{"id":"F2015L01839","name":"Carbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015","slug":"carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina","collection":"legislative_instrument","jurisdiction":"commonwealth","status":"repealed","isInForce":false,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":93618,"registerId":"commonwealth-F2015L01839-current","compilationNumber":null,"startDate":"2026-04-02","status":"Repealed","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"1","sectionType":"section","heading":"Carbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015","content":"![](image.001.jpeg)\n\nCarbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015\n\nmade under the\n\nCarbon Credits (Carbon Farming Initiative) Act 2011\n\nCompilation No. 1\n\nCompilation date: 22 March 2016\n\nIncludes amendments up to: Carbon Credits (Carbon Farming Initiative—Facilities and Minor Corrections) Methodology Determination Variation 2016\n\n  \n\nAbout this compilation\n\nThis compilation\n\nThis is a compilation of the Carbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015 that shows the text of the law as amended and in force on 22 March 2016 (the compilation date).\n\nThis compilation was prepared on 22 March 2016 by the Department of the Environment.\n\nThe notes at the end of this compilation (the endnotes) include information about amending laws and the amendment history of provisions of the compiled law.\n\nUncommenced amendments\n\nThe effect of uncommenced amendments is not shown in the text of the compiled law. Any uncommenced amendments affecting the law are accessible on ComLaw (www.comlaw.gov.au). The details of amendments made up to, but not commenced at, the compilation date are underlined in the endnotes. For more information on any uncommenced amendments, see the series page on ComLaw for the compiled law.\n\nApplication, saving and transitional provisions for provisions and amendments\n\nIf the operation of a provision or amendment of the compiled law is affected by an application, saving or transitional provision that is not included in this compilation, details are included in the endnotes.\n\nModifications\n\nIf the compiled law is modified by another law, the compiled law operates as modified but the modification does not amend the text of the law. Accordingly, this compilation does not show the text of the compiled law as modified. For more information on any modifications, see the series page on ComLaw for the compiled law.\n\nSelf‑repealing provisions\n\nIf a provision of the compiled law has been repealed in accordance with a provision of the law, details are included in the endnotes.\n\n  \n\nContents\n\nPart 1—Preliminary\n\n1 Name\n\n2 Commencement\n\n3 Authority\n\n4 Duration\n\n5 Definitions\n\n6 References to factors and parameters from external sources\n\nPart 2—High efficiency commercial appliances project\n\n7 High efficiency commercial appliances project\n\nPart 3—Project requirements\n\n8 Operation of this Part\n\n9 Information to be included in application for declaration\n\n10 Equipment unit requirements\n\n11 Requirement in lieu of newness requirement\n\nPart 4—Net abatement amount\n\nDivision 1—Preliminary\n\n12 Operation of this Part\n\n13 Overview of gases accounted for in abatement calculations\n\n14 Equipment units to be used in calculations\n\n15 Data to be used in calculations\n\n16 Efficiency factor document\n\nDivision 2—Method for calculating net abatement amount\n\n17 Summary\n\n18 Net abatement amount (A)\n\n19 Abatement for a liquid-chilling package, air conditioner or close control air conditioner (Ai)\n\n20 Baseline energy consumption for a liquid-chilling package (EB,i)\n\n21 Project energy consumption for a liquid-chilling package (EP,i)\n\n22 Baseline energy consumption for an air conditioner (EB,i)\n\n23 Baseline cooling energy consumption for an air conditioner (CB,i)\n\n24 Baseline heating energy consumption for an air conditioner (HB,i)\n\n25 Project energy consumption for an air conditioner (EP,i)\n\n26 Project cooling energy consumption for an air conditioner (CP,i)\n\n27 Project heating energy consumption for an air conditioner (HP,i)\n\n28 Baseline energy consumption for a close control air conditioner (EB,i)\n\n29 Project energy consumption for a close control air conditioner (EP,i)\n\n30 Abatement for a refrigerated display cabinet (Ai)\n\nPart 5—Reporting, notification and record-keeping requirements\n\nDivision 1—Offsets report requirements\n\n31 Operation of this Division\n\n32 Information that must be included in an offsets report\n\nDivision 2—Notification requirements\n\n33 Operation of this Division\n\n34 Notification requirements\n\nDivision 3—Record-keeping requirements\n\n35 Operation of this Division\n\n36 Record-keeping requirements\n\nPart 6—Dividing a high efficiency commercial appliances project\n\n37 Division of project for reporting purposes\n\nSchedule 1—Air conditioner capacity factors\n\nSchedule 2—Classification of liquid-chilling packages\n\nSchedule 3—Classification of air conditioners\n\nSchedule 4—Classification of close control air conditioners\n\nSchedule 5—Classification of refrigerated display cabinets\n\nSchedule 6—Types of buildings and parts of buildings\n\nEndnotes\n\nEndnote 1—About the endnotes\n\nEndnote 2—Abbreviation key\n\nEndnote 3—Legislation history\n\nEndnote 4—Amendment history\n\nPart 1—Preliminary\n\n1 Name\n\nThis is the Carbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015.\n\n2 Commencement\n\nThis determination commences on the day after it is registered.\n\n3 Authority\n\nThis determination is made under subsection 106(1) of the Carbon Credits (Carbon Farming Initiative) Act 2011.\n\n4 Duration\n\nThis determination remains in force for the period that:\n\n(a) begins when this determination commences; and\n\n(b) ends on the day before this determination would otherwise be repealed under subsection 50(1) of the Legislative Instruments Act 2003.\n\n5 Definitions\n\nIn this determination:\n\nAct means the Carbon Credits (Carbon Farming Initiative) Act 2011.\n\nair conditioner means an air conditioner or heat pump covered by the Greenhouse and Energy Minimum Standards (Air Conditioners and Heat Pumps) Determination 2013.\n\nannual coefficient of performance for air conditioners has the meaning given by AS/NZS 3823.1.1:2012 Performance of electrical appliances – Airconditioners and heat pumps Part 2: Energy labelling and minimum energy performance standards (MEPS) requirements.\n\nannual energy efficiency ratio for air conditioners has the meaning given by AS/NZS 3823.1.1:2012 Performance of electrical appliances – Airconditioners and heat pumps Part 2: Energy labelling and minimum energy performance standards (MEPS) requirements.\n\nBCA means the Building Code of Australia, forming part of the National Construction Code, as in force from time to time.\n\nclose control air conditioner has the same meaning as in the Greenhouse and Energy Minimum Standards (Close Control Air Conditioners) Determination 2012.\n\nCO2‑e means carbon dioxide equivalent.\n\ncommissioned: an equipment unit in an installation is commissioned when the installed unit is first used to provide heating or cooling services once it has been established that it operates as intended.\n\ndeclaration day, for a high efficiency commercial appliances project, means the day the project is declared to be an eligible offsets project.\n\nefficiency factor document—see section 16.\n\nequipment unit—see section 7.\n\nefficiency value of a model of refrigerated display cabinet on the GEMS Register—see subsection 10(10).\n\nfully operational: an equipment unit is fully operational if it is capable of providing the intended heating or cooling function.\n\nGEMS determination has the same meaning as in the Greenhouse and Energy Minimum Standards Act 2012.