      | 8 October 1997(see F2005B00605)         | 8 October 1997    |                                                 |\n| Licence Area Plan – Albury (Radio) – Variation No.1 of 2005                                              | 2 May 2005(see F2005L01021)             | 3 May 2005        |                                                 |\n| Variation to the Licence Area Plan for Albury Radio – No.1 of 2010                                       | 31 March 2010(see F2010L00757)          | 1 April 2010      |                                                 |\n| Broadcasting Services (Technical Planning) Guidelines (Consequential Amendments) Instrument 2017 (No. 1) | 29 September 2017(see F2017L01299)      | 30 September 2017 |                                                 |\n| Variation to Licence Area Plan – Albury Radio- 2021 (No.1)                                               | 22 November 2021(see F2021L01583)       | 23 November 2021  |                                                 |\n\n> Note: > Note: Endnote 4 - Table of Amendments\n\n| Provision affected        | How affected                                                            |\n| ------------------------- | ----------------------------------------------------------------------- |\n| Title page                | am. No. 1 of 2010, am. No.1 of 2021                                     |\n| Clause (1)                | am. No.1 of 2005, rs. No.1 of 2021                                      |\n| Clause (2)                | am. No.1 of 2005; am. No. 1 of 2010, am. No.1 of 2021                   |\n| Clause (3)                | am. No.1 of 2005, am. No.1 of 2021                                      |\n| Clause (4)                | am. No.1 of 2005, am. No.1 of 2021                                      |\n| Clause (5)                | am. No.1 of 2005, am. No.1 of 2021                                      |\n| Clause (6)                | am. No.1 of 2005, am. No.1 of 2021                                      |\n| Clause (7)                | am. No.1 of 2005, am. No.1 of 2021                                      |\n| Clause (8)                | am. No.1 of 2005, am. No.1 of 2021                                      |\n| Clause (9)                | ad. No.1 of 2005, rs. No.1 of 2021                                      |\n| Text following Clause (9) | rep. No.1 of 2021                                                       |\n| Schedule 1                | rs. No.1 of 2005, rs. No.1 of 2010, am. No.1 of 2021                    |\n| Schedule 2                | rs. No.1 of 2010, am. No.1 of 2021                                      |\n| Schedule 3                | rs. No.1 of 2005, rs. No.1 of 2010, am. No.1 of 2021                    |\n| Schedule 4                | rs. No.1 of 2010                                                        |\n| Schedule 5                | rs. No.1 of 2005, rs. No.1 of 2010, rs. No.1 of 2021                    |\n| Attachment 1.1            | rs. No.1 of 2005, rs. No.1 of 2010, am. No.1 of 2021                    |\n| Attachment 1.2            | rs. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 1.3            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.4            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.5            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.6            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.7            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.8            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.9            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.10           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.11           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.12           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.13           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.14           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.15           | rs. No 1 of 2005, rep. No.1 of 2010                                     |\n| Attachment 1.16           | rs. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 1.17           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.18           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.19           | rs. No.1 of 2005, rep. No.1 of 2010                                     |\n| Attachment 1.20           | rs. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 1.21           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.22           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.23           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.24           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.25           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.26           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.27           | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 1.28           | ad. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 1.29           | ad. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 1.30           | ad. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 2.1            | rs. No.1 of 2005, rs. No.1 of 2010, am. No.1 of 2021                    |\n| Attachment 2.2            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 2.3            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 2.4            | ad. No.1 of 2021                                                        |\n| Attachment 2.5            | ad. No.1 of 2021                                                        |\n| Attachment 3.1            | rs. No.1 of 2005, rs. No.1 of 2010, rs. No.1 of 2021                    |\n| Attachment 3.2            | rs. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 3.3            | ad. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 3.4            | ad. