{"id":"F2008L02516","name":"AD/ERJ-170/1 Amdt 3 - Cargo Doors","slug":"ad-erj-170-1-amdt-3-cargo-doors","collection":"legislative_instrument","jurisdiction":"commonwealth","status":"in_force","isInForce":true,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":74482,"registerId":"commonwealth-F2008L02516-current","compilationNumber":null,"startDate":"2026-04-02","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"Embraer ERJ-170 Series Aeroplanes","sectionType":"division","heading":"Embraer ERJ-170 Series Aeroplanes","content":"### Embraer ERJ-170 Series Aeroplanes\n\n| AD/ERJ-170/1 Amdt 3 | Cargo Doors | 8/2008 |\n| ------------------- | ----------- | ------ |\n\n| Applicability: | Models ERJ 170-100 LR, -100 STD, -100 SE, -100 SU, -200 LR, -200 STD, and -200 SU aircraft.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         |\n| -------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |\n| Requirement:   | 1. Accomplish a visual inspection to check that the forward and aft cargo doors are flush with the fuselage skin when closed, latched and locked, in accordance with the approved Minimum Equipment List procedures for cargo doors inoperative position indication, Chapter 52 “Doors”, item 70-00.2. Accomplish the following actions on the forward and aft cargo doors:a. Remove and discard the cover plate from the door surround trim lining in accordance with Embraer Alert Service Bulletin (ASB) No. 170-52-A036, or later ANAC approved revision.b. Accomplish a detailed visual inspection for signs of interference of the door handle with the aft edge liner assembly:(i) If any interference is found, rework the aft edge liner assembly in accordance with Embraer Service Bulletin No. 170-50-0006, or later ANAC approved revision.(ii) If no interference is found, rework the aft edge liner in accordance with Embraer Service Bulletin No. 170-50-0006, or later ANAC approved revision.c. Remove the aft surround trim lining and accomplish a detailed visual inspection for signs of damage of the lateral roller fitting on the fuselage forward and aft cargo door frames in accordance with Embraer ASBNo. 170-52-A036, or later ANAC approved revision:(i) If any damage is found, replace the lateral roller fitting with a serviceable bearing with the same part number.(ii) If no damage is found, no immediate action is required.3. Repeat the Requirement 2.c. requirements. |\n\n|             | 4. Accomplish the following actions on the fore and aft cargo doors:a. Relocate the cargo door closed indication sensor in accordance with Embraer SB No. 170-52-0041 original issue, or later ANAC approved revision;b. Modify the cargo door lock handle mechanism and replace the fore and aft cargo door roller fittings part number 170-92569-401 and 170-85452-401 with new fitting part numbers 170-92569-403 and 170-85452-403, respectively; in accordance with Embraer SB No. 170-52-0044 original issue, or later ANAC approved revision;5. After accomplishment of Requirement 4, revise the Aircraft Maintenance Plan to include the operational and functional check of the fore and aft cargo doors in accordance with Aircraft Maintenance Manual (AMM) tasks52-31-20-720-801-A/500, 52-31-00-710-801-A/500, 52-32-20-720-801-A/500, and 52-32-00-710-801-A/500, dated 7 December 2007.Note 1: Accomplishment of Requirements 4 and 5 constitutes terminating action to the repetitive inspections of Requirement 3.Note 2: Brazil ANAC AD 2007-03-01R1 Amdt 39-1234 refers. |\n| ----------- | -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |\n| Compliance: | 1. Before each aircraft departure after 23 March 2007; until accomplishment of Requirements 2.a., 2.b., and 2.c.2. Within 10 days after 23 March 2007.2.b. (i). Before further flight.2.b. (ii). Within 150 flight cycles after 23 March 2007.2.c. (i). Before further flight.3. At intervals not to exceed 150 flight cycles.4. Within 5,000 flight cycles after 31 July 2008, unless already accomplished.5. Check fore and aft cargo doors at intervals not to exceed 6,000 flight hours.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 |\n|             | This Amendment becomes effective on 31 July 2008.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            |\n| Background: | The ANAC received several reports of aircraft being dispatched and flown with a cargo door unlocked. This Directive requires certain actions to ensure the cargo doors can be closed and locked before dispatch for flight.Amendment 1 introduced terminating action to the compliance for Requirement 1.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    |\n\n|     | Amendment 2 restored the Requirement 3 text which was inadvertently omitted during amendment.Amendment 3 is issued in response to a revision of the related ANAC AD, which clarifies applicability and mandates terminating action to the repetitive inspection requirement. |\n| --- | ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |\n\n![](image.001.png)  \nDavid Villiers  \nDelegate of the Civil Aviation Safety Authority\n\n12 June 2008","sortOrder":0},{"sectionNumber":"AD/ERJ-170/1 Amdt 3","sectionType":"part","heading":"AD/ERJ-170/1 Amdt 3","content":"## AD/ERJ-170/1 Amdt 3","sortOrder":1},{"sectionNumber":"Cargo Doors","sectionType":"part","heading":"Cargo Doors","content":"## Cargo Doors","sortOrder":2},{"sectionNumber":"8/2008","sectionType":"part","heading":"8/2008","content":"## 8/2008","sortOrder":3}],"analysis":{"flash_summary":{"complexity_score":6,"scope_assessment":{"changed":false,"description":"Amendment 3 clarifies applicability and restores/aligns text with the related Brazil ANAC AD; it also explicitly designates the modification plus maintenance‑plan revision as terminating action for repetitive inspections. These are clarifications and alignment with the foreign airworthiness directive rather than a substantive expansion of the directive’s original safety purpose. The measure remains focused on ensuring cargo doors are secured and indicated correctly; it does not broaden the subject matter beyond that original intent."