\n\nGEMS Register has the same meaning as in the Greenhouse and Energy Minimum Standards Act 2012.\n\nhigh efficiency commercial appliances project—see section 7.\n\ninstallation—see section 7.\n\nliquid-chilling package has the same meaning as in the Greenhouse and Energy Minimum Standards (Liquid-chilling Packages Using the Vapour Compression Cycle) Determination 2012.\n\nmodel identifier has the same meaning as in the Greenhouse and Energy Minimum Standards Act 2012.\n\nNCC climate zone, for a location, means the applicable climate zone for that location determined in accordance with the Climate Zone Map, prepared by the Australian Building Codes Board and as in force from time to time.\n\nnet abatement amount, of a high efficiency commercial appliances project for a reporting period, means the carbon dioxide equivalent net abatement amount for the project in the reporting period for the purposes of paragraph 106(1)(c) of the Act.\n\nNGA Factors document means the document titled National Greenhouse Accounts Factors, published by the Department and as in force from time to time.\n\nrefrigerated display cabinet has the same meaning as in the Greenhouse and Energy Minimum Standards (Refrigerated Display Cabinets) Determination 2012.\n\nsensible energy efficiency ratio, for a close control air conditioner, has the meaning given by AS/NZS 4965.1:2008 Performance of close control air conditioners. Part 1: Testing for rating.\n\n6 References to factors and parameters from external sources\n\n(1) If a calculation in this determination includes a factor or parameter that is defined or calculated by reference to another instrument or writing, the factor or parameter to be used for a reporting period is the factor or parameter referred to in, or calculated by reference to, the instrument or writing as in force at the end of the reporting period.\n\n(2) Subsection (1) does not apply if:\n\n(a) this determination specifies otherwise; or\n\n(b) it is not possible to define or calculate the factor or parameter by reference to the instrument or writing as in force at the end of the reporting period.\n\nPart 2—High efficiency commercial appliances project\n\n7 High efficiency commercial appliances project\n\n(1) For paragraph 106(1)(a) of the Act, this determination applies to an offsets project if it involves 1 or more installations of equipment units, each of which can be reasonably expected to:\n\n(a) result in lower energy usage than would result if high efficiency equipment units were not used for the relevant heating or cooling; and\n\n(b) result in eligible carbon abatement.\n\n(2) An installation consists of installing 1 of the following equipment units:\n\n(a) a liquid-chilling package;\n\n(b) an air conditioner;\n\n(c) a close control air conditioner;\n\n(d) a refrigerated display cabinet;\n\nto provide a particular heating or cooling service to or in a building, or part of a building, that is of a type listed in Schedule 6.\n\n(3) To avoid doubt, an installation need not be part of any wider action, such as replacing an existing equipment unit. In particular, an installation may consist of:\n\n(a) replacing an existing equipment unit with a more efficient one; or\n\n(b) supplementing an existing system by installing an additional equipment unit that is of a high energy efficiency level; or\n\n(c) installing an equipment unit to service a new facility or function.\n\n(4) A project covered by subsection (1) is a high efficiency commercial appliances project.\n\nPart 3—Project requirements\n\n8 Operation of this Part\n\nFor paragraph 106(1)(b) of the Act, this Part sets out requirements that must be met for a high efficiency commercial appliances project to be an eligible offsets project.\n\n9 Information to be included in application for declaration\n\n(1) The application under section 22 of the Act in relation to the project must include the following information:\n\n(a) for each installation identified at the time of the application:\n\n    (i) the class of the equipment unit; and\n    (ii) the type of the building, or part of a building, that will be served by the equipment unit; and\n    (iii) whether the installation is replacing existing equipment units, supplementing existing equipment units, or providing a new service;\n\n(b) for installations not individually identified at the time of the application:\n\n    (i) the classes of equipment unit expected to be installed; and\n    (ii) the types of the buildings, or parts of buildings, that will be served by the equipment units.\n\n(2) For subsection (1):\n\n(a) the class of an equipment unit is the class in accordance with Schedules 2, 3, 4 and 5; and\n\n(b) the type of a building or part of a building is the type in accordance with Schedule 6.\n\n10 Equipment unit requirements\n\nNote: See section 16 to identify the applicable efficiency factor document referred to in this section.\n\n(1) Each equipment unit installed as part of the project must comply with the requirements in this section at the time the equipment unit is commissioned.\n\n(2) The equipment unit must be new.\n\n(3) The model of the equipment unit must be on the GEMS Register.\n\n(4) A liquid-chilling package must be of a model whose integrated part load value on the GEMS Register is equal to or greater than the high efficiency threshold specified for such a model in the efficiency factor document.\n\n(5) An air conditioner that:\n\n(a) can be used only for cooling; or\n\n(b) can be used for both heating and cooling, but is installed in NCC climate zones 1 to 3;\n\nmust be of a model whose annual energy efficiency ratio for cooling on the GEMS Register is equal to or greater than the high efficiency threshold specified for such a model in the efficiency factor document.\n\n(6) An air conditioner that:\n\n(a) can be used for both heating and cooling; and\n\n(b) is installed in NCC climate zones 4 to 8;\n\nmust be of a model:\n\n(c) whose annual energy efficiency ratio for cooling on the GEMS Register is equal to or greater than the high efficiency threshold specified for such a model in the efficiency factor document; and\n\n(d) whose annual coefficient of performance for heating on the GEMS Register is equal to or greater than the high efficiency threshold specified for such a model in the efficiency factor document.\n\n(7) An air conditioner that can be used only for heating must be of a model whose annual coefficient of performance for heating on the GEMS Register is equal to or greater than the high efficiency threshold specified for such a model in the efficiency factor document.\n\n(8) A close control air conditioner must be of a model whose sensible energy efficiency ratio on the GEMS Register is equal to or greater than the high efficiency threshold specified for such a model in the efficiency factor document.\n\n(9) A refrigerated display cabinet must be of a model whose efficiency value is equal to or lower than the high efficiency threshold specified for such a model in the efficiency factor document.\n\nNote: The efficiency value of a refrigerated display cabinet is a parameter for which a lower number represents greater efficiency (see next subsection).\n\n(10) For this determination, the efficiency value of a model of refrigerated display cabinet on the GEMS Register is the amount, in kWh/day/m2 worked out using the following equation (equation 1):\n\n![](image.002.png)\n\nwhere:\n\nenergy consumption is daily total energy consumption, in kWh/day, that is on the GEMS Register for that model.\n\ndisplay area is the total display area, in m2, that is on the GEMS Register for that model.\n\n(11) The building, or part of a building, that will be served by the equipment unit must be of a type listed in Schedule 6.\n\nNote: The effect of subsection (11) is to exclude installations in private dwellings or small boarding or guest houses and the like.