{"id":"F2006L02238","name":"AD/B737/290 - P5 Panel","slug":"ad-b737-290-p5-panel","collection":"legislative_instrument","jurisdiction":"commonwealth","status":"in_force","isInForce":true,"actNumber":null,"makingDate":null,"administeringDepartment":null,"currentVersion":{"id":117564,"registerId":"commonwealth-F2006L02238-current","compilationNumber":null,"startDate":"2026-04-03","status":"InForce","reasons":null,"registeredAt":null},"sections":[{"sectionNumber":"Boeing 737 Series Aeroplanes","sectionType":"division","heading":"Boeing 737 Series Aeroplanes","content":"### Boeing 737 Series Aeroplanes\n\n| AD/B737/290 | P5 Panel | 8/2006 |\n| ----------- | -------- | ------ |\n\n| Applicability: | Model 737-600, -700, -700C, -800 and -900 series aeroplanes, certificated in any category; as identified in Boeing Service Bulletin (SB) 737-24A1141, Revision 2, dated 1 December 2005.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  |\n| -------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |\n| Requirement:   | 1. Accomplish the following actions in accordance with the Accomplishment Instructions of SB 737-24A1141, Revision 2:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     |\n|                | a. Replace the five brackets that hold the P5 panel to the aeroplane structure with new brackets;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         |\n|                | b. Do a general visual inspection for wire length and damage of the connectors and the wire bundles;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      |\n|                | c. Make wiring changes;                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   |\n|                | d. Replace the standby compass bracket assembly with a new assembly; and                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  |\n|                | e. Replace the stud assemblies with new assemblies.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       |\n|                | Note 1: For the purposes of this Directive, a general visual inspection is: \"A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.\" |\n|                | 2. Carry out any applicable corrective actions of deficiencies detected during the Requirement 1.b. inspection in accordance with the Accomplishment Instructions of SB 737-24A1141, Revision 2.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          |\n|                | Actions accomplished before the effective date of this Directive in accordance with Boeing Alert Service Bulletin 737-24A1141, Revision 1, dated 23 December 2004, are acceptable for compliance with the equivalent requirements of this Directive.                                                                                                                                                                                                                                                                                                                                                                                                                                                      |\n|                | 3. Carry out the concurrent actions specified in Table 1, as applicable to each aeroplane as identified in the Boeing Component Service Bulletin (CSB).                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   |\n\n```html\n<table cellspacing=\"0\" cellpadding=\"0\" style=\"width:510.3pt; margin-top:0pt; margin-bottom:0pt; border-collapse:collapse\"><tbody><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; border-bottom:0.75pt solid #000000; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p style=\"text-align:center\"><span style=\"font-weight:bold\">Table 1 - Concurrent Requirements</span></p></td></tr><tr><td style=\"width:74.35pt; border-right:0.75pt solid #000000; padding-right:4.97pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td style=\"width:143.5pt; border:0.75pt solid #000000; padding-right:4.97pt; padding-left:4.97pt; vertical-align:top\"><p style=\"text-align:center\"><span style=\"font-weight:bold\">For Aeroplanes Identified in Boeing CSB</span></p></td><td style=\"width:260.35pt; border:0.75pt solid #000000; padding-right:4.97pt; padding-left:4.97pt; vertical-align:top\"><p style=\"text-align:center\"><span style=\"font-weight:bold\">Action</span></p></td></tr><tr><td style=\"width:74.35pt; border-right:0.75pt solid #000000; padding-right:4.97pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td style=\"width:143.5pt; border:0.75pt solid #000000; padding-right:4.97pt; padding-left:4.97pt; vertical-align:top\"><p><span>233A3205-24-01 dated</span><br><span>26 July 2001</span></p></td><td style=\"width:260.35pt; border:0.75pt solid #000000; padding-right:4.97pt; padding-left:4.97pt; vertical-align:top\"><p><span>Modify the generator drive and standby power module assembly in accordance with the Accomplishment Instructions of the CSB.</span></p></td></tr><tr><td style=\"width:74.35pt; border-right:0.75pt solid #000000; padding-right:4.97pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td style=\"width:143.5pt; border:0.75pt solid #000000; padding-right:4.97pt; padding-left:4.97pt; vertical-align:top\"><p><span>69-37319-21-02, Revision 1, dated 30</span><span> </span><span>August</span><span> </span><span>2001</span></p></td><td style=\"width:260.35pt; border:0.75pt solid #000000; padding-right:4.97pt; padding-left:4.97pt; vertical-align:top\"><p><span>Modify the air conditioning module assembly in accordance with the Accomplishment Instructions of the CSB.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Later revisions of the above SBs, approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2006-10-17, are considered acceptable for compliance with the equivalent Requirements of this Directive.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p class=\"Note\"><span>Note 2:</span><span> </span><span>FAA AD 2006-10-17 Amdt 39-14601 refers.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Compliance:</span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>For Requirement 1 - Within 36 months after the effective date of this Directive.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>For Requirement 2 - Before further flight after the Requirement 1.b. inspection.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>For Requirement 3 - Either concurrently with or before Requirement 1.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>This Airworthiness Directive becomes effective on 3 August 2006.