{"id":"F2023L00153","name":"Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 2 GHz Band) 2023","slug":"f2023l00153","collection":"legislative_instrument","jurisdiction":"commonwealth","status":"in_force","isInForce":true,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":329998,"registerId":"commonwealth-F2023L00153-current","compilationNumber":null,"startDate":"2026-04-08","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"1","sectionType":"section","heading":"Name","content":"#### 1 Name\n\n  These are the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 2 GHz Band) 2023.","sortOrder":0},{"sectionNumber":"2","sectionType":"section","heading":"Commencement","content":"#### 2 Commencement\n\n  This instrument commences at the start of the day after the day it is registered on the Federal Register of Legislation.\n\n> Note: The Federal Register of Legislation may be accessed free of charge at [www.legislation.gov.au](http://www.legislation.gov.au).","sortOrder":1},{"sectionNumber":"3","sectionType":"section","heading":"Authority","content":"#### 3 Authority\n\n  This instrument is made under section 262 of the Act.","sortOrder":2},{"sectionNumber":"4","sectionType":"section","heading":"Repeal of the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers — 2 GHz Band) 2016","content":"#### 4 Repeal of the Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 2 GHz Band) 2016\n\n  The Radiocommunications Advisory Guidelines (Managing Interference to Spectrum Licensed Receivers – 2 GHz Band) 2016 \\[F2016L01711\\] are repealed.","sortOrder":3},{"sectionNumber":"5","sectionType":"section","heading":"Definitions","content":"#### 5 Definitions\n\n  (1) In this instrument:\n\n> 2 GHz band means the 2 GHz lower band and the 2 GHz upper band.\n\n> 2 GHz lower band means the frequency band 1920 MHz to 1980 MHz.\n\n> 2 GHz receiver means a radiocommunications receiver operated under a 2 GHz spectrum licence.\n\n> 2 GHz spectrum licence means a spectrum licence that authorises the operation of radiocommunications devices in the 2 GHz band.\n\n> 2 GHz upper band means the frequency band 2110 MHz to 2170 MHz.\n\n> Act means the Radiocommunications Act 1992.\n\n> adjacent channel, in relation to another channel (the occupied channel), means a channel with a centre frequency offset on either side of the assigned channel frequency of the occupied channel by a specific frequency relation.\n\n> adjacent channel selectivity: see item 2 of Schedule 1.\n\n> centre frequency, in relation to a radiocommunications transmitter, means the frequency midway between the lower and upper frequency limits of the transmitter’s occupied bandwidth.\n\n> compatibility requirement: see Part 5 and Schedule 2.\n\n> device boundary criterion has the meaning given by:\n\n    (a) the section 145 determination; or\n    (b) if another instrument replaces that determination – the other instrument.\n\n> emission buffer zone, in relation to a spectrum licence, means a zone along the frequency or geographic boundary specified in a spectrum licence where emission levels of radiocommunications transmitters are reduced to ensure that significant levels of emissions stay within the geographic areas and frequencies of the licence.\n\n> fixed receiver means a radiocommunications receiver:\n\n    (a) located at a fixed point on land or sea; and\n    (b) not designed or intended for use while in motion.\n\n> fixed transmitter means a radiocommunications transmitter:\n\n    (a) located at a fixed point on land or sea; and\n    (b) not designed or intended for use while in motion.\n\n> frequency adjacent spectrum licence, in relation to a spectrum licence (the first licence), means a spectrum licence that authorises the operation of radiocommunications devices in a part of the spectrum that is adjacent to the parts of the spectrum specified in a core condition of the first licence.\n\n> geographic area, for a spectrum licence, means the area within which operation of a radiocommunications device is authorised under the licence.\n\n> in-band means:\n\n    (a) for a radiocommunications device operated under a spectrum licence – the part of the spectrum within which the operation of radiocommunications devices is authorised under the licence; or\n    (b) for a radiocommunications device operated under an apparatus licence that specifies a frequency band – the frequencies within the lower frequency limit and the upper frequency limit specified in the licence; or\n    (c) for a radiocommunications device operated under an apparatus licence that specifies a specific frequency and bandwidth – the frequencies within that bandwidth, when centred on the specific frequency.\n\n> intermodulation response rejection: see item 3 of Schedule 1.