\n\n11 Requirement in lieu of newness requirement\n\n(1) For subparagraph 27(4A)(a)(ii) of the Act, the substitute newness requirement is in lieu of the newness requirement for a high efficiency commercial appliances project.\n\n(2) The project meets the substitute newness requirement if it has not begun to be implemented.\n\n(3) The project also meets the substitute newness requirement if:\n\n(a) the project proponent or project proponents for the project:\n\n    (i) gave the Regulator a written notice of intention to make an application in relation to the project that satisfied:\n\n(A) paragraphs (1)(a) to (d) of item 388B of Schedule 1 to the amendment Act; or\n\n(B) paragraphs (1)(a) to (d) of item 388C of that Schedule; and\n\n    (ii) made the application under section 22 of the Act, or were taken to have done so under the Act, before 1 July 2016; and\n\n(b) the project had not begun to be implemented at the intention notice time.\n\n(4) A determination as to whether a project has begun to be implemented at a particular time is to be done as if for the purposes of subparagraph 27(4A)(a)(i) of the Act (so that subsections 27(4B) to (4E) of the Act apply).\n\n(5) In this section:\n\namendment Act means the Carbon Farming Initiative Amendment Act 2014.\n\nintention notice time has the same meaning as in item 388B or 388C of Schedule 1 to the amendment Act, as appropriate.\n\nNote: Transitional provisions in the Carbon Farming Initiative Amendment Act 2014 allowed prospective proponents who gave notice of their intentions before the date of Proclamation of that Act to have the newness of their projects assessed as at the time of their notice, provided that they made the section 22 application before 1 July 2015. The effect of this section is to extend this deadline to 1 July 2016 for this determination.\n\nPart 4—Net abatement amount\n\nDivision 1—Preliminary\n\n12 Operation of this Part\n\nFor paragraph 106(1)(c) of the Act, this Part specifies the method for working out the carbon dioxide equivalent net abatement amount for a reporting period for a high efficiency commercial appliances project that is an eligible offsets project.\n\n13 Overview of gases accounted for in abatement calculations\n\nThe following table provides an overview of the greenhouse gases and emissions sources that are relevant to working out the net abatement amount for a high efficiency commercial appliances project.  \n\n```html\n<table cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left:0.25pt; border-collapse:collapse\"><thead><tr><td colspan=\"4\" style=\"width:404.85pt; border-top:1.5pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Greenhouse gases and emissions sources</span></p></td></tr><tr><td style=\"width:24.9pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Item</span></p></td><td style=\"width:115.85pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Relevant emissions calculation</span></p></td><td style=\"width:115.85pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Emissions source</span></p></td><td style=\"width:115.85pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Greenhouse gas</span></p></td></tr></thead><tbody><tr><td style=\"width:24.9pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"Tabletext\"><span>1</span></p></td><td style=\"width:115.85pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"Tabletext\"><span>Baseline emissions</span></p><p class=\"Tabletext\"><span>Project emissions</span></p></td><td style=\"width:115.85pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"Tabletext\"><span>Electricity consumption</span></p></td><td style=\"width:115.85pt; border-top:1.5pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"Tabletext\"><span>Carbon dioxide (CO</span><span style=\"font-size:6.67pt; vertical-align:sub\">2</span><span>)</span></p><p class=\"Tabletext\"><span>Methane (CH</span><span style=\"font-size:6.67pt; vertical-align:sub\">4</span><span>)</span></p><p class=\"Tabletext\"><span>Nitrous oxide (N</span><span style=\"font-size:6.67pt; vertical-align:sub\">2</span><span>O)</span></p></td></tr></tbody></table>\n```\n\n14 Equipment units to be used in calculations\n\n(1) In calculating the net abatement amount for the project for a reporting period:\n\n(a) the project proponent may choose to exclude a particular equipment unit from the calculations; and\n\n(b) the project proponent must exclude an equipment unit if, at any time during the reporting period, the equipment unit, or part of it, is modified in a way that has an effect, that is not minor or trivial, on the abatement for the equipment unit.\n\nNote: An exclusion of an equipment unit from abatement calculations works to exclude the unit from both the baseline and project energy consumption calcuations.\n\n(2) For paragraph (1)(b), modifying includes dismantling and otherwise making inoperative.\n\n15 Data to be used in calculations\n\nIn calculating the net abatement amount, the project proponent must, for each equipment unit included in the calculation:\n\n(a) record the model identifier of the unit used to identify the product in the GEMS Register; and\n\n(b) use data for that product in the GEMS Register as at the time the unit is commissioned.\n\n16 Efficiency factor document\n\n(1) For this determination, a reference to the efficiency factor document is a reference to a document published by the Department on its website that is expressed to be the efficiency factor document for this determination.\n\n(2) The efficiency factor document must contain:\n\n(a) for liquid-chilling packages:\n\n    (i) baseline efficiency integrated part load values for classes of products with the same condenser type and within the same cooling capacity range; and\n    (ii) corresponding high efficiency thresholds; and\n\n(b) for air conditioners:\n\n    (i) baseline annual energy efficiency ratios for cooling for classes of products of the same type and within the same cooling capacity range; and\n    (ii) corresponding high efficiency thresholds for cooling; and\n    (iii) baseline annual coefficients of performance for heating for classes of products of the same type and within the same heating capacity range; and\n    (iv) corresponding high efficiency thresholds for heating; and\n\n(c) for close control air conditioners:\n\n    (i) baseline sensible energy efficiency ratios for classes of products within the same net sensible cooling capacity range; and\n    (ii) corresponding high efficiency thresholds; and\n\n(d) for refrigerated display cabinets:\n\n    (i) baseline efficiency values for classes of products of the same cabinet type and M-package temperature class; and\n    (ii) corresponding high efficiency thresholds.\n\nDetermining baseline factors and corresponding high efficiency thresholds\n\n(3) For paragraphs (2)(a), (b) and (c):\n\n(a) the baseline factor for a class of products is the average of the values of that factor for those products on the GEMS Register for which the data is publicly available; and\n\n(b) the corresponding high efficiency threshold for that class is the median of the values of that factor for those products with values of that factor that are higher than the baseline factor.\n\n(4) For paragraph (2)(d):\n\n(a) the baseline efficiency value for a class of products is the average of the efficiency values for those products on the GEMS Register for which the data required to calculate the efficiency value is publicly available; and\n\n(b) the corresponding high efficiency threshold for that class is the median of the efficiency values for those products with efficiency values that are lower than the baseline factor.\n\nNote: The efficiency value of a refrigerated display cabinet is a parameter for which a lower number represents greater efficiency (see subsection 10(10)).