{"id":"F2008L02663","name":"AD/EMB-145/9 - Ventral Fuel Tank Refuelling Line","slug":"ad-emb-145-9-ventral-fuel-tank-refuelling-line","collection":"legislative_instrument","jurisdiction":"commonwealth","status":"in_force","isInForce":true,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":74700,"registerId":"commonwealth-F2008L02663-current","compilationNumber":null,"startDate":"2026-04-02","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"Embraer EMB-135 and EMB-145 Series Aerop","sectionType":"division","heading":"Embraer EMB-135 and EMB-145 Series Aeroplanes","content":"### Embraer EMB-135 and EMB-145 Series Aeroplanes\n\n| AD/EMB-145/9 | Ventral Fuel Tank Refuelling Line | 8/2008 |\n| ------------ | --------------------------------- | ------ |\n\n```html\n<table cellspacing=\"0\" cellpadding=\"0\" style=\"width:510.3pt; margin-top:0pt; margin-bottom:0pt; border-collapse:collapse\"><tbody><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Applicability:</span></p></td><td colspan=\"4\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>EMB-145XR model aircraft with serial numbers listed in Table 1.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"4\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p style=\"margin-left:163.05pt\"><span style=\"font-weight:bold\">Table 1</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td style=\"width:101pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>145590</span><br><span>145643</span><br><span>145645</span><br><span>145646</span><br><span>145649</span><br><span>145650</span><br><span>145654</span><br><span>145655</span><br><span>145657 thru 145660</span><br><span>145662</span><br><span>145664</span><br><span>145666</span><br><span>145672</span><br><span>145674</span><br><span>145675</span></p></td><td style=\"width:102.7pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>145677</span><br><span>145681</span><br><span>145683</span><br><span>145684</span><br><span>145688 thru 145690</span><br><span>145693</span><br><span>145697</span><br><span>145700</span><br><span>145703 thru 145705</span><br><span>145708</span><br><span>145712</span><br><span>145714</span><br><span>145718</span><br><span>145719</span><br><span>145721</span></p></td><td style=\"width:102.7pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>145727</span><br><span>145731 thru 145733</span><br><span>145735</span><br><span>145739</span><br><span>145741</span><br><span>145745</span><br><span>145746</span><br><span>145749</span><br><span>145751</span><br><span>145753</span><br><span>145756</span><br><span>145758</span><br><span>145759</span><br><span>145761</span><br><span>145772</span></p></td><td style=\"width:76.05pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>145782</span><br><span>145786</span><br><span>145787</span><br><span>145791</span><br><span>145792</span><br><span>145799</span><br><span>14500805</span><br><span>14500808</span><br><span>14500811</span><br><span>14500817</span><br><span>14500819</span><br><span>14500831</span><br><span>14500834</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Requirement:</span></p></td><td colspan=\"4\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Unless previously accomplished, install a bonding jumper between the pilot valve line tube and the pressure refuelling system tube, after removing ventral fuel tank access panel 196FR, as described in the Embraer Service Bulletin 145-28-0026, original issue, or further revisions approved by the Brazilian </span><span>Agência Nacional de Aviação Civil (</span><span>ANAC).</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"4\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p class=\"Note\"><span>Note:</span><span> </span><span>ANAC AD 2006-12-01 refers.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Compliance:</span></p></td><td colspan=\"4\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Within the next 10,000 hours time in service (TIS) for aircraft with less than 5,000 hours TIS, or within the next 5,000 hours TIS for aircraft with more than 5,000 hours, TIS after 4 January 2007 (the effective date ANAC AD 2006-12-01).</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"4\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>This Airworthiness Directive becomes effective on 31 July 2008.