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Background:</span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>This Directive requires replacing brackets that hold the P5 panel to the aeroplane structure, the standby compass bracket assembly, the generator drive and standby power module together with the air conditioning module.</span><span> </span><span>The Directive also requires, among other actions, inspecting for wire length and for damage of the connectors and the wire bundles, together with the accomplishment of any necessary corrective actions.</span></p></td></tr><tr><td style=\"width:74.35pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span></span></p></td><td colspan=\"2\" style=\"width:414.55pt; padding-right:5.35pt; padding-left:5.35pt; vertical-align:top\"><p><span>Actions specified by this Directive are designed to prevent wire bundles from contacting the overhead dripshield panel and modules in the P5 overhead panel, which could result in electrical arcing and shorting of the electrical connector and consequent loss of several critical systems essential for safe flight.</span></p></td></tr></tbody></table>\n```\n\n![](image.001.png)  \nJames Coyne  \nDelegate of the Civil Aviation Safety Authority\n\n21 June 2006","sortOrder":0},{"sectionNumber":"AD/B737/290","sectionType":"part","heading":"AD/B737/290","content":"## AD/B737/290","sortOrder":1},{"sectionNumber":"P5 Panel","sectionType":"part","heading":"P5 Panel","content":"## P5 Panel","sortOrder":2},{"sectionNumber":"8/2006","sectionType":"part","heading":"8/2006","content":"## 8/2006","sortOrder":3}],"analysis":{"kimi_summary":{"content_quality":"ok","complexity_score":4,"scope_assessment":{"changed":false,"description":"This Airworthiness Directive maintains its original scope as a targeted safety intervention for specific Boeing 737 models. The directive addresses a well-defined mechanical and electrical safety issue (P5 panel bracket failure and wiring damage) without expanding into broader operational or regulatory matters. The inclusion of concurrent modifications to generator and air conditioning modules represents integral related work rather than scope creep, as these modules are physically connected to the P5 panel assembly being modified."},"complexity_factors":["Multiple cross-references to external Boeing Service Bulletins (SB 737-24A1141, Revision 2) and Component Service Bulletins (CSBs) that must be consulted to understand full requirements","Conditional logic requiring operators to determine applicability based on specific aircraft identification in Boeing documentation","Nested compliance timelines with three different deadlines depending on which requirement is being addressed","Incorporation by reference of US Federal Aviation Administration (FAA) approvals for alternative compliance methods (AMOCs)","Technical aviation terminology requiring specialised knowledge (P5 panel, wire bundles, dripshield, generator drive modules)","Table-based concurrent requirements that create interdependencies between different modification tasks","Grandfathering clause allowing prior work under earlier bulletin revision to count as compliance"],"plain_english_summary":"This CASA Airworthiness Directive requires operators of Boeing 737-600/700/700C/800/900 series to replace P5 panel brackets and carry out related wiring and bracket/assembly changes to prevent wires contacting metal and causing electrical arcing, shorting or loss of critical flight systems. It applies to all operators and maintenance organisations for those models, with main work mandated within 36 months and any defects fixed before next flight."},"flash_summary_failed":{"failed":true,"reason":"A positive credit balance is required for all requests, including BYOK, so fallback providers remain available. Add credits at https://vercel.com/d?to=%2F%5Bteam%5D%2F%7E%2Fai%3Fmodal%3Dtop-up to continue.","source":"analysis-cron"},"flash_summary":{"complexity_score":6,"scope_assessment":{"changed":false,"description":"The Directive applies to the aircraft models and serials identified in Boeing SB 737‑24A1141 Revision 2 and requires the listed parts replacements, wiring changes and inspections. It expressly permits prior compliance performed under Boeing Alert SB Revision 1 and incorporates concurrent CSB actions only for aeroplanes so identified, aligning the AD’s scope with the Boeing SBs and FAA AD referenced. There is no expansion of applicability beyond the SB/CSB identification in the text."},"complexity_factors":["Multiple distinct mandatory tasks (parts replacement, wiring changes, general visual inspection, corrective repairs) — Requirement 1 (a–e), Requirement 2","Dependency on Boeing Service Bulletin (SB 737‑24A1141 Rev 2) for detailed Accomplishment Instructions — Requirement 1","Concurrent modifications required for some aeroplanes per Boeing Component Service Bulletins (Table 1); sequencing constraints (either concurrently with or before Requirement 1) — Requirement 3, Table 1","Compliance timing and operational constraint: main work due within 36 months; corrective actions after inspection must be done before further flight — Compliance (36 months); Requirement 2","Acceptance of earlier work under Boeing Alert SB Revision 1 creates an alternative compliance path for some operators — paragraph on actions accomplished before effective date","Interoperability with FAA approvals and Alternate Methods of Compliance (AMOC) for later CSB revisions — Table 1 note and Note 2 referencing FAA AD 2006‑10‑17","Technical inspection standard requires close visual checks, possible removal of access panels and use of mirrors/stands — Note 1 (definition of general visual inspection)","Administrative burden: tracking applicability to specific serials as identified in SB/CSB and recording compliance with FAA‑approved revisions"],"plain_english_summary":"Requires operators of Boeing 737‑600/700/700C/800/900 aeroplanes identified in Boeing SB 737‑24A1141 Revision 2 to replace P5 overhead‑panel brackets and assemblies, make specified wiring changes, inspect wire lengths and connectors, and perform any corrective repairs, all following Boeing’s instructions. The declared safety objective is to prevent wire bundles contacting the overhead dripshield and modules — which the instrument says could cause electrical arcing and loss of critical systems. Operators pay for parts, labour and downtime; compliance is required within 36 months and prior work under Revision 1 is accepted."}},"importantCases":[],"_links":{"self":"/api/acts/ad-b737-290-p5-panel","history":"/api/acts/ad-b737-290-p5-panel/history","analysis":"/api/acts/ad-b737-290-p5-panel/analysis","conflicts":"/api/acts/ad-b737-290-p5-panel/conflicts","importantCases":"/api/acts/ad-b737-290-p5-panel/important-cases","documents":"/api/acts/ad-b737-290-p5-panel/documents"}}