\n\nApplicable efficiency factor document for installed equipment\n\n(5) For a provision of this determination that relates to an installed equipment unit, the applicable efficiency factor document is the one in force at the time the installation was completed, unless subsection (6) applies.\n\n(6) If:\n\n(a) the applicable efficiency factor document that would apply in relation to the equipment unit under subsection (5) is a revised version that was published on the Department’s website on a particular day (the publication day); and\n\n(b) the equipment unit that was installed was the subject of a contract or purchase order that specified that an equipment unit of that model was to be delivered to the location of the installation; and\n\n(c) the contract or purchase order was entered into and dated before the publication day;\n\nthe project proponent may choose to apply the efficiency factor document that was in force on the day the contract or purchase order was entered into.\n\nDepartment to maintain efficiency factor document\n\n(7) The Department must publish an efficiency factor document within 3 months after the commencement of this determination, and must publish a revised version when satisfied that it is appropriate.\n\n(8) The Department must consider, at intervals of not more than 12 months, whether it would be appropriate to publish a revised version, taking into account any views expressed by the Emissions Reduction Assurance Committee.\n\n(9) A revised version of the efficiency factor document must be expressed to commence on a date at least 60 days after the document is published by the Department on its website.\n\nDivision 2—Method for calculating net abatement amount\n\n17 Summary\n\nThe net abatement amount for a project for the reporting period is the sum of the abatement during the reporting period resulting from the installation of each equipment unit.\n\nThe abatement for an equipment unit is the baseline energy consumption minus the project energy consumption for the equipment unit multiplied by the relevant emissions factor for electricity for the unit.\n\n18 Net abatement amount (A)\n\nThe net abatement amount for a reporting period, A, in tonnes CO2\\-e, is worked out using the equation (equation 2):\n\n![](image.003.png)\n\nwhere:\n\nn is the number of equipment units over which abatement is measured for the reporting period.\n\nAi is the abatement for the reporting period of the ith equipment unit of the high efficiency commercial appliances project, in tonnes CO2\\-e, calculated using:\n\n(a) for an equipment unit that is a liquid-chilling package, air conditioner or close control air conditioner—equation 3; and\n\n(b) for an equipment unit that is a refrigerated display cabinet—equation 14.\n\n19 Abatement for a liquid-chilling package, air conditioner or close control air conditioner (Ai)\n\n(1) For equation 2, Ai for the ith liquid-chilling package, air conditioner or close control air conditioner is worked out using the equation (equation 3):\n\n![](image.004.png)\n\nwhere:\n\nEB,i is, for the ith equipment unit, the baseline energy consumption, in MWh, that is deemed would have occurred during the reporting period had there been no project, calculated using:\n\n(a) if the equipment unit is a liquid-chilling package—equation 4; and\n\n(b) if the equipment unit is an air conditioner—equation 6, and\n\n(c) if the equipment unit is a close control air conditioner—equation 12.\n\nEP,i is the project energy consumption, in MWh, for the ith equipment unit during the reporting period, calculated using:\n\n(a) if the unit is a liquid-chilling package—equation 5; and\n\n(b) if the unit is an air conditioner—equation 9; and\n\n(c) if the unit is a close control air conditioner—equation 13.\n\nEFelec,i is:\n\n(a) for electricity obtained from an electricity grid that is a grid for which the NGA Factors document in force on the declaration day includes an emissions factor—that factor, in kilograms CO2‑e per kilowatt hour; or\n\n(b) for electricity obtained from an electricity grid not covered by paragraph (a) or from a source other than an electricity grid:\n\n    (i) if the supplier of the electricity is able to provide an emissions factor that reflects the emissions intensity of the electricity and is applicable on the declaration day—that factor, in kilograms CO2‑e per kilowatt hour; or\n    (ii) otherwise—the emissions factor, in kilograms CO2‑e per kilowatt hour, for off‑grid electricity included in the NGA Factors document in force on the declaration day.\n\n(2) For subparagraph (b)(i) of the definition of EFelec,i, the emissions factor must be worked out:\n\n(a) on a sent‑out basis; and\n\n(b) using a measurement or estimation approach that is consistent with the National Greenhouse and Energy Reporting (Measurement) Determination 2008.\n\n20 Baseline energy consumption for a liquid-chilling package (EB,i)\n\nFor equation 3, EB,i, for the ith liquid-chilling package, is worked out using the equation (equation 4):\n\n![](image.005.png)\n\nwhere:\n\nPCC,i, is the cooling capacity power, in kW, that is on the GEMS Register for the model of the ith installed liquid-chilling package.\n\nIPLVB,i is, for the model of the ith liquid-chilling package, the baseline efficiency integrated part load value specified for such a model in the efficiency factor document.\n\nti is the number of days in the reporting period for the ith liquid‑chilling package after it is commissioned.\n\nNote 1: The factor 0.9 is a factor that takes account of the fact that a liquid-chilling package may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nNote 2: The factor 0.171 is the default capacity factor for liquid‑chilling packages.\n\n21 Project energy consumption for a liquid-chilling package (EP,i)\n\nFor equation 3, EP,i, for the ith liquid-chilling package, is worked out using the equation (equation 5):\n\n![](image.006.png)\n\nwhere:\n\nPCC,i is the cooling capacity power, in kW, that is on the GEMS Register for the model of the ith installed liquid-chilling package.\n\nIPLVP,i is the integrated part load value that is on the GEMS Register for the model of the ith liquid-chilling package.\n\nti is the number of days in the reporting period for the ith liquid‑chilling package after it is commissioned.\n\nNote 1: The factor 0.9 is a factor that takes account of the fact that a liquid-chilling package may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nNote 2: The factor 0.171 is the default capacity factor for liquid‑chilling packages.\n\nNote 3: PCC,i, and ti have the same values in equations 4 and 5.\n\n22 Baseline energy consumption for an air conditioner (EB,i)\n\nFor equation 3, EB,i , for the ith air conditioner, is worked out using the equation (equation 6):\n\n![](image.007.png)\n\nwhere:\n\nCB,i is the baseline cooling energy consumption, in MWh, for the ith air conditioner, which is:\n\n(a) if the air conditioner can be used for cooling—calculated using equation 7; and\n\n(b) if the air conditioner can be used only for heating—zero.\n\nHB,i is the baseline heating energy consumption, in MWh, for the ith air conditioner, which is:\n\n(a) if the air conditioner can be used for heating—calculated using equation 8; and\n\n(b) if the air conditioner can be used only for cooling—zero.\n\n23 Baseline cooling energy consumption for an air conditioner (CB,i)\n\nFor equation 6, CB,i, for the ith air conditioner, is worked out using the equation (equation 7):\n\n![](image.008.png)\n\nwhere:\n\nPTCC,i is the total cooling capacity power, in kW, that is on the GEMS Register for the model of the ith air conditioner.\n\nAEERB,i is, for the model of the ith air conditioner, the baseline annual energy efficiency ratio specified for such a model in the efficiency factor document.