\n\n> mobile device means a radiocommunications device that is used:\n\n    (a) while it is in motion on land, on water or in the air; or\n    (b) in a stationary position at unspecified points on land, on water or in the air.\n\n> notional receiver performance level: see subsection 12(2) and item 1 of Schedule 1.\n\n> out-of-band, for a radiocommunications device, means a frequency other than an in-band frequency.\n\n> receiver blocking, in relation to a radiocommunications receiver, means the measure of the ability of the receiver to receive a wanted signal in the presence of a high level unwanted interferer on frequencies other than those of an adjacent channel.\n\n> section 145 determination means the Radiocommunications (Unacceptable Levels of Interference – 2 GHz Band) Determination 2023.\n\n> Note: The section 145 determination is available, free of charge, from the Federal Register of Legislation at [www.legislation.gov.au](http://www.legislation.gov.au).\n\n> spectrum space means the three dimensional space consisting of a frequency band and a geographic area.\n\n> unwanted signal means a radio emission from a radiocommunications transmitter that is not a wanted signal.\n\n> wanted signal means a radio emission from a radiocommunications transmitter that is intended for reception by a radiocommunications receiver protected by this instrument.\n\n> Note: A number of other expressions used in this instrument are defined in the Act, including the following:\n\n    (a) ACMA;\n    (b) apparatus licence;\n    (c) class licence;\n    (d) core condition;\n    (e) frequency band;\n    (f) interference;\n    (g) radiocommunications device;\n    (h) radiocommunications receiver;\n    (i) radiocommunications transmitter;\n    (j) radio emission;\n    (k) Register;\n    (l) spectrum licence;\n    (m) transmitter licence.\n  (2) In this instrument, unless otherwise specified, a reference to a part of the spectrum or a frequency band includes all frequencies that are greater than but not including the lower frequency, up to and including the higher frequency.\n\n> Note: This subsection means the lower number in a part of the spectrum or a frequency band is not included in the part of the spectrum or the frequency band.","sortOrder":4},{"sectionNumber":"6","sectionType":"section","heading":"References to other instruments","content":"#### 6 References to other instruments\n\n  In this instrument, unless the contrary intention appears:\n    (a) a reference to any other legislative instrument is a reference to that other legislative instrument as in force from time to time; and\n    (b) a reference to any other kind of instrument or writing is a reference to that other instrument or writing as in force or existence from time to time.\n\n> Note 1: For references to Commonwealth Acts, see section 10 of the Acts Interpretation Act 1901; and see also subsection 13(1) of the Legislation Act 2003 for the application of the Acts Interpretation Act 1901 to legislative instruments.\n\n> Note 2: All Commonwealth Acts and legislative instruments are registered on the Federal Register of Legislation.\n\n> Note 3: See section 314A of the Act.","sortOrder":5},{"sectionNumber":"7","sectionType":"section","heading":"Background","content":"#### 7 Background\n\n  (1) A spectrum licence authorises the operation of radiocommunications devices within a part of the spectrum and in a geographic area. Interference occurring between adjacent spectrum licences consists of in-band interference across the geographic boundaries, and out-of-band interference across the frequency boundaries.\n  (2) This interference is managed by creating emission buffer zones along the geographic and frequency boundaries of a spectrum licence, using a number of powers under the Act. Emission buffer zones may be created by, or as a result of, the following:\n    (a) specifying out-of-area and out-of-band emission limits in the core conditions of the licence, which must be included in all spectrum licences (see section 66 of the Act);\n    (b) a determination under section 145 of the Act, relating to unacceptable levels of interference and the registration of radiocommunications devices, and related licence conditions (see section 69 of the Act);\n    (c) advisory guidelines under section 262 of the Act, about managing interference in specific circumstances.