},"complexity_factors":["Multiple distinct action categories (initial pre‑flight checks, detailed inspections, repetitive inspections, modification/termination actions, maintenance plan revision).","Several different compliance timeframes tied to different dates and triggers (before each departure until certain actions done; within 10 days of a past date; before further flight; within 150 flight cycles; repeat every 150 flight cycles; within 5,000 flight cycles after 31 July 2008; checks every 6,000 flight hours).","Cross‑references to multiple external documents: Embraer Alert Service Bulletins (ASB), Service Bulletins (SB), Aircraft Maintenance Manual (AMM) tasks, ANAC/Brazil AD — compliance depends on later ANAC‑approved revisions.","Conditional branches in inspection outcomes (if interference/damage found ⇒ immediate rework/replace; if not found ⇒ scheduled rework within 150 flight cycles).","Replacement of parts requires specific part‑number changes (two old part numbers replaced by two new part numbers) and installation work.","Terminology and operational effect spread across numbered Requirements and separate Compliance/Notes, requiring cross‑checking to determine which inspections continue after which actions (i.e. terminating action logic).","Restoration of previously omitted text in earlier amendment creates traceability issues — operators need to ensure they follow the current, restored Requirement 3 text rather than earlier versions."],"plain_english_summary":"**What this directive does (mechanically)**\n\n- Requires operators of Embraer ERJ-170 series aeroplanes to carry out a sequence of inspections and modifications on the forward and aft cargo doors to ensure the doors close, latch and lock correctly, and for related sensors and fittings to be replaced or relocated. (See Requirement 1–5.)\n- Until the modification work is completed, it mandates repetitive pre-flight and periodic inspections of door fit and specific fittings. (See Requirement 1 and Compliance.)\n- After completing the specified modifications (relocating the closed indication sensor, modifying the lock handle mechanism, and replacing two roller-fitting part numbers), the operator must update the Aircraft Maintenance Plan to add recurring operational/functional checks; completing those modifications ends the repetitive inspection requirement. (See Requirement 4–5 and Note 1.)\n\n**Who this affects**\n\n- Aircraft owners and operators of Embraer ERJ‑170 models listed in Applicability (ERJ 170‑100 LR/STD/SE/SU and ERJ 170‑200 LR/STD/SU). (Applicability.)\n- Maintenance organisations and certificated engineers who must perform the inspections, rework, replacements and maintenance-plan revisions. (Requirements 2–5.)\n- Parts suppliers that provide the specified roller fittings and any replacement components called up by the Embraer service bulletins. (Requirements 2.c and 4.b.)\n\n**Why it matters (stated purpose and operational effect)**\n\n- Stated purpose: the regulator received several reports of aircraft being dispatched and flown with a cargo door unlocked. The actions are intended to ensure cargo doors are checked, can be secured properly, and that indications of door-closed status are reliable so aircraft are not dispatched with an unsecured cargo door. (Background; Note 2.)\n\n**Key required actions and timing (mechanics in plain terms)**\n\n- Immediate/short-term actions:\n  - Before each departure (until initial corrective actions are done) perform a visual check that forward and aft cargo doors are flush, latched and locked according to the aircraft’s Minimum Equipment List procedures. (Requirement 1; Compliance.)\n  - Within 10 days of 23 March 2007 do the initial removal of the door surround trim lining cover plate and perform detailed visual inspections for interference and damage, following Embraer Alert Service Bulletin (ASB) 170‑52‑A036 and Service Bulletin (SB) 170‑50‑0006. If interference/damage is found, rework or replace parts before further flight; otherwise certain rework is still required within 150 flight cycles. (Requirement 2.a–c and Compliance timings.)\n- Repetitive inspections:\n  - Repeat the inspection of lateral roller fittings at intervals not to exceed 150 flight cycles until terminating action is accomplished. (Requirement 3; Compliance.)\n- Modifications (terminating actions):\n  - Within 5,000 flight cycles after 31 July 2008, relocate the cargo door closed indication sensor (SB 170‑52‑0041) and modify the lock handle plus replace two roller fittings (SB 170‑52‑0044). Completing these actions and then updating the Maintenance Plan to include specified AMM functional checks terminates the repetitive inspection requirement. (Requirement 4–5; Note 1; Compliance.)