\n\nti is the number of days in the reporting period for the ith air conditioner after it is commissioned.\n\nCFC,i is, for the model of the ith air conditioner, the cooling capacity factor for the appropriate climate zone specified in Schedule 1.\n\nNote: The factor 0.9 is a factor that takes account of the fact that an air conditioner may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\n24 Baseline heating energy consumption for an air conditioner (HB,i)\n\nFor equation 6, HB,i, for the ith air conditioner, is worked out using the equation (equation 8):\n\n![](image.009.png)\n\nwhere:\n\nPHC,i is the heating capacity power, in kW, that is on the GEMS Register for the model of the ith air conditioner.\n\nACOPB,i is, for the model of the ith air conditioner, the baseline annual coefficient of performance for heating specified for such a model in the efficiency factor document.\n\nti is the number of days in the reporting period for the ith air conditioner after it is commissioned.\n\nCFH,i is, for the model of the ith air conditioner, the heating capacity factor for the appropriate climate zone specified in Schedule 1.\n\nNote: The factor 0.9 is a factor that takes account of the fact that an air conditioner may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\n25 Project energy consumption for an air conditioner (EP,i)\n\nFor equation 3, EP,i for the ith air conditioner, is worked out using the equation (equation 9):\n\n![](image.010.png)\n\nwhere:\n\nCP,i is the project cooling energy consumption, in MWh, for the ith air conditioner, which is:\n\n(a) if the air conditioner can be used for cooling—calculated using equation 10; and\n\n(b) if the air conditioner can be used only for heating—zero.\n\nHP,i is the project heating energy consumption, in MWh, for the ith air conditioner, which is:\n\n(a) if the air conditioner can be used for heating—calculated using equation 11; and\n\n(b) if the air conditioner can be used only for cooling—zero.\n\n26 Project cooling energy consumption for an air conditioner (CP,i)\n\nFor equation 9, CP,i, for the ith air conditioner is worked out using the equation (equation 10):\n\n![](image.011.png)\n\nwhere:\n\nPTCC,i is the total cooling capacity power, in kW, that is on the GEMS Register for the model of the ith air conditioner.\n\nAEERP,i is the annual energy efficiency ratio that is on the GEMS Register for the model of the ith air conditioner.\n\nti is the number of days in the reporting period for the ith air conditioner after it is commissioned.\n\nCFC,i is, for the model of the ith air conditioner, the cooling capacity factor for the appropriate climate zone specified in Schedule 1.\n\nNote 1: The factor 0.9 is a factor that takes account of the fact that an air conditioner may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nNote 2: PTCC,i and CFC,i have the same values in equations 7 and 10.\n\n27 Project heating energy consumption for an air conditioner (HP,i)\n\nFor equation 9, HP,i, for the ith air conditioner, is worked out using the equation (equation 11):\n\n![](image.012.png)\n\nwhere:\n\nPHC,i is the heating capacity power, in kW, that is on the GEMS Register for the model of the ith air conditioner.\n\nACOPP,i is, for the model of the ith air conditioner, the annual coefficient of performance for heating that is on the GEMS Register.\n\nti is the number of days in the reporting period for the ith air conditioner after it is commissioned.\n\nCFH,i is, for the model of the ith air conditioner, the heating capacity factor for the appropriate climate zone specified in Schedule 1.\n\nNote: The factor 0.9 is a factor that takes account of the fact that an air conditioner may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nNote 2: PHC,i and CFH,i have the same values in equations 8 and 11; ti has the same value in equations 7, 8, 10 and 11.\n\n28 Baseline energy consumption for a close control air conditioner (EB,i)\n\nFor equation 3, EB,i, for the ith close control air conditioner, is worked out using the equation (equation 12):\n\n![](image.013.png)\n\nwhere:\n\nPCC,i is the net sensible cooling capacity power, in kW, that is on the GEMS Register for the model of the ith close control air conditioner.\n\nEERSB,i is, for the model of the ith close control air conditioner, the baseline sensible energy efficiency ratio specified for such a model in the efficiency factor document.\n\nti is the number of days in the reporting period for the ith close control air conditioner after it is commissioned.\n\nNote 1: The factor 0.9 is a factor that takes account of the fact that a close control air conditioner may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nNote 2: The factor 0.65 is the default capacity factor for close control air conditioners.\n\n29 Project energy consumption for a close control air conditioner (EP,i)\n\nFor equation 3, EP,i, for the ith close control air conditioner, is worked out using the equation (equation 13):\n\n![](image.014.png)\n\nwhere:\n\nPCC,i is the net sensible cooling capacity power, in kW, that is on the GEMS Register for the model of the ith close control air conditioner.\n\nEERSP,i is the sensible energy efficiency ratio that is on the GEMS Register for the model of the ith close control air conditioner.\n\nti is the number of days in the reporting period for the ith close control air conditioner after it is commissioned.\n\nNote 1: The factor 0.9 is a factor that takes account of the fact that a close control air conditioner may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nNote 2: The factor 0.65 is the default capacity factor for close control air conditioners.\n\nNote 3: PCC,i, and ti have the same values in equations 12 and 13.\n\n30 Abatement for a refrigerated display cabinet (Ai)\n\nFor equation 2, Ai for the ith refrigerated display cabinet is worked out using the equation (equation 14):\n\n![](image.015.png)\n\nwhere:\n\nηB,i is, for the model of the ith refrigerated display cabinet, the baseline efficiency specified for such a model, in kWh/day/m2, in the efficiency factor document.\n\nATDA,i is the total display area of that cabinet, in m2, on the GEMS Register for the model of the ith refrigerated display cabinet.\n\nETEC,i is the daily total energy consumption of the cabinet, in kWh/day, on the GEMS Register for the model of the ith refrigerated display cabinet.\n\nti is the number of days in the reporting period for the ith refrigerated display cabinet after it is commissioned.\n\nEFelec,i has the same meaning as in equation 3.\n\nNote: The factor 0.9 is a factor that takes account of the fact that a refrigerated display cabinet may be out of operation, or the use of the premises that it serves may be suspended, for reasons other than normal usage patterns during the reporting period.\n\nPart 5—Reporting, notification and record-keeping requirements\n\nNote: Other reporting, notification, record-keeping and monitoring requirements are set out in regulations and rules made under the Act.\n\nDivision 1—Offsets report requirements\n\n31 Operation of this Division\n\nFor paragraph 106(3)(a) of the Act, this Division sets out information that must be included in an offsets report about a high efficiency commercial appliances project that is an eligible offsets project.\n\n32 Information that must be included in an offsets report\n\n(1) An offsets report for a reporting period must, for each installed equipment unit included in a calculation undertaken in accordance with Part 4 for the reporting period, state in a manner and form approved by the Regulator:\n\n(a) its location; and\n\n(b) its model number and serial number; and\n\n(c) the class of equipment unit to which it belongs under Schedule 2, 3, 4 or 5; and\n\n(d) whether it:\n\n    (i) was included in the most recent previous offsets report; or\n    (ii) is an old installation that was excluded from the most recent previous report; or\n    (iii) is a new installation that has not been included in a previous report.