\n  (3) This instrument:\n    (a) provides protection to 2 GHz receivers from interference caused by:\n    (i) radiocommunications transmitters operated under a class licence; or\n    (ii) radiocommunications transmitters operated under a transmitter licence first issued under section 100 of the Act on or after 12 October 2017; or\n    (iii) radiocommunications transmitters operated under a 2 GHz spectrum licence that were included in the Register on or after 12 October 2017; and\n    (b) assists in the management of in-band and out-of-band interference by providing compatibility requirements for fixed receivers included in the Register that are operated under 2 GHz spectrum licences; and\n    (c) sets out minimum receiver performance requirements that the ACMA will assume are met by a radiocommunications receiver, when considering whether to provide protection to the receiver in accordance with this instrument, so that the onus of managing interference is not solely placed upon the operators of radiocommunications transmitters.\n  (4) This instrument is intended to provide guidance on the management and settlement of interference to 2 GHz receivers, caused by radiocommunications transmitters operated under another class, apparatus or spectrum licence issued under the Act.\n  (5) This instrument should be used by spectrum licensees, apparatus licensees, and authorised third parties in the planning of services and in the resolution of interference.\n  (6) This instrument does not prevent a person negotiating and implementing other protection requirements with other persons.","sortOrder":6},{"sectionNumber":"8","sectionType":"section","heading":"In-band interference","content":"#### 8 In-band interference\n\n  (1) In-band interference to a 2 GHz receiver, caused by a radiocommunications transmitter operated under an adjacent spectrum licence, is managed by the core conditions imposed on spectrum licences under section 66 of the Act and the device boundary criterion.\n  (2) The ACMA does not intend to afford protection from in-band interference to a 2 GHz receiver caused by a radiocommunications transmitter operated under an apparatus licence that was first issued under section 100 of the Act before 12 October 2017.\n  (3) In-band interference to a 2 GHz receiver, caused by a radiocommunications transmitter operated under an apparatus licence that was first issued under section 100 of the Act on or after 12 October 2017, is managed as if the transmitter were operated under a spectrum licence. The device boundary criterion should be applied to such radiocommunications transmitters, affording 2 GHz receivers the same level of in-band protection from apparatus licensed radiocommunications transmitters as they are afforded from radiocommunications transmitters operated under adjacent area spectrum licences.\n  (4) Application of the device boundary criterion manages in-band interference. The device boundary criterion incorporates emission limits that provide reasonable protection within the geographic area of a spectrum licence. Emission limits are also used to manage out-of-band interference, but these do not provide protection along the frequency boundaries of a spectrum licence. Because of the nature of out-of-band interference, emission limits cannot be used to provide protection from out-of-band interference for radiocommunications devices that are located near each other.\n\n> Note: Example: Radiocommunications devices that are located near each other include devices located at multi-operator sites.\n\n  (5) The ACMA does not intend to act in relation to in-band interference to a 2 GHz receiver caused by a radiocommunications transmitter operated under a class licence where the operation complies with all relevant conditions of the class licence.","sortOrder":7},{"sectionNumber":"9","sectionType":"section","heading":"Out-of-band interference","content":"#### 9 Out-of-band interference\n\n  (1) Out-of-band interference is difficult to predict, because the levels and frequencies of unwanted emissions depend on both the nearness and the operating frequencies of radiocommunications transmitters and radiocommunications receivers that are spectrally or geographically close. In addition, out-of-band interference:\n    (a) can extend for many MHz either side of the frequency boundary of a spectrum licence; and\n    (b) is dependent on the quality of the radiocommunications receiver as well as the levels of the radiocommunications transmitter’s emissions; and\n    (c) is difficult to model accurately.\n  (2) Emission limits are also used to manage out-of-band interference, but these do not provide protection along the frequency boundaries of a spectrum licence throughout the entire geographic area. Because of the nature of out-of-band interference, emission limits cannot be used to provide protection from out-of-band interference for radiocommunications devices that are located near each other.\n\n> Note: Example: Radiocommunications devices that are located near each other include devices located at multi-operator sites.