\n\n**Who pays, who decides, and what behaviour changes**\n\n- Operators pay: labour for inspections, downtime, any rework or part replacements, and administrative cost to revise the Maintenance Plan. (Requirements 2–5; Compliance.)\n- The regulator (Civil Aviation Safety Authority delegate, via this Airworthiness Directive) decides the mandatory actions and deadlines; the operator and maintenance organisation decide scheduling and resource allocation to comply. (Directive text and signature.)\n- Behaviour changes required: more frequent pre‑flight/periodic inspections until mods are done; carrying out specified rework/part replacement and AMM/maintenance‑plan updates; and continuing periodic operational checks thereafter. (Requirements and Compliance.)\n\n**Costs, incentives, trade‑offs and implementation risks (practical testing of the stated purpose)**\n\n- Direct costs: labour time for initial and repetitive inspections, parts cost for the new roller fittings and any bearings replaced, and aircraft downtime while work is done. (Requirements 2.c, 4.b, Compliance intervals.)\n- Concentrated vs diffuse effects: the costs fall directly on individual operators (diffuse across operators), while parts manufacturers or authorized service providers will receive the concentrated purchase/rework business. (Requirements calling for specific part numbers and service bulletins.)\n- Operational trade‑offs: short‑term increase in pre‑flight checks and maintenance activity reduces the risk of dispatching with an unsecured door; operators must schedule inspections and modifications so as not to unduly disrupt flight operations. (Requirement 1; Note 1.)\n- Supply/implementation risk: compliance depends on availability of approved parts (the SBs specify replacement part numbers) and on access to approved revisions of Embraer ASBs/SBs or later ANAC‑approved revisions. If parts or approved revisions are delayed, operators may face extended repetitive inspection burden. (Requirements reference Embraer SBs/ASBs and ANAC approvals.)\n- Regulatory certainty: the AD cross‑references Brazil’s ANAC AD and requires actions in accordance with Embraer service documents or later ANAC‑approved revisions; this creates dependency on external approvals and international coordination for later revisions. (Note 2 and multiple references to ANAC approved revisions.)\n\n**Implementation note**\n\n- Completing the modification package (Requirement 4) and updating the Maintenance Plan (Requirement 5) is explicitly identified as terminating action for the repetitive inspections described in Requirement 3 (Note 1). Operators should plan to complete the modification package within the calendar/flight‑cycle windows to avoid ongoing repetitive inspection costs. (Requirement 4–5; Note 1.)"},"flash_summary_failed":{"failed":true,"reason":"Unauthenticated. Configure AI_GATEWAY_API_KEY or use a provider module. Learn more: https://ai-sdk.dev/unauthenticated-ai-gateway","source":"analysis-cron"},"kimi_summary":{"content_quality":"ok","complexity_score":6,"scope_assessment":{"changed":true,"description":"The original directive appears to have been a simple repetitive inspection requirement (Requirement 1 only). Amendment 1 added terminating action, Amendment 2 restored omitted text, and Amendment 3 expanded the scope significantly by adding Requirements 4 and 5 — mandating permanent hardware modifications (sensor relocation, part replacement) and maintenance plan revisions. The directive evolved from a 'check and monitor' approach to a comprehensive 'inspect, modify, and update systems' mandate."},"complexity_factors":["Multiple nested requirements with alphanumeric sub-numbering (1, 2.a, 2.b.(i), 2.b.(ii), etc.) creating conditional logic trees","Cross-references to external technical documents: Embraer Alert Service Bulletin 170-52-A036, Service Bulletins 170-50-0006, 170-52-0041, 170-52-0044, and specific Aircraft Maintenance Manual task numbers","Dual compliance pathways: repetitive inspections until terminating action is accomplished","Multiple compliance deadlines tied to different trigger dates (23 March 2007 vs 31 July 2008) and different metrics (flight cycles vs flight hours vs calendar days)","Specific part number references requiring precise component identification (170-92569-401 vs 170-92569-403)","Amendment history tracking (Amendments 1, 2, and 3) indicating iterative regulatory evolution","Reference to foreign aviation authority (Brazil ANAC AD 2007-03-01R1) requiring operators to track international regulatory alignment"],"plain_english_summary":"This mandatory CASA Airworthiness Directive targets a cargo‑door locking problem on Embraer ERJ‑170‑100/200 variants. It requires operators to do immediate preflight door checks, short‑term inspections for handle/liner and roller damage, and a long‑term modification (sensor relocation and improved fittings) plus recurring checks until completed. It affects owners/operators and prevents in‑flight cargo‑door opening, potential decompression, structural damage, or loss of cargo."}},"importantCases":[],"_links":{"self":"/api/acts/ad-erj-170-1-amdt-3-cargo-doors","history":"/api/acts/ad-erj-170-1-amdt-3-cargo-doors/history","analysis":"/api/acts/ad-erj-170-1-amdt-3-cargo-doors/analysis","conflicts":"/api/acts/ad-erj-170-1-amdt-3-cargo-doors/conflicts","importantCases":"/api/acts/ad-erj-170-1-amdt-3-cargo-doors/important-cases","documents":"/api/acts/ad-erj-170-1-amdt-3-cargo-doors/documents"}}