\n\n(2) For an equipment unit that was included in calculations for an earlier reporting period, but is not included in calculations for this reporting period, the report must state:\n\n(a) the reason for the exclusion; and\n\n(b) whether the exclusion is expected to be temporary or permanent.\n\n(3) If, in the circumstances described in paragraph 6(2)(b), a factor or parameter is defined or calculated for a reporting period by reference to an instrument or writing as in force from time to time, the offsets report must include the reasons why it was not possible to define or calculate the factor or parameter by reference to the instrument or writing as in force at the end of the reporting period.\n\nDivision 2—Notification requirements\n\n33 Operation of this Division\n\nFor paragraph 106(3)(b) of the Act, this Division sets out requirements to notify the Regulator of certain matters relating to a high efficiency commercial appliances project that is an eligible offsets project.\n\n34 Notification requirements\n\n(1) The project proponent must notify the Regulator of any safety issues that have been identified with an equipment unit installed or proposed to be installed in relation to the project as soon as practicable after the proponent becomes aware of that issue.\n\n(2) The project proponent must notify the Regulator of any product performance issues that have been identified with an equipment unit installed or proposed to be installed in relation to the project within 30 days after the proponent becomes aware of that issue if:\n\n(a) a product recall notice has been issued; or\n\n(b) the issue affects:\n\n    (i) more than 5% of the installations of the project; or\n    (ii) more than 50 installations.\n\nDivision 3—Record-keeping requirements\n\n35 Operation of this Division\n\nFor paragraph 106(3)(c) of the Act, this Division sets out record-keeping requirements for a high efficiency commercial appliances project that is an eligible offsets project.\n\n36 Record-keeping requirements\n\nFor each installation, the project proponent must keep records of the following:\n\n(a) the date equipment unit was commissioned;\n\n(b) if the equipment unit, or part of it, is dismantled or made inoperative so that paragraph 14(1)(b) applies—the date when this occurs;\n\n(c) if the project proponent uses subsection 16(6) to apply an earlier efficiency factor document than would otherwise be applicable under this determination—the contract or purchase order relied on, including evidence that it was entered into and dated before the publication day mentioned in that subsection.\n\nPart 6—Dividing a high efficiency commercial appliances project\n\n37 Division of project for reporting purposes\n\nFor subsection 77A(2) of the Act, the project may be divided into parts only if:\n\n(a) each part would qualify as a high efficiency commercial appliances project; and\n\n(b) each part has achieved an abatement of at least 2,000 tonnes CO2\\-e in the reporting period before the division; and\n\n(c) all installations that service areas or buildings with the same physical address are in the same part.  \n\nSchedule 1—Air conditioner capacity factors\n\n```html\n<table cellspacing=\"0\" cellpadding=\"0\" style=\"width:453.6pt; margin-left:0.25pt; border-collapse:collapse\"><thead><tr style=\"height:17pt\"><td colspan=\"3\" style=\"width:326.9pt; border-top:1.5pt solid #000000; border-bottom:1pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Air conditioner capacity factors</span></p></td><td style=\"width:105.1pt; border-top:1.5pt solid #000000; border-bottom:1pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span></span></p></td></tr><tr style=\"height:17pt\"><td style=\"width:40pt; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Item</span></p></td><td style=\"width:160.2pt; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>NCC climate zone</span></p></td><td style=\"width:105.1pt; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Cooling capacity factor</span></p></td><td style=\"width:105.1pt; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p class=\"TableHeading\"><span>Heating capacity factor</span></p></td></tr></thead><tbody><tr style=\"height:26pt\"><td style=\"width:40pt; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>1</span></p></td><td style=\"width:160.2pt; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 1—High humidity summer, warm winter</span></p></td><td style=\"width:105.1pt; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.192</span></p></td><td style=\"width:105.1pt; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.010</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>2</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 2—Warm humid summer, mild winter</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.182</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.020</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>3</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 3—Hot dry summer, warm winter</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.192</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.010</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>4</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 4—Hot dry summer, cool winter</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.101</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.101</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>5</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 5—Warm temperate</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.101</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.101</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>6</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 6—Mild temperate</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.067</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.135</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>7</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 7—Cool temperate</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.020</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:0.75pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.182</span></p></td></tr><tr style=\"height:26pt\"><td style=\"width:40pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\"><span>8</span></p></td><td style=\"width:160.2pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p><span style=\"font-size:10pt\">Climate zone 8—Alpine</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.020</span></p></td><td style=\"width:105.1pt; border-top:0.75pt solid #000000; border-bottom:1.5pt solid #000000; padding-right:5.4pt; padding-left:5.4pt\"><p class=\"Tabletext\" style=\"text-align:center\"><span>0.182</span></p></td></tr></tbody></table>\n```\n\nSchedule 2—Classification of liquid-chilling packages\n\n| Class | Condenser type | Cooling capacity (kW) |\n| ----- | -------------- | --------------------- |\n| 1     | Air cooled     | 350 to <500           |\n| 2     | Air cooled     | 500 to <700           |\n| 3     | Air cooled     | 700 to <1,000         |\n| 4     | Air cooled     | 1,000 to <1,500       |\n| 5     | Air cooled     | ≥1,500                |\n| 6     | Water cooled   | 350 to <500           |\n| 7     | Water cooled   | 500 to <700           |\n| 8     | Water cooled   | 700 to <1,000         |\n| 9     | Water cooled   | 1,000 to <1,500       |\n| 10    | Water cooled   | ≥1,500                |\n\nSchedule 3—Classification of air conditioners\n\n| Class | Product type             | Capacity (kW) |\n| ----- | ------------------------ | ------------- |\n| 1     | Non-ducted unitary       | <10           |\n| 2     | Non-ducted unitary       | 10 to <19     |\n| 3     | Non-ducted split systems | < 4           |\n| 4     | Non-ducted split systems | 4 to <10      |\n| 5     | Non-ducted split systems | 10 to <19     |\n| 6     | Ducted systems           | <10           |\n| 7     | Ducted systems           | 10 to <19     |\n| 8     | Multi-split systems      | <4            |\n| 9     | Multi-split systems      | 4 to <10      |\n| 10    | Multi-split systems      | 10 to <19     |\n| 11    | All configurations       | 19 to 39      |\n| 12    | All configurations       | >39 to 65     |\n\nSchedule 4—Classification of close control air conditioners\n\n| Class | Net sensible cooling capacity (kW) |\n| ----- | ---------------------------------- |\n| 1     | <19.05                             |\n| 2     | 19.05 to <39.5                     |\n| 3     | 39.5 to <70.0                      |\n| 4     | ≥70.0                              |\n\nSchedule 5—Classification of refrigerated display cabinets\n\n| Class | Cabinet type       | M-package temperature class |\n| ----- | ------------------ | --------------------------- |\n| 1     | RS 1—Unlit shelves | All                         |\n| 2     | RS 1—Lit shelves   | All                         |\n| 3     | RS 2—Unlit shelves | All                         |\n| 4     | RS 2—Lit shelves   | All                         |\n| 5     | RS 3—Unlit shelves | All                         |\n| 6     | RS 3—Lit shelves   | All                         |\n| 7     | RS 4—Glass door    | All                         |\n| 8     | RS 6—Gravity coil  | All                         |\n| 9     | RS 6—Fan coil      | All                         |\n| 10    | RS 7—Fan coil      | All                         |\n| 11    | RS 8—Gravity coil  | All                         |\n| 12    | RS 8—Fan coil      | All                         |\n| 13    | RS 9—Fan coil      | All                         |\n| 14    | RS 10—Low          | All                         |\n| 15    | RS 11              | All                         |\n| 16    | RS 12              | All                         |\n| 17    | RS 13—Solid sided  | All                         |\n| 18    | RS 13—Glass sided  | All                         |\n| 19    | RS14—Solid sided   | All                         |\n| 20    | RS 14—Glass sided  | All                         |\n| 21    | RS 15—Glass door   | All                         |\n| 22    | RS 16—Glass door   | All                         |\n| 23    | RS 18              | All                         |\n| 24    | RS 19              | All                         |\n| 25    | HC1                | M1                          |\n| 26    | HC1                | M2                          |\n| 27    | HC2                | M2                          |\n| 28    | HC3                | M1                          |\n| 29    | HC4                | M1                          |\n| 30    | HC4                | M2                          |\n| 31    | HC6                | M2                          |\n| 32    | VC1                | M1                          |\n| 33    | VC1                | M2                          |\n| 34    | VC2                | M1                          |\n| 35    | VC2                | M2                          |\n| 36    | VC4 (solid door)   | M1                          |\n| 37    | VC4 (solid door)   | M2                          |\n| 38    | VC4 (glass door)   | M1                          |\n| 39    | VC4 (glass door)   | M2                          |\n| 40    | HF4                | L1                          |\n| 41    | HF4                | L2                          |\n| 42    | HF6                | L1                          |\n| 43    | HF6                | L2                          |\n| 44    | VF4 (solid door)   | L1                          |\n| 45    | VF4 (solid door)   | L2                          |\n| 46    | VF4 (glass door)   | L1                          |\n| 47    | VF4 (glass door)   | L2                          |\n\nSchedule 6—Types of buildings and parts of buildings\n\n|     | Type of building or part of a building                                                      |\n| --- | ------------------------------------------------------------------------------------------- |\n| 1   | BCA Class 2 buildings (Common Areas)                                                        |\n| 2   | BCA Class 3 buildings                                                                       |\n| 3   | BCA Class 5 buildings                                                                       |\n| 4   | BCA Class 6 buildings                                                                       |\n| 5   | BCA Class 7 buildings                                                                       |\n| 6   | BCA Class 8 buildings                                                                       |\n| 7   | BCA Class 9 buildings                                                                       |\n| 8   | Other place not covered above, other than in BCA Class 1, 2, 4 or 10 buildings/ structures. |\n\n> Note: Endnotes\n\n> Note: Endnote 1—About the endnotes\n\nThe endnotes provide information about this compilation and the compiled law.\n\nThe following endnotes are included in every compilation:\n\nEndnote 1—About the endnotes\n\nEndnote 2—Abbreviation key\n\nEndnote 3—Legislation history\n\nEndnote 4—Amendment history\n\nEndnotes about misdescribed amendments and other matters are included in a compilation only as necessary.\n\nAbbreviation key—Endnote 2\n\nThe abbreviation key sets out abbreviations that may be used in the endnotes.\n\nLegislation history and amendment history—Endnotes 3 and 4\n\nAmending laws are annotated in the legislation history and amendment history.\n\nThe legislation history in endnote 3 provides information about each law that has amended (or will amend) the compiled law. The information includes commencement details for amending laws and details of any application, saving or transitional provisions that are not included in this compilation.\n\nThe amendment history in endnote 4 provides information about amendments at the provision (generally section or equivalent) level. It also includes information about any provision of the compiled law that has been repealed in accordance with a provision of the law.\n\nMisdescribed amendments\n\nA misdescribed amendment is an amendment that does not accurately describe the amendment to be made. If, despite the misdescription, the amendment can be given effect as intended, the amendment is incorporated into the compiled law and the abbreviation “(md)” added to the details of the amendment included in the amendment history.