\n\n  (3) Emission limits are not the sole mechanism used to manage out-of-band interference for radiocommunications devices in close proximity, because the interference modelling inaccuracy would require large probability margins to be added to those limits. Large probability margins would place severe constraints on the use of the spectrum because the upper and lower frequency limits of a spectrum licence extend throughout the geographic area. Emission limits to manage out-of-band interference throughout the geographic area cannot be used, because they would lead to a severe loss of utility of the spectrum on both sides of the frequency limits.\n  (4) To avoid large probability margins, out-of-band interference is managed through interference management procedures based on a compatibility requirement for radiocommunications receivers. A minimum level of receiver performance is specified in Part 4 in conjunction with the compatibility requirement because the performance level of receivers:\n    (a) affects the level of interference; and\n    (b) can vary for receivers operating under spectrum licences.\n\n> Note: The minimum level of receiver performance is specified in Part 4. The compatibility requirement is set out in Part 5.","sortOrder":8},{"sectionNumber":"10","sectionType":"section","heading":"Recording radiocommunications receiver details in the Register","content":"#### 10 Recording radiocommunications receiver details in the Register\n\n  (1) In this instrument, for a 2 GHz receiver to be afforded protection from interference caused by an apparatus licensed radiocommunications transmitter, the details of the receiver must have been included in the Register before the relevant apparatus licence was first issued under section 100 of the Act.\n  (2) In this instrument, for a 2 GHz receiver to be afforded protection from interference caused by a spectrum licensed radiocommunications transmitter, the details of the receiver must have been included in the Register before the details of the relevant transmitter were included in the Register.\n\n> Note: See also Part 5.","sortOrder":9},{"sectionNumber":"11","sectionType":"section","heading":"Mobile devices","content":"#### 11 Mobile devices\n\n  The compatibility requirement specified in Part 5 does not apply to radiocommunications receivers that are mobile devices operated under a 2 GHz spectrum licence because the transient nature of these receivers prevents the use of this requirement as an interference management procedure.","sortOrder":10},{"sectionNumber":"12","sectionType":"section","heading":"Notional receiver performance level","content":"#### 12 Notional receiver performance level\n\n  (1) The level of interference caused by unwanted emissions depends on the interference susceptibility of a radiocommunications receiver and the level of the unwanted signal. Emission levels from radiocommunications transmitters should not have to be reduced below a point where the performance of the radiocommunications receiver is the main cause of the problem.\n  (2) A notional receiver performance level is set out in Schedule 1 and is to be used when setting a compatibility requirement for a radiocommunications receiver. A radiocommunications receiver should meet the notional receiver performance level to gain protection from interference from a radiocommunications transmitter specified in this instrument.","sortOrder":11},{"sectionNumber":"13","sectionType":"section","heading":"Compatibility","content":"#### 13 Compatibility\n\n  (1) In relation to a fixed receiver specified in subsection (2), the licensee of a fixed transmitter operated under an apparatus licence or a spectrum licence must ensure that the transmitter meets the compatibility requirement in Schedule 2.\n  (2) For the purposes of subsection (1), a fixed receiver is specified if the receiver:\n    (a) is operated under a spectrum licence; and\n    (b) has at least the notional receiver performance level; and\n    (c) was included in the Register before:\n    (i) if the fixed transmitter mentioned in subsection (1) is operated under a spectrum licence – the fixed transmitter was included in the Register; or\n    (ii) if the fixed transmitter mentioned in subsection (1) is operated under an apparatus licence – the apparatus licence was issued.\n  (3) A radiocommunications transmitter operated under a class licence must comply with the conditions of the class licence.","sortOrder":12}],"analysis":{"flash_summary":{"complexity_score":7,"scope_assessment":{"changed":true,"description":"Yes. The instrument repeals the 2016 guidelines (s 4) and replaces them with tighter, more explicit technical and administrative rules: it defines a notional receiver performance level (s 12 and Schedule 1), sets a numerical compatibility requirement (Schedule 2: −108 dBm/5 MHz at the receiver antenna port), and limits protection to fixed receivers recorded in the Register before the relevant transmitter or apparatus licence (ss 10 and 13). It also applies the device boundary criterion to apparatus licences first issued on or after 12 October 2017 (s 8(2)–(3))."