</span></p></td></tr></tbody></table>\n```\n\n| Background: | The ANAC has advised that the refuelling line inside the ventral fuel tank on the Embraer EMB-145XR aircraft model is not protected in accordance with SFAR-88 requirements. This Directive corrects that anomaly by the installation of a bonding jumper between the pilot valve line tube and the pressure refuelling system tube. |\n| ----------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ |\n\n![](image.001.png)  \nJames Coyne  \nDelegate of the Civil Aviation Safety Authority\n\n16 June 2008","sortOrder":0},{"sectionNumber":"AD/EMB-145/9","sectionType":"part","heading":"AD/EMB-145/9","content":"## AD/EMB-145/9","sortOrder":1},{"sectionNumber":"Ventral Fuel Tank Refuelling Line","sectionType":"part","heading":"Ventral Fuel Tank Refuelling Line","content":"## Ventral Fuel Tank Refuelling Line","sortOrder":2},{"sectionNumber":"8/2008","sectionType":"part","heading":"8/2008","content":"## 8/2008","sortOrder":3}],"analysis":{"flash_summary_failed":{"failed":true,"reason":"A positive credit balance is required for all requests, including BYOK, so fallback providers remain available. Add credits at https://vercel.com/d?to=%2F%5Bteam%5D%2F%7E%2Fai%3Fmodal%3Dtop-up to continue.","source":"analysis-cron"},"kimi_summary":{"content_quality":"ok","complexity_score":3,"scope_assessment":{"changed":false,"description":"This AD maintains its original narrow scope — addressing a specific fuel system safety deficiency in a particular aircraft model. It has not expanded beyond its original purpose of correcting the ventral fuel tank bonding issue identified by ANAC."},"complexity_factors":["Single, specific technical requirement with clear mechanical action (install bonding jumper)","Precise applicability limited to one aircraft model and specific serial numbers (60 aircraft listed in table)","Two-tier compliance deadline based on aircraft flight hours (simple conditional logic)","References external technical document (Embraer Service Bulletin) but provides specific alternative approval pathway (ANAC-approved revisions)","No defined terms section or extensive cross-referencing within the instrument itself","Background section explains regulatory context (SFAR-88) but doesn't create additional obligations"],"plain_english_summary":"CASA requires owners/operators of about 60 specified Embraer EMB‑145XR aircraft to fit an electrical bonding jumper on the ventral fuel refuelling line (per Embraer Service Bulletin 145‑28‑0026) to prevent dangerous static buildup during refuelling. Compliance is mandatory within set flight‑hour limits (shorter intervals for higher‑hour aircraft) to close an SFAR‑88 fuel‑tank safety gap and reduce risk of sparks, fire, or explosion."},"flash_summary":{"complexity_score":3,"scope_assessment":{"changed":false,"description":"The Directive implements ANAC’s corrective action described in ANAC AD 2006-12-01 by mandating the bonding jumper installation for the listed serial numbers per Embraer service data. It does not broaden the affected fleet or add requirements beyond the service bulletin and the stated hours‑in‑service compliance windows."},"complexity_factors":["Targeted population limited to specific EMB-145XR serial numbers listed in Table 1 (precision increases administrative filtering).","Technical task is narrowly defined: install a bonding jumper between two refuelling tubes and remove access panel 196FR (specialist maintenance, low procedural complexity).","Work must follow Embraer Service Bulletin 145-28-0026 or ANAC‑approved revisions (dependence on approved engineering data and potential revision control).","Compliance timing tied to hours-in-service thresholds (two tiers: aircraft with <5,000 TIS have 10,000‑hour window; >5,000 TIS have 5,000‑hour window measured after 4 Jan 2007), adding record-keeping and scheduling constraints for operators.","Regulatory coordination: CASA enforces an AD that implements an ANAC finding (cross-jurisdictional reliance on foreign authority approvals).","Operational impact: requires aircraft downtime and parts/labour procurement, which imposes direct cost and scheduling decisions on operators."],"plain_english_summary":"This Airworthiness Directive requires owners/operators of the listed Embraer EMB-145XR aircraft to install a bonding jumper between the pilot valve line tube and the pressure refuelling system tube inside the ventral fuel tank, following Embraer Service Bulletin 145-28-0026 (or later ANAC‑approved revisions). The work requires removal of ventral fuel tank access panel 196FR. Owners/operators pay for the modification and must schedule it within the Directive’s hours‑in‑service windows (5,000/10,000 TIS measured after 4 January 2007); CASA/ANAC enforce compliance."}},"importantCases":[],"_links":{"self":"/api/acts/ad-emb-145-9-ventral-fuel-tank-refuelling-line","history":"/api/acts/ad-emb-145-9-ventral-fuel-tank-refuelling-line/history","analysis":"/api/acts/ad-emb-145-9-ventral-fuel-tank-refuelling-line/analysis","conflicts":"/api/acts/ad-emb-145-9-ventral-fuel-tank-refuelling-line/conflicts","importantCases":"/api/acts/ad-emb-145-9-ventral-fuel-tank-refuelling-line/important-cases","documents":"/api/acts/ad-emb-145-9-ventral-fuel-tank-refuelling-line/documents"}}