\n\nIf a misdescribed amendment cannot be given effect as intended, the amendment is set out in the endnotes\n\n  \n\n> Note: Endnote 2—Abbreviation key\n\n| A = Act                                         | orig = original                     |\n| ----------------------------------------------- | ----------------------------------- |\n| ad = added or inserted                          | par = paragraph(s)/subparagraph(s)  |\n| am = amended                                    | /sub‑subparagraph(s)                |\n| amdt = amendment                                | pres = present                      |\n| c = clause(s)                                   | prev = previous                     |\n| C[x] = Compilation No. x                        | (prev…) = previously                |\n| Ch = Chapter(s)                                 | Pt = Part(s)                        |\n| def = definition(s)                             | r = regulation(s)/rule(s)           |\n| Dict = Dictionary                               | Reg = Regulation/Regulations        |\n| disallowed = disallowed by Parliament           | reloc = relocated                   |\n| Div = Division(s)                               | renum = renumbered                  |\n| exp = expires/expired or ceases/ceased to have  | rep = repealed                      |\n| effect                                          | rs = repealed and substituted       |\n| F = Federal Register of Legislative Instruments | s = section(s)/subsection(s)        |\n| gaz = gazette                                   | Sch = Schedule(s)                   |\n| LI = Legislative Instrument                     | Sdiv = Subdivision(s)               |\n| LIA = Legislative Instruments Act 2003          | SLI = Select Legislative Instrument |\n| (md) = misdescribed amendment                   | SR = Statutory Rules                |\n| mod = modified/modification                     | Sub‑Ch = Sub‑Chapter(s)             |\n| No. = Number(s)                                 | SubPt = Subpart(s)                  |\n| o = order(s)                                    | underlining = whole or part not     |\n| Ord = Ordinance                                 | commenced or to be commenced        |\n\n  \n\n> Note: Endnote 3—Legislation history\n\n| Name                                                                                                                 | FRLI registration              | Commencement           | Application, saving and transitional provisions            |\n| -------------------------------------------------------------------------------------------------------------------- | ------------------------------ | ---------------------- | ---------------------------------------------------------- |\n| Carbon Credits (Carbon Farming Initiative— High Efficiency Commercial Appliances) Methodology Determination 2015     | 25 November 2015 (F2015L01839) | 26 November 2015 (s 2) |                                                            |\n| Carbon Credits (Carbon Farming Initiative—Facilities and Minor Corrections) Methodology Determination Variation 2016 | 21 March 2016(F2016L00363)     | 22 March 2016 (s 2)    | Carbon Credits (Carbon Farming Initiative) Act 2011, s 126 |\n\n  \n\n> Note: Endnote 4—Amendment history\n\n| Provision affected | How affected   |\n| ------------------ | -------------- |\n| Part 4             |                |\n| Division 1         |                |\n| s 16               | am F2016L00363 |","sortOrder":0}],"analysis":{"flash_summary":{"complexity_score":7,"scope_assessment":{"changed":true,"description":"Section 11 modifies the substitute newness requirement in relation to transitional intention notices under the Carbon Farming Initiative Amendment Act 2014 by extending the deadline for making section 22 applications to 1 July 2016 for eligible intention notices. That change widens the set of projects that may qualify under the transitional newness rule (s11)."},"complexity_factors":["Multiple device‑specific mathematical formulas for baseline and project energy (equations 2–14 in Part 4) increase calculation complexity.","Dependence on external registries and documents (GEMS Register, NGA Factors, NGER Measurement Determination) requires cross‑referencing and data‑integration (ss15, 19(1), 6).","Departmental discretion to publish and revise the efficiency factor document, with staged commencement and look‑back options, creates temporal complexity (s16(1), (5)–(9)).","Numerous classifications and schedules (Schedules 1–6) that determine capacity factors, product classes and applicable formulas.","Default capacity and availability factors (e.g. 0.9, 0.171, 0.65) embedded in formulas require assumptions about utilisation (equations in Part 4).","Options to exclude units or apply substitute newness rules introduce eligibility and evidentiary choices for proponents (ss14, 11).","Reporting, notification and record‑keeping rules impose administrative burdens and documentary proof obligations (ss31–36).","Criteria for dividing projects (including a 2,000 tCO2‑e threshold) affect project structuring and compliance strategy (s37).","Requirement that supplier‑provided emissions factors be on a sent‑out basis consistent with NGER Measurement rules adds technical reporting requirements (s19(2))."],"plain_english_summary":"Creates a methodology under the Carbon Credits (Carbon Farming Initiative) Act that lets project proponents claim carbon credits for installing specified high‑efficiency commercial appliances (liquid‑chilling packages, air conditioners, close‑control units, refrigerated display cabinets) in non‑residential buildings (s7, s10). It sets eligibility rules, precise baseline and project energy‑use formulas, reporting and record‑keeping obligations, and requires use of GEMS and NGA data and an efficiency‑factor document published by the Department (ss15–16, Part 4, Part 5)."},"kimi_summary":{"_metrics":{"model":"kimi-k2.5","source":"moonshot-realtime","completionTokens":2326},"content_quality":"ok","complexity_score":8,"scope_assessment":{"changed":false,"description":"The legislation remains tightly focused on its original purpose of providing a methodology for high efficiency commercial appliances projects. The 2016 amendments addressed minor corrections and facility-related provisions without expanding the substantive scope beyond the four original equipment categories (liquid-chilling packages, air conditioners, close control air conditioners, and refrigerated display cabinets) and their associated calculation methodologies."},"complexity_factors":["47+ defined technical terms including AS/NZS standard references (e.g., IPLV, AEER, ACOP, EERS)","14 distinct mathematical equations (Equations 1-14) for calculating baseline and project energy consumption across different equipment types","Extensive cross-referencing to external instruments: AS/NZS 3823.1.1:2012, AS/NZS 4965.1:2008, GEMS determinations, NGA Factors document, and Building Code of Australia","Conditional calculation logic based on equipment type, condenser type (air vs water), 8 NCC climate zones, and heating/cooling capability","6 schedules containing detailed classification tables dividing equipment into capacity ranges and product types (e.g., 12 classes of air conditioners, 47 classes of refrigerated display cabinets)","Requirement to reference and maintain an external 'efficiency factor document' published by the Department, with versioning rules and transitional provisions","Nested baseline calculations that differ for cooling vs heating functions and vary by climate zone capacity factors (Schedule 1)","Alternative emissions factor calculations for grid vs off-grid electricity with specific measurement methodology requirements"],"plain_english_summary":"This Determination lets commercial building owners earn carbon credits by installing new, high-efficiency chillers, air conditioners (including heat pumps), close‑control units and refrigerated display cabinets. It converts measured electricity savings—baseline vs actual use, adjusted by grid emissions intensity—into tradeable ACCUs.\n\nQualifying units must be new, GEMS‑registered, meet published efficiency thresholds and be commissioned after project eligibility. The rulebook aims to push businesses toward premium efficiency, cutting electricity demand and emissions."}},"importantCases":[],"_links":{"self":"/api/acts/carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina","history":"/api/acts/carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina/history","analysis":"/api/acts/carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina/analysis","conflicts":"/api/acts/carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina/conflicts","importantCases":"/api/acts/carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina/important-cases","documents":"/api/acts/carbon-credits-carbon-farming-initiative-high-efficiency-commercial-appliances-methodology-determina/documents"}}