},"complexity_factors":["Cross-references to the Radiocommunications Act 1992 and a separate section 145 determination (multiple external instruments referenced).","Technical performance parameters drawn from 3GPP standards (adjacent channel selectivity, intermodulation rejection, blocking) requiring engineering assessment.","Interaction between different licence types (spectrum, apparatus, class licences) and date-based applicability (e.g. apparatus licences first issued on or after 12 October 2017).","Registration timing rules that condition who receives protection (ss 10 and 13).","Use of both geographic (emission buffer zones, device boundary criterion) and spectral measures, creating multi-dimensional coordination requirements.","Measurement and testing points specified at the antenna connector port and bandwidth scaling rules (testing and verification complexity).","Discretion and enforcement by ACMA in applying protections and coordination in practice (implicit operational complexity)."],"plain_english_summary":"This instrument replaces the 2016 guidelines and sets technical rules for managing interference to spectrum‑licensed receivers in the 2 GHz band. It specifies a notional receiver performance level, a compatibility requirement (unwanted‑signal limit of −108 dBm/5 MHz), and uses emission buffer zones and a device‑boundary criterion to control transmitter emissions.\n\nIt applies to 2 GHz spectrum and apparatus licensees, class‑licensed transmitters and fixed receivers registered in the ACMA Register. Transmitters bear costs to meet limits or coordinate; receivers must meet minimum performance and be registered to receive protection."},"kimi_summary":{"content_quality":"ok","complexity_score":6,"scope_assessment":{"changed":false,"description":"This instrument appears to be a straightforward reissue/update of the 2016 guidelines, maintaining the same scope of managing interference to 2 GHz spectrum licensed receivers. The structure and purpose remain consistent with the original intent — providing technical guidance on interference management in this specific frequency band. The repeal of the 2016 instrument and replacement with this 2023 version suggests a routine update rather than scope expansion."},"complexity_factors":["27 defined terms in section 5, many cross-referencing technical standards and other legislative instruments","Multiple conditional date thresholds (12 October 2017) creating different rules for pre-existing vs new licences","Complex cross-referencing structure: refers to 'the Act' (Radiocommunications Act 1992), 'the section 145 determination', and 3GPP technical standards (TS 38.104)","Nested conditional logic in section 13(2) specifying when the compatibility requirement applies, involving: licence type, receiver performance level, and registration timing","Technical tables with frequency offsets, bandwidth thresholds, and decibel measurements requiring engineering knowledge to interpret","Dual-band structure (2 GHz lower band 1920-1980 MHz and upper band 2110-2170 MHz) with slightly different technical parameters","Distinction between 'in-band' and 'out-of-band' interference with different management mechanisms for each"],"plain_english_summary":"This instrument updates rules for managing interference in the 2 GHz mobile/data band, protecting receivers operated under spectrum licences by setting minimum receiver performance standards and transmitter compatibility limits. It affects spectrum licence holders, apparatus/class‑licence transmitter operators, and the ACMA, and establishes a first‑in, best‑dressed registration regime (excluding mobile handsets). It matters because it clarifies who must control emissions and who must use robust receivers so 4G/5G services can coexist."},"flash_summary_failed":{"failed":true,"reason":"A positive credit balance is required for all requests, including BYOK, so fallback providers remain available. Add credits at https://vercel.com/d?to=%2F%5Bteam%5D%2F%7E%2Fai%3Fmodal%3Dtop-up to continue.","source":"analysis-cron"}},"importantCases":[],"_links":{"self":"/api/acts/f2023l00153","history":"/api/acts/f2023l00153/history","analysis":"/api/acts/f2023l00153/analysis","conflicts":"/api/acts/f2023l00153/conflicts","importantCases":"/api/acts/f2023l00153/important-cases","documents":"/api/acts/f2023l00153/documents"}}