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021 |\n| Attachment 3.5            | ad. No.1 of 2005, rs. No.1 of 2010, am. No.1 of 2021                    |\n| Attachment 3.6            | ad. No.1 of 2021                                                        |\n| Attachment 4.1            | rs. No.1 of 2005, rs. No.1 of 2010, am. No.1 of 2021                    |\n| Attachment 4.2            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 4.3            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 4.4            | rs. No.1 of 2010, am. No. 1 of 2017, am. No.1 of 2021                   |\n| Attachment 5.1            | rs. No.1 of 2005, rs. No.1 of 2010, rs. No.1 of 2021                    |\n| Attachment 5.2            | rs. No.1 of 2005, rs. No.1 of 2010, am. No. 1 of 2017, rs. No.1 of 2021 |","sortOrder":0}],"analysis":{"flash_summary":{"complexity_score":6,"scope_assessment":{"changed":false,"description":"The endnotes show the plan has been updated repeatedly with new attachments, replacements and technical consequential amendments, but those changes refine technical details and maps rather than expanding the instrument’s fundamental purpose. The core scope—defining the Albury radio licence area and its technical planning parameters—remains the same. The 2017 consequential amendments link the plan to updated technical guidelines, and the 2021 variations reorganised and updated many attachments, but the instrument did not grow materially beyond its original function of specifying licence area and technical requirements."},"complexity_factors":["Many attachments (over 30 numbered attachments referenced) and multiple schedules (Schedules 1–5) referenced in the amendment table","Multiple amendment instruments across four separate years (2005, 2010, 2017, 2021) creating successive replacements and additions","Frequent replacements (rs.), amendments (am.) and additions (ad.) of attachments — some attachments repealed and others reinserted","Cross-reference to external technical guidance (Broadcasting Services (Technical Planning) Guidelines consequential amendments 2017)","Table-of-amendments style endnotes rather than a single consolidated text increases need to cross-check historic and current versions","Replacements of both substantive attachments and the text following clauses (e.g. text following Clause (9) repealed in 2021) which introduces conditional content-change points"],"plain_english_summary":"This is the compiled Licence Area Plan for Albury radio: a technical and geographic specification of the licence area, with maps, site details and planning parameters used for frequency coordination and interference protection. It binds current and prospective Albury broadcasters, broadcast engineers and the ACMA, who apply and enforce its limits.\n\nIt matters because it creates predictable coverage and protection for services while imposing ongoing compliance and planning costs on licensees; periodic variations mean engineers and regulators must keep schedules and attachments up to date."},"kimi_summary":{"content_quality":"ok","complexity_score":3,"scope_assessment":{"changed":false,"description":"This is an endnotes/compilation metadata document, not the substantive legislation itself. It accurately reflects its intended purpose as a legislative history tracker."},"complexity_factors":["Document is purely administrative/metadata—no substantive legal rules present","Heavy use of abbreviations requiring cross-reference to abbreviation key (ad, am, rep., rs., md)","Dense tabular format with 50+ rows tracking amendments across 24 years","Requires understanding of Federal Register of Legislation citation system (F2005B00605, F2017L01299, etc.)","Multiple nested document structures referenced (Clauses, Schedules, Attachments with decimal numbering like 1.1, 1.2)","Implicit dependency on the actual Licence Area Plan content which is not included in this excerpt"],"plain_english_summary":"This document is the **endnotes section** of a Licence Area Plan for radio broadcasting in Albury, New South Wales. It doesn't contain the actual rules about radio broadcasting—instead, it's essentially a **change log** that tracks how the main Licence Area Plan has been modified over time.\n\n**What it shows:**\n- **When the plan started:** The original plan took effect on 8 October 1997\n- **What changed and when:** Five separate updates (called \"variations\") were made in 2005, 2010, 2017, and 2021\n- **Which parts were affected:** The document lists which clauses, schedules, and attachments were added, amended, or repealed (removed) in each update\n\n**Who cares about this:**\n- **Radio broadcasters** in Albury who need to know which version of the rules applies to them\n- **Lawyers or regulators** checking the history of a specific technical requirement\n- **Anyone appealing a broadcasting decision** who needs to prove what the rules were at a specific date\n\n**Why it matters:** Broadcasting in Australia is heavily regulated. These Licence Area Plans determine technical details like transmission power, frequency allocations, and coverage areas. If a radio station breaches these technical limits, they can lose their licence. This endnotes section helps figure out exactly which version of the rules was in force at any given time."},"flash_summary_failed":{"failed":true,"reason":"A positive credit balance is required for all requests, including BYOK, so fallback providers remain available. Add credits at https://vercel.com/d?to=%2F%5Bteam%5D%2F%7E%2Fai%3Fmodal%3Dtop-up to continue.","source":"analysis-cron"}},"importantCases":[],"_links":{"self":"/api/acts/licence-area-plan-albury-radio","history":"/api/acts/licence-area-plan-albury-radio/history","analysis":"/api/acts/licence-area-plan-albury-radio/analysis","conflicts":"/api/acts/licence-area-plan-albury-radio/conflicts","importantCases":"/api/acts/licence-area-plan-albury-radio/important-cases","documents":"/api/acts/licence-area